A Multi-Cohort Weighted Calibration Approach to Rectifying Subjective Bias in Construction Site LEC Hazard Identification

Abstract

Traditional Likelihood-Exposure-Consequence (LEC) safety evaluations suffer from pronounced subjective variance and cognitive bias in construction site risk management. To overcome the methodological limitations, this study establishes a multi-cohort empirical framework analyzing 120 validated assessments across eight high-frequency construction cases evaluated by safety domain experts (SDE), frontline operational workers (FOW), and non-specialist personnel (NSP). Statistical decomposition of individual risk parameters demonstrates that accident likelihood ( L ) and exposure frequency ( E ) maintain strong baseline consensus across cohorts, whereas consequence severity ( C ) acts as the primary driver of subjective rating variance, which is nonlinearly amplified through the multiplicative risk score D=L×E×C . Frontline operational workers consistently underestimate high-hazard risks owing to habituation bias, whereas non-specialist personnel display extreme risk polarization due to domain knowledge deficits. In order to rectify the systemic cognitive distortions, situation-specific calibration coefficients ( k= D expert / D evaluated ) were mathematically derived. Empirical results demonstrate that overestimated hazards require scaling factors below 0.8 ( k<0.8 ) to compress inflated scores, while severely underestimated operations such as scaffold erection require scaling factors exceeding 1.4 ( k>1.4 ) to restore risk ratings to expert reference levels. Integrating multi-stakeholder consensus with dynamic calibration matrices transforms subjective field experience into a standardized risk assessment protocol, substantially optimizing safety resource allocation and hazard identification in construction management.

Share and Cite:

Shi, M. , Cu, X. , Feng, N. , Kang, S. and Huang, X. (2026) A Multi-Cohort Weighted Calibration Approach to Rectifying Subjective Bias in Construction Site LEC Hazard Identification. Open Journal of Safety Science and Technology, 16, 195-226. doi: 10.4236/ojsst.2026.164012.

1. Introduction

The modern construction industry has experienced unprecedented expansion, characterized by escalating structural complexity, ultra-high-rise geometries, deep underground excavations, and highly concentrated spatial-temporal site logistics [1]-[5]. Despite ongoing technological advancements in safety governance, construction sites remain high-hazard environments. As indicated by Jaafar et al. [6], complex operational cross-working, dynamic site layouts, and high workforce mobility collectively contribute to a volatile risk landscape. Including falls from height, structural collapses, mechanical impacts, electrical shocks, and hazardous confined-space asphyxiation, fatal and disabling safety incidents continue to inflict severe casualties, immense financial losses, and persistent disruptions to sustainable industry development [7]-[12]. Based on the current situation, the precise identification of site hazard sources, rigorous quantification of operational safety risks, and implementation of dynamic, tiered risk control frameworks constitute the cornerstone of contemporary occupational health and safety management systems (OHSMS).

Among the quantitative safety risk assessment (QSRA) tools used in construction engineering derived from the Fine-Kinney risk evaluation framework, the Likelihood-Exposure-Consequence ( LEC ) method is widely adopted [13]-[17]. The classical LEC model evaluates operational risk by combining accident likelihood ( L ), exposure frequency ( E ), and consequence severity ( C ) into a composite risk score D, then mapping it to standardized risk thresholds to guide dynamic hazard-control protocols.

The ubiquitous adoption of the LEC method in construction safety management stems from its procedural simplicity, computational efficiency, and intuitive risk categorization. Referring to Zhang et al. [18] and Xu et al. [19], the LEC method serves as a fundamental analytical tool for compiling special safety construction plans, conducting routine hazard inspections, and establishing dynamic risk governance hierarchies.

However, extensive engineering practice reveals a systemic structural vulnerability in the conventional LEC method because it is susceptible to cognitive subjectivity and lacks a standardized cross-role calibration mechanism [20] [21]. In routine field operations, single assessors or isolated job-role personnel conduct risk evaluations. Referring to Chionis & Karanikas [22] and Baybutt [23], because human risk perception is mediated by individual professional backgrounds, field experience, safety literacy, and psychological heuristics, the numerical assignment of L, E, and C exhibits substantial inter-evaluator variance. Furthermore, because D is calculated via a multiplicative function ( D=L×E×C ), individual parameter errors do not merely summate, but propagate non-linearly. Referring to Anthony et al. [24] and Hong et al. [25], a minor subjective disparity in C (which typically carries the largest numerical magnitude) amplifies the variation in D, distorting the true risk level and causing severe misclassifications. Such distortions result in either over-regulation (wasting project resources) or under-regulation (leaving critical hazards unmitigated).

In construction safety engineering, including Safety Domain Experts, Frontline Operational Workers, and Non-Specialist (Lay) Personnel, field evaluators can be categorized into three representative stakeholder cohorts based on their professional capacity and operational immersion. As shown in Table 1, the cohorts exhibit stark cognitive divergence in safety risk perception due to underlying psychological and experiential mechanisms.

Table 1. Conceptual taxonomy of risk perception divergence across evaluator cohorts.

Evaluator Cohort

Capacity Profile

Site Immersion

Core Psychological

Experiential Driver

Dominant Perception Trait

SDE

High

(Regulatory)

Low

Audit-based

Top-down processing

Historical hazard analytics

Systemic

Proactive

FOW

Moderate

(Task-specific)

High

Continuous

Normalization of deviance

Survivorship bias

Localized

Attenuated

NSP

Low

(Unformed)

Minimal

Transient

Affect heuristic

Salience bias

Surface-Level

Over-reactive

Note: SDE = Safety Domain Experts; FOW = Frontline Operational Workers; NSP = Non-Specialist Personnel.

Following the contents of Table 1, relying on a single evaluator cohort without cross-role alignment yields risk assessments that suffer from high stochastic noise, poor repeatability, and inadequate empirical validity.

To overcome the subjective limitations of the traditional LEC method, previous studies have proposed various advanced mathematical augmentations [26]-[30]. As shown in Zhao et al. [21], a major stream of studies integrates Fuzzy Set Theory (FST), Analytic Hierarchy Process (AHP), and Interval-Valued Intuitionistic Fuzzy Logic into the LEC structure to convert linguistic variables into mathematical intervals. While the hybrid fuzzy-LEC models reduce subjective vagueness to some degree, they also suffer from two major drawbacks in Figure 1.

Referring to the existing drawbacks in Figure 1 by Gul. [31], few studies have quantified the multi-cohort cognitive deviation matrix across diverse construction sites, nor have they developed a practical, scalar perturbation-based calibration mechanism to harmonize multi-subject ratings to unified safety domain experts.

Figure 1. Framework of the hybrid fuzzy-LEC model.

To bridge the gaps above, this study presents a comprehensive quantitative framework designed to measure, model, and calibrate the multi-subject cognitive subjective errors inherent in the LEC evaluation method. This study investigates the systematic scoring deviations across safety domain experts (SDE), frontline operational workers (FOW), and non-specialist personnel (NSP) by capturing the empirical risk ratings of 120 validated respondents across 8 representative high-frequency construction cases (ranging from high-altitude operations and temporary electrical works to scaffold erection and trench excavation).

2. Methodology and Data Collection

2.1. Questionnaire Design and Participants

Drawing on Song & Zhang [32] and Brunel et al. [33], the evaluation subjects, including the general public (non-specialist personnel), on-site frontline operational workers, and industry safety domain experts, were stratified into three cohorts based on professional competency and hazard perception. Out of 500 distributed questionnaires, a rigorous screening process yielded 120 valid responses. To ensure data reliability and eliminate arbitrary scoring, incomplete or logically inconsistent submissions were excluded, ultimately retaining 20 valid questionnaires from safety domain experts, 40 from on-site frontline operational workers, and 60 from the general public.

As shown in Table 2, although the SDE sample size (n = 20) is relatively small compared with the FOW (n = 40) and NSP (n = 60) cohorts, the SDE group represents a highly filtered, homogeneous tier of certified senior engineers and safety directors. Statistical dispersion metrics in this study indicate high intra-group consensus among SDEs, which suppresses outlier susceptibility and ensures the robustness of the reference metric despite the imbalanced cohort sizes.

Table 2. Profiles of the 8 representative high-frequency construction cases and the research design framework.

Situation

Operational Reference Cases

Primary Hazard Category

Potential Consequences(Linked to C-Factor)

Evaluator Cohorts(Total n = 120)

CASE-1

High-altitude operations(e.g., perimeter work, roofing)

Gravitational Kinetic

Falls from height Fatalities Severe musculoskeletal trauma

SDE, FOW, NSP

CASE-2

Temporary electrical works(e.g., site power distribution)

Electrical

Electric shock Electrocution Secondary electrical fires

SDE, FOW, NSP

CASE-3

Scaffold erection and dismantling

Structural Mechanical

Structural collapse Crushing Mass casualties

SDE, FOW, NSP

CASE-4

Trench excavation and earthworks

Geotechnical

Cave-ins Burial asphyxiation Utility strikes

SDE, FOW, NSP

CASE-5

Tower crane lifting and hoisting operations

Mechanical Operational

Crane overturning Dropped heavy loads Fatal striking

SDE, FOW, NSP

CASE-6

Confined space operations(e.g., sewage tanks, deep shafts)

Atmospheric Chemical

Toxic gas poisoning Oxygen deficiency asphyxiation

SDE, FOW, NSP

CASE-7

Hot works(e.g., on-site welding, gas cutting)

Thermal Fire

Major explosions Severe burns Extensive property damage

SDE, FOW, NSP

CASE-8

Heavy mobile machinery operations (e.g., excavators)

Mechanical Kinetic

Run-over injuries Crushing Collision with personnel

SDE, FOW, NSP

Note: SDE = Safety Domain Experts (n = 20); FOW = Frontline Operational Workers (n = 40); NSP = Non-Specialist Personnel (n = 60). Note: All 120 validated respondents provided complete empirical LEC risk ratings across all 8 cases (CASE-1 to CASE-8). CASE-1 to CASE-4 correspond directly to the focal operations mentioned in the study design, while CASE-5 to CASE-8 complete the comprehensive operational spectrum of high-risk site activities.

Referring to the previous study of Al-Bayati & Chellappa [34], such as senior engineers, engineers, certified constructors, safety supervisors, and qualified surveyors, the expert cohort was defined as professionals holding relevant industry certifications with a minimum of three years of active domain experience. Specifically, this expert sample is predominantly composed of individuals born between 1980 and 1989 (13 individuals, accounting for 65%). The remaining age distribution includes 4 individuals born between 1970 and 1979 (20%), 2 individuals born between 1990 and 1999 (10%), and 1 individual born between 2000 and 2009 (5%).

Also, to comprehensively represent the complex risk landscape of modern construction environments, the survey in this study evaluated eight high-frequency, typical on-site operational cases as shown in Table 2.

2.2. LEC Risk Assessment Framework

The foundational analytical model employed in this study is the LEC operational condition hazard evaluation method, while the mathematical framework is expressed as:

D=L×E×C (1)

where the variables are formally defined as follows:

1) L (Likelihood): Represents the probability of an accident occurring, defined on a continuous scale with discrete reference values ranging from 0.1 to 10.

2) E (Exposure): Denotes the frequency of human exposure to the hazardous environment, with values ranging from 0.5 to 10.

3) C (Consequence): Indicates the severity of the consequences should an accident occur, with values ranging from 1 to 100.

4) D (Danger/Total Risk Score): Represents the cumulative hazard score. Based on the calculated magnitude of D, occupational hazards are classified into five distinct risk levels, where a higher value strictly correlates with a greater operational risk.

Furthermore, referring to GB/T 33000-2025 (Requirements of work safety management system for large and medium-sized enterprises), T/XZBX 0154-2025 (Code for safety risk classification management and control of construction engineering site), and T/CCPITBSC 096-2025 (Specifications for safety risk prevention and control in high-rise building construction), this study applies the adopted L, E, and C grading tables and corresponding common risk classification standards, which are shown in Table 3.

Table 3. Standardized LEC valuation matrix.

Evaluation Metric

Score

Qualitative Description

Likelihood of an Accident (L)

10

Inevitable

6

Completely expected

3

Highly possible

1

Likely

0.5

Possible, but infrequent

0.2

Unlikely

0.1

Extremely unlikely

Exposure Frequency to Hazard (E)

10

Continuous exposure

6

Exposed daily during working hours

3

Exposed once a week

2

Exposed once a month

1

Exposed several times a year

0.5

Extremely rare

Severity of Consequences (C)

100

Catastrophic disaster

40

Multiple fatalities

15

Single fatality

7

Serious injury

3

Minor injury

1

Noticeable/Requires attention

3. Discussion

3.1. Comparative Analysis

To systematically elucidate the domain-specific subjective evaluation bias inherent in the traditional Likelihood-Exposure-Consequence (LEC) safety assessment framework, including safety domain experts ( N=20 ), frontline operational workers ( N=40 ), and non-specialist personnel ( N=60 ), raw metric scores assigned by three distinct evaluator cohorts were processed using four scaling adjustment coefficients ( k=0.8,1.0,1.2,1.4 ). As shown in Figure 2, including the arithmetic mean ( μ ) and standard deviation ( σ ), statistical metrics were synthesized across eight representative construction operational cases to characterize score hierarchies and inter-group dispersions.

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

Figure 2. Mean scores analysis of the operational condition risk assessment. (a) High-altitude operations, (b) Temporary electrical works, (c) Scaffold erection and dismantling, (d) Trench excavation and earthworks, (e) Tower crane lifting and hoisting operations, (f) Confined space operations, (g) Hot works, (h) Heavy mobile machinery operations.

3.1.1. Dimensional Hierarchies & Quantitative Magnitude Distribution

Referring to Kokangül et al. [35], raw metric scores were first transformed using the scaling coefficient k to evaluate the dimensional characteristics without confounding mathematical domain bounds with cognitive risk weights. Let x m,s,i raw denote the raw metric score assigned for dimension m∈{ L,E,C } by individual i in scenario s∈{ 1,2,⋯,8 } . The adjusted score x m,s,i ( k ) under scaling factor k is formulated as:

x m,s,i ( k ) =k⋅ x m,s,i raw ,  k∈{ 0.8,1.0,1.2,1.4 } (2)

Because the baseline assignment domains defined by the traditional LEC lookup framework are inherently non-uniform, where L∈[ S L min , S L max ]=[ 0.1,10 ] , E∈[ S E min , S E max ]=[ 0.5,10 ] , C∈[ S C min , S C max ]=[ 1,100 ] , direct numerical comparisons of raw averages ( x ¯ C > x ¯ E > x ¯ L ) induce a deceptive scalar artifact. To decouple the intrinsic domain boundary effects from genuine subjective risk weights, a dimensionless normalized metric x ˜ m,s,i ( k ) is established via min-max domain mapping:

x ˜ m,s,i ( k ) = x ¯ m,s,i ( k ) −k⋅ S m min k⋅( S m max − S m min ) = x ¯ m,s,i raw − S m min S m max − S m min (3)

Furthermore, the relative partial elasticity ϵ m of the risk score D=L⋅E⋅C with respect to each metric dimension m demonstrates equal mathematical weighting in logarithmic derivative space:

ϵ m = ∂lnD ∂lnm = m D ⋅ ∂D ∂m =1 , ∀m∈{ L,E,C } (4)

As shown above, Equation (4) proves that the multiplicative structure of the LEC model imparts identical relative sensitivity ( ϵ L = ϵ E = ϵ C =1 ) to all three parameters. Consequently, any observed raw absolute dominance of C over L and E is purely an artifact of scale allocation bounds ( S C max / S L max =10 ) rather than an inherent structural priority of risk severity over likelihood or exposure.

Across all eight construction operational cases in Figure 2, raw score averages exhibit a persistent numerical hierarchy where x ¯ C ∈[ 3.68,33.50 ] significantly exceeds x ¯ E ∈[ 2.19,7.21 ] and x ¯ L ∈[ 0.44,3.58 ] . In high-hazard operations such as High-altitude Work (Figure 2(a)) and Scaffolding Erection (Figure 2(h)), raw mean scores for Consequence Severity ( C ) reach peak values exceeding 30.0 under k=1.4 . Conversely, in lower-severity tasks like Ground Material Handling (Figure 2(e)) and Mechanical Cutting (Figure 2(c)), raw C scores drop to lower ranges ( x ˜ C =3.68~11.38 ). However, when evaluated through the dimensionless normalized metric x ˜ m,s,i ( k ) , the apparent dominance of C diminishes substantially. In routine handling operations (Figure 2(e)), normalized exposure frequency x ˜ E =0.28~0.45 actually surpasses normalized consequence severity x ˜ C =0.03~0.08 , demonstrating that risk magnitude in non-catastrophic tasks is primarily driven by exposure persistence rather than extreme loss potential.

An analytical difference in this study revealed by the four scaling coefficients ( k=0.8,1.0,1.2,1.4 ) is the non-linear compound expansion of the total risk score D . Since D ( k ) = k 3 ⋅ D raw , applying scalar multipliers linearly expands individual parameters but exponentially inflates total risk scores. In high-consequence cases (e.g., High-altitude Work in Figure 2(a) and Trench Edge Protection in Figure 2(f)), this multiplicative amplification magnifies initial raw evaluation discrepancies by up to 1.4 3 ≈2.744 times. This exponential scaling underscores the vulnerability of traditional uncalibrated LEC scoring, as small subjective variance in high-bounded dimensions ( C ) disproportionately skews final risk classification thresholds ( D ).

3.1.2. Dimension-Specific Cognitive Dispersions & Scale Range Effects

As noted in Bedeian & Mossholder [36], to quantify inter-group evaluation dispersion independent of scalar magnitude, the dimensionless Coefficient of Variation ( C V m,i,s ) is formulated for each dimension m , cohort i , and situation s :

C V m,s,i = σ m,s,i ( k ) x ¯ m,s,i ( k ) = k⋅ σ m,i,s raw k⋅ x ¯ m,i,s raw = σ m,i,s raw x ¯ m,i,s raw (5)

where σ m,i,s represents the sample standard deviation. Equation (5) confirms that CV is invariant under linear scaling factors k , rendering it a robust metric for cross-cohort reliability analysis. To capture the extent to which baseline metric scale ranges ( S m max − S m min ) distort absolute variance perception, the Scale Range Effect ( SR E m,i,s ) is defined as:

SR E m,s,i = σ m,i,s ( k ) k⋅( S m max − S m min ) = σ m,i,s raw S m max − S m min (6)

In addition, referring to Xu [37], the Inter-Cohort Discrepancy Index ( D I m,s ) measures the standardized distance between non-expert cohorts ( i∈{ Workers,Oridinary } ) and the safety domain experts ( i=Expert ):

D I m,s = 1 2 ⋅ ∑ i∈{ Work,Oridinary } ( x ¯ m,i,s − x ¯ m,Expert,s x ¯ m,Expert,s ) 2 (7)

Empirical observations across Figures 2(a)-(h) reveal a stark dichotomy between absolute standard deviation ( σ ) and relative dispersion ( CV ). Across all cases, Likelihood ( L ) and Exposure ( E ) display tight absolute error bars ( σ L ∈[ 0.47,3.58 ] , σ E ∈[ 1.73,4.57 ] ), whereas Consequence Severity ( C ) exhibits massive absolute standard deviations ( σ C ∈[ 2.51,42.69 ] ). However, evaluating relative dispersion via Equation (5) reverses this visual impression: C V L  ( 0.42~0.85 ) and C V E  ( 0.38~0.62 ) exhibit higher relative dispersion than C V C  ( 0.25~0.55 ) in routine tasks. The discussions in this study prove that while evaluators reach numerical convergence on L and E due to constrained baseline options ( [ 0.1,10 ] and [ 0.5,10 ] ), their underlying relative cognitive uncertainty regarding event probability remains substantial.

The vast absolute standard deviation observed in Consequence Severity ( σ C ) is predominantly driven by the Scale Range Effect ( SR E C ). Because the scoring bounds for C span across two orders of magnitude (1~100), discrete leaps between rating anchors (e.g., jumping from 15 “single fatality” to 40 “multiple fatalities”) generate huge statistical variance. In High-altitude Work (Figure 2(a)), Confined Space Inspection (Figure 2(d)), and Scaffolding Erection (Figure 2(h)), Non-specialist personnel and Workers exhibit extreme variance ( σ C >30.0 under k=1.4 ). The wide spread in this study reflects divergent cognitive interpretations of worst-case accident outcomes versus nominal operational incidents among non-expert personnel.

As scaling coefficients increase from k=0.8 to k=1.4 , absolute error bar spans in Figures 2(a)-(h) dilate proportionally ( σ ( k ) =k⋅ σ raw ), while the visual widening of error bars in this study must not be misinterpreted as deteriorating evaluation consensus at higher scaling factors. Because CV remains perfectly constant across all k values, linear scaling alters only the visual metric resolution without changing the underlying stochastic consistency of cohort perceptions. Nevertheless, the Inter-Cohort Discrepancy Index ( D I C,s ) confirms that inter-group divergence is highest in Consequence Severity ( C ), pinpointing C as the primary source of subjective bias in multi-cohort safety risk assessment.

3.1.3. Situation-Dependent Risk Perception Patterns across Evaluator Cohorts

According to Zhao et al. [38] and Sjöberg [39], to model cohort-specific cognitive bias across varying operational contexts, the Cohort Perception Bias ( Δ μ m,i,s ) relative to the safety domain experts is defined as:

Δ μ m,i,s = x ¯ m,i,s − x ¯ m,Expert,s , i={ Work,Ordinary } (8)

To evaluate how each evaluator cohort perceives relative risk severity across the spectrum of operational cases, the Situation Risk Sensitivity Index ( RS I i,s ) is established:

RS I i,s = D i,s 1 8 ⋅ ∑ s ′ =1 8   D i, s ′ (9)

Furthermore, the overall Cognitive Divergence Metric ( CD M s ) synthesizes multi-dimensional perceptual variance across all three parameters for a given situation s :

CD M s = ∑ m∈{ L,E,C } ( x ¯ m,Works,s − x ¯ m,Ordinary,s x ¯ m,Expert,s ) 2 (10)

Analysis of Figure 2(a) to Figure 2(b) demonstrates distinct, situation-dependent cognitive patterns among the three evaluator cohorts. The safety domain experts ( N=20 ) display structured, risk-discriminative behavior, assigning high risk scores ( D ) exclusively to high-consequence, structurally complex operations, such as High-altitude Work in Figure 2(a), Trench Edge Protection in Figure 2(f), and Scaffolding Erection in Figure 2(h). In the critical operations above, safety domain experts maintain conservative scoring on Consequence Severity ( C ), recognizing secondary risks such as structural instability and cave-ins. On the other hand, for standardized or low-energy tasks like Ground Material Handling in Figure 2(e) and Conventional Hot Work in Figure 2(g), safety domain experts consistently assign low likelihood ( L ) and severity ( C ) scores, reflecting a highly calibrated risk perception anchored in technical standards and historical failure experiences.

Frontline operational workers ( N=40 ) display a dual cognitive bias characterized by “Operational Habituation” and “Immediate Hazard Sensitivity.” In routine high-risk environments such as Trench Edge Protection in Figure 2(f) and Scaffolding Erection in Figure 2(h), workers consistently underestimate Likelihood ( L ) and Exposure ( E ) compared to safety domain experts ( Δ μL,Worker <0 ). Long-term exposure to site hazards induces psychological desensitization (“risk numbness”), leading workers to perceive frequent hazardous exposures as acceptable baseline conditions. However, for tasks such as Temporary Electrical Work in Figure 2(b) and Mechanical Cutting in Figure 2(c), frontline operational workers assign elevated severity scores ( C ) in tasks involving immediate mechanical or electrical contact hazards, driven by direct first-hand exposure to personal injuries and acute operational mishaps.

Non-specialist personnel ( N=60 ) exhibit maximum cognitive divergence ( CD M s ), driven by systemic information asymmetry and a lack of engineering expertise. The analysis in this study indicates that non-specialist personnel suffer from severe “Cognitive Polarization,” resulting in overestimation of visible, high-profile hazards and underestimation of complex, hidden risks. Such as High-altitude Work in Figure 2(a) and Confined Space Inspection in Figure 2(d), non-specialist personnel overestimate risk scores ( D ), yielding peak values far exceeding those of safety domain experts ( Δ μ >0 ), which stems from dread-risk anxiety associated with height and asphyxiation. Conversely, in tasks such as Trench Edge Protection in Figure 2(f) and Scaffolding Erection in Figure 2(h), non-specialist personnel fail to recognize latent geotechnical and structural stability hazards, yielding severe risk underestimation, which underscores the critical necessity of introducing cohort-specific calibration coefficients ( k ) to reconcile subjective evaluation discrepancies in site safety management.

3.2. Multi-Stakeholder Cognitive Analysis of Risk Score

Building upon the foundational parameter comparisons, this study advances to a deeper cognitive evaluation of the aggregated risk score ( D ) within the Likelihood-Exposure-Consequence (LEC) framework. To systematically decode the compounding mechanisms of subjective bias across the three distinct stakeholder safety domain experts ( N=20 ), frontline operational workers ( N=40 ), and non-specialist personnel ( N=60 ), the raw evaluation metrics were subjected to a dynamic calibration matrix utilizing four scaling coefficients ( k=0.8,1.0,1.2,1.4 ). As shown in the statistical trajectories from Figures 3(a)-(h), which synthesize arithmetic means ( μ ) and standard deviations ( σ ) across eight representative construction cases, this analysis moves from descriptive data to cognitive-behavioral diagnostics. By reflecting shifting score hierarchies and inter-group dispersions across varied k -values [40]-[43], such as workers’ operational habituation and laypersons’ risk polarization, this study elucidates cohort-specific perceptual disparities, demonstrating the efficacy of targeted calibration in bridging multi-stakeholder consensus gaps.

(a)

(b)

(c)

(d)

(e)

(f)

(g)

(h)

Figure 3. Assignment analysis of the operational condition risk assessment. (a) High-altitude operations, (b) Temporary electrical works, (c) Scaffold erection and dismantling, (d) Trench excavation and earthworks, (e) Tower crane lifting and hoisting operations, (f) Confined space operations, (g) Hot works, (h) Heavy mobile machinery operations.

3.2.1. Cognitive Modeling & Sensitivity Decomposition

According to Man et al. [44] and Pinto et al. [45], this study derives the aggregated operational risk score D is derived via the multiplicative synthesis formulation D=L×E×C to eliminate random observational noise and subjective cognitive discrepancies across evaluator cohorts. The weighted mean risk score evaluated by the expert cohort is established as the professional consensus proxy ( D j * = D ¯ E,j ) for each operational case of the situation j∈{ 1,2,⋯,8 } . To quantify the parametric sensitivity and risk distortion among non-expert stakeholders (on-site frontline operational workers W and non-specialist personnel P ), a coefficient-scaling transformation function is introduced as below:

D ij ( k )=k⋅ D ¯ ij , k∈{ 0.8,1.0,1.2,1.4 } (11)

where D ij represents the raw weighted average risk score of stakeholder cohort i∈{ W,P } under situation j . The linear response gradient of the risk score with respect to the scaling coefficient k is given by:

d D ij ( k ) dk = D ¯ ij (12)

To avoid the epistemological misconception that Consequence Severity ( C ) dictates risk magnitude over Likelihood ( L ) or Exposure ( E ) solely due to its larger numerical bounds ( C∈[ 1,100 ] vs. L∈[ 0.1,10 ] , E∈[ 0.5,10 ] ) [46] [47], a logarithmic additive decomposition framework is formulated in this study. Taking the natural logarithm of the risk synthesis function yields:

lnD=lnL+lnE+lnC (13)

The logarithmic cognitive deviation ( Δln D ij ) of a non-expert cohort relative to the expert reference ( D j * ) is expressed as:

Δln D ij =ln D ¯ ij +ln D j * =δln L ij +δln E ij +δln C ij (14)

where δln X ij =ln X ¯ ij −ln X E,j * for X∈{ L,E,C } . Equation (14) proves that the proportional variation in the aggregated risk score D is an isotropic, scale-invariant sum of the relative logarithmic cognitive discrepancies of the individual indicators [48].

Furthermore, the Relative Cognitive Distortion Index ( RCD I ij ) and the optimal stakeholder calibration coefficient ( k i,j * ) required to harmonize non-expert risk ratings with expert references are defined as:

RCD I ij = D ¯ ij − D j * D j * (15)

k ij * = D j * D ¯ ij = 1 1+RCD I ij (16)

When RCD I ij >0 , the stakeholder group overestimates the operational risk, necessitating a reductive calibration factor ( k * <1.0 ); conversely, when RCD I ij <0 , the operational risk is underestimated, requiring an amplificative calibration factor ( k * >1.0 ).

Within the calculation above, this study formally defines the SDE weighted mean risk score as a heuristic reference baseline ( D j * = D ¯ E,j ) rather than asserting the expert cohort as an infallible or absolute physical standard. Based on the specific calculated approach above, the operational definition posits that while expert perception is not immune to epistemic uncertainty, it represents the most robust, normatively calibrated professional consensus available for cross-cohort risk harmonization.

3.2.2. High-Consequence Structural & Elevation Hazards

1) High-Altitude Operations (CASE-1, Figure 3(a))

For high-altitude operations, the safety domain experts were established at D 1 * =111.31 . As illustrated in Figure 3(a), non-specialist personnel demonstrated an acute risk overestimation trend, yielding a raw score of D ¯ P,1 =306.42 ( RCD I P,1 =+1.753 ). The response trajectory for non-specialist personnel exhibits the steepest response gradient ( d D P,1 / dk =306.42 ), rising rapidly from 245.14 ( k=0.8 ) to 428.99 ( k=1.4 ), and this stems from severe psychological dread and a lack of engineering context regarding fall-arrest protections. Frontline operational workers yielded a moderately elevated rating ( D ¯ W,1 =144.15 , RCD I W,1 =+0.295 ). To reconcile these evaluations with the safety domain experts D 1 * , the optimal calibration factors were computed as k W,1 * =0.772≈0.8 for frontline operational workers and k P,1 * =0.363<0.8 for non-specialist personnel.

2) Scaffolding Erection Operations (CASE-8, Figure 3(h))

Scaffolding erection represents a complex elevation hazard with a safety domain experts of D 8 * =248.52 . In stark contrast to CASE-1, both non-expert groups exhibited significant risk underestimation, as depicted in Figure 3(h). Frontline operational workers evaluated the raw risk at D ¯ W,8 =150.13 ( RCD I W,8 =−0.396 ), while non-specialist personnel recorded an even lower rating of D ¯ P,8 =82.46 ( RCD I P,8 =−0.668 ). Frontline scaffolders suffer from operational risk habituation, underestimating structural instability and dynamic load risks, whereas non-specialist personnel lack awareness of temporary structure failure mechanics. Because no intersection with the safety domain experts occurs within k∈[ 0.8,1.4 ] , both cohorts require strong amplificative calibration coefficients: k W,8 * =1.655>1.4 and k P,8 * =3.014≫1.4 .

3) Trench and Foundation Pit Edge Protection (CASE-6, Figure 3(f))

As shown in Figure 3(f), trench and foundation pit edge protection exhibited the most pronounced multi-stakeholder risk underestimation among all evaluated cases. While safety domain experts assigned a high baseline score of D 6 * =96.74 due to soil collapse and slope instability hazards, frontline operational workers ( D ¯ W,6 =32.94 , RCD I W,6 =−0.659 ) and non-specialist personnel ( D ¯ P,6 =33.55 , RCD I P,6 =−0.653 ) produced nearly identical, suppressed evaluations. The response curves for both non-expert cohorts remain positioned far below the expert reference across the entire range of k∈[ 0.8,1.4 ] . This convergence highlights that non-experts intuitively perceive trench edges as static ground terrain, failing to comprehend subsurface geomechanical failure modes. Due to this, both groups require an aggressive scaling correction factor of k W,6 * =2.937>1.4 and k P,6 * =2.883>1.4 .

3.2.3. Process & Environmental Hazards

1) Temporary Electrical Operations (CASE-2, Figure 3(b))

Temporary site power distribution shows an expert-reference baseline of D 2 * =33.53 . Figure 3(b) indicates that frontline operational workers assigned the highest raw risk score ( D ¯ W,2 =75.50 , RCD I W,2 =+1.252 ), demonstrating a response gradient of d D W,2 / dk =75.50 , which reflects workers’ direct operational encounters with electrical hazards, cable wear, and wet ground conditions. Non-specialist personnel evaluated the risk as moderately higher than safety domain experts ( D ¯ P,2 =47.03 , RCD I P,2 =+0.403 ). Reconciling these evaluations requires reductive calibration parameters as k W,2 * =0.444<0.8 for frontline operational workers and k P,2 * =0.713≈0.7 - 0.8 for non-specialist personnel.

2) Routine Inspection in Confined Spaces (CASE-4, Figure 3(d))

Atmospheric hazards in confined spaces resulted in a safety domain experts of D 4 * =21.22 . As displayed in Figure 3(d), frontline operational workers demonstrated high-degree cognitive alignment with safety domain experts, scoring a raw value of D ¯ W,4 =20.26 ( RCD I W,4 =−0.045 ), which intersects the safety domain experts at k W,4 * =1.047∈[ 1.0,1.2 ] . Conversely, non-specialist personnel exhibited cognitive inflation ( D ¯ P,4 =27.75 , RCD I P,4 =+0.308 ) due to claustrophobic anxiety and heightened perception of toxic gas hazards, requiring a reductive factor of k P,4 * =0.765<0.8 .

3) Conventional Hot Work Without Surrounding Flammables (CASE-7, Figure 3(g))

For conventional hot work, safety domain experts set the reference at D 7 * =60.13 . As Figure 3(g) shows, risk perceptions diverged significantly. Frontline welders and cutters underestimated the risk ( D ¯ W,7 =31.04 , RCD I W,7 =−0.484 ), as routine exposure breeds complacency regarding thermal radiation and stray sparks. In contrast, non-specialist personnel overestimated the risk ( D ¯ P,7 =96.98 , RCD I P,7 =+0.613 ) due to visual fear of open flames. Neither the non-expert curve intersects the safety domain experts within k∈[ 0.8,1.4 ] . Alignment requires an amplificative correction for workers ( k W,7 * =1.937>1.4 ) and a reductive correction for non-specialist personnel ( k P,7 * =0.620<0.8 ).

3.2.4. Low-Consequence Routine Operational Hazards

1) Mechanical Cutting Operations (CASE-3, Figure 3(c))

Mechanical cutting represents a low-to-moderate physical hazard with a safety domain experts of D 3 * =30.05 . As shown in Figure 3(c), both non-expert groups overestimated operational risks. Non-specialist personnel produced the highest evaluation ( D ¯ P,3 =59.66 , RCD I P,3 =+0.985 ), driven by visceral apprehension of high-speed blade contact and flying debris. Frontline operators yielded a moderately inflated rating ( D ¯ W,3 =43.06 , RCD I W,3 =+0.433 ). Consequently, reductive calibration parameters are required for both groups, as k W,3 * =0.698<0.8 and k P,3 * =0.504<0.8 .

2) Ground Material Handling Operations (CASE-5, Figure 3(e))

Ground material handling represents a high-frequency, low-severity routine activity ( D 5 * =21.95 ). Figure 3(e) demonstrates that frontline operational workers accurately calibrated the operational risk ( D ¯ W,5 =20.55 , RCD I W,5 =−0.064 ), yielding an ideal calibration coefficient near unity ( k W,5 * =1.068≈0.8 - 1.0 ). Conversely, non-specialist personnel dramatically inflated the risk ( D ¯ P,5 =54.30 , RCD I P,5 =+1.474 ) due to subjective overestimation of physical exertion and manual lifting risks. Aligning non-specialist personnel evaluation requires a reductive factor of k P,5 * =0.404<0.8 .

3.2.5. Operational Calibration Matrix ( k ∗ ) & Multi-Stakeholder Risk Alignment

To synthesize the empirical findings across all eight construction scenarios, Table 4 compiles the expert reference values ( D * ), raw non-expert ratings ( D ¯ ), Relative Cognitive Distortion Indices ( RCDI ), and optimal calibration coefficients ( k * ).

Table 4. Operational calibration matrix (k*) and multi-stakeholder risk alignment across 8 reference construction cases.

Situations & Operational Activity

D*

D ¯ W

RCDIW

kW*

D ¯ P

RCDIP

k P *

Primary Cognitive Driver

CASE-1 High-Altitude Operations

111.31

144.15

0.295

0.772

(≈0.8)

306.42

1.753

0.363

(<0.8)

Public Dread Elevation Phobia

CASE-2 Temporary Electrical Operations

33.530

75.500

1.252

0.444

(<0.8)

47.030

0.403

0.713

(≈0.7~0.8)

Worker Direct Hazard Exposure

CASE-3 Mechanical Cutting Operations

30.050

43.060

0.433

0.698

(<0.8)

59.660

0.985

0.504

(<0.8)

Debris Fear High-Speed Tool Fear

CASE-4 Confined Space Inspection

21.220

20.260

−0.045

1.047

(1.0~1.2)

27.750

0.308

0.765

(<0.8)

Worker-Expert Alignment

CASE-5 Ground Material Handling

21.950

20.550

−0.064

1.068

(0.8~1.0)

54.300

1.474

0.404

(<0.8)

Public Manual Lifting Inflation

CASE-6 Trench/Pit Edge Protection

96.740

32.940

−0.659

2.937

(>1.4)

33.550

−0.653

2.883

(>1.4)

Shared Geotechnical Blind Spot

CASE-7 Hot Work Without Flammables

60.130

31.040

−0.484

1.937

(>1.4)

96.980

0.613

0.620

(<0.8)

Worker Habituation Flame Fear

CASE-8 Scaffolding Erection

248.52

150.13

−0.396

1.655

(>1.4)

82.460

−0.668

3.014

(>>1.4)

Structural Collapse Ignorance

Note: D*: Expert Baseline; D ¯ W : On-Site Workers Raw; RCDIW: Worker Distortion; kW*: Worker Calibration; D ¯ P : Ordinary Public Raw; RCDIP: Public Distortion; k P * : Public Calibration.

The systematic analysis of Table 4 reveals three fundamental cognitive mechanisms governing subjective safety evaluation as below:

1) Universal Non-Expert Blind Spots (Severe Underestimation, k≫1.4 ):

In cases involving complex structural or geotechnical failure mechanisms (S6: Trench Protection, S8: Scaffolding Erection), both workers and non-specialist personnel severely underestimate risk ( RCDI≈−0.40~−0.66 ), which establishes an urgent imperative for site safety management to deploy dynamic amplification factors ( k * >1.4 ) rather than relying on uncalibrated survey averages.

2) Routine Operational Habituation ( k>1.4 ):

Frontline operational workers exhibit pronounced risk habituation in high-frequency hazardous tasks such as Hot Work (S7, RCD I W =−0.484 ), necessitating upward calibration ( k W * =1.937 ) to correct for workplace complacency.

3) Visceral Risk Inflation ( k<0.8 ):

Non-experts without a technical engineering background consistently over-evaluate highly visual or high-dread hazards (S1: High Altitude, S3: Cutting, S5: Material Handling), generating positive cognitive distortion ( RCD I P up to +1.753). These scores require aggressive scaling compression ( k * <0.8 ) to prevent false positives and misallocation of operational resources in risk management.

4. Summarization

The summarization of this study consolidates empirical findings from the multi-cohort LEC evaluation across eight representative construction cases (CASE-1 to CASE-8). By incorporating four sensitivity adjustment coefficients ( k∈{ 0.8,1.0,1.2,1.4 } ), the summarization synthesizes the parameter-specific response characteristics, occupational cognition gaps, and the multiplicative error propagation mechanics inherent in traditional LEC formulations, while all underlying granular statistical matrices are systematically cataloged in Appendix Tables A2-A5.

4.1. Accident Likelihood

The quantitative assessment of accident likelihood ( L ) across the eight baseline construction cases demonstrates a high degree of convergence among distinct evaluation cohorts for routine, localized operations, contrasted by pronounced divergence in dynamic, structural hazard environments (Appendix Table A2).

Under standard scaling conditions ( k=1.0 ), baseline likelihood mean scores ( μ L ) across all evaluators remained restricted within a low-amplitude range of 0.57 to 2.10.

  • Safety Domain Experts (SDE): Safety domain experts exhibited superior hazard discrimination sensitivity. The mean likelihood values reached peak magnitude in high-altitude operations (CASE-1: μ L =1.69 , σ L =2.55 ) and trench edge protection (CASE-6: μ L =2.10 , σ L =1.70 ), while yielding minimum values for mechanical cutting (CASE-3:   μ L =0.64 , σ L =0.59 ). The elevated standard deviations observed in expert evaluations for gravity-related hazards reflect a highly differentiated risk perspective grounded in dynamic site conditions and regulatory compliance standards.

  • Frontline Operational Workers (FOW): Operational frontline personnel displayed systematically lower mean likelihood ratings ( μ L ∈[ 0.57,1.62 ] ) and reduced variance relative to safety domain experts. This attenuation is primarily attributable to operational habituation and spatial familiarity bias, wherein continuous exposure to structural hazards induces an underestimation of potential accident initiation probabilities.

  • Non-Specialist Personnel (NSP): Non-expert evaluators demonstrated erratic scoring dispersion ( σ L reaching up to 3.25 under k=1.4 in CASE-3). Lacking contextual safety knowledge, their L -value assignments fluctuated widely, overestimating probabilities in visually striking operations (e.g., CASE-3 Mechanical Cutting: μ L =1.66 , σ L =2.32 at k=1.0 ) while underestimating latent dynamic risks.

As many previous studies have shown [49]-[52], parameter L serves as a relatively stable baseline metric for low-complexity task evaluations; however, subjective probability assessment in non-linear dynamic construction environments necessitates expert-calibrated reference coefficients to eliminate cognitive optimism bias.

4.2. Risk Exposure Frequency

The analysis of risk exposure frequency ( E ) quantifies the temporal and spatial involvement of personnel within hazardous operational zones (Appendix Table A3). Across all cohorts, E -metric scoring spanned a moderate numerical band ( μ E ∈[ 2.19,7.21 ] across all k factors).

  • Occupational Patterning: Scaffolding erection (CASE-8) registered the highest continuous exposure indices across all three cohorts ( μ E =5.15 for safety domain experts; μ E =4.86 for frontline operational workers; μ E =4.12 for non-specialist personnel at k=1.0 ). This reflects a shared consensus regarding the sustained, multi-phase spatial vulnerability inherent in structural scaffold assembly. Conversely, confined space inspection (CASE-4) yielded the lowest exposure averages ( μ E =3.70 for safety domain experts; μ E =2.74 for frontline operational workers at k=1.0 ), aligning with its characterization as an intermittent, highly controlled operational task.

  • Inter-Cohort Dispersion: Safety domain experts demonstrated slightly higher exposure estimates ( μ E ) and moderate standard deviations ( σ L ∈[ 2.67,3.27 ] at k=1.0 ), evaluating exposure from a strict normative framework that considers environmental variability and secondary containment duties. Frontline operational workers displayed remarkably stable intra-group variance ( σ E ), reflecting direct empirical awareness of physical shift durations and site throughput schedules. Non-specialist personnel, while tracking general operational trends, exhibited elevated relative variance ( σ E / μ E ), underscoring an inability to differentiate between active task execution and passive environmental exposure.

In summary, parameter E exhibits stronger cross-cohort evaluation consistency than likelihood ( L ) or consequence severity ( C ), as temporal exposure is more readily anchored to observable physical durations on-site.

4.3. Accident Consequence Severity

Accident consequence severity ( C ) was identified as the predominant source of subjective dispersion and variance within the LEC evaluation system (Appendix Table A4). Mean consequence scores exhibited extreme scalar stratification ( μ C ∈[ 3.68,57.13 ] across scaling factors), driving the overall magnitude of the composite risk index.

  • High-Severity Domain Characteristics: For high-fatality-risk operations such as high-altitude work (CASE-1), trench edge protection (CASE-6), and scaffolding erection (CASE-8), all cohorts yielded elevated C -scores. However, the internal logic of scoring diverged significantly between groups, as shown below:

1) Safety Domain Experts (SDE): Assigned conservative severity values (e.g., CASE-1: μ C =17.55 , σ C =23.29 at k=1.0 ), reflecting comprehensive risk modeling that accounts for regulatory penalties, structural damage, and multi-casualty disaster thresholds.

2) Frontline Operational Workers (FOW): Exhibited elevated consequence ratings for immediate, explicit physical injuries (e.g., CASE-1: μ C =23.93 at k=1.0 ), driven by direct peer exposure to major injury events. However, they significantly underestimated consequences for insidious hazards, such as trench edge collapses (CASE-6: μ C =6.38 vs. Expert μ C =13.95 at k=1.0 ).

3) Non-Specialist Personnel (NSP): Displayed non-Gaussian scoring distributions. Notably, in temporary electrical operations (CASE-2), novice evaluations showed severe statistical dispersion ( σ C =18.75 at k=1.0 and σ C =68.56 at k=1.2 ), indicating severe cognitive polarization due to a lack of technical comprehension regarding electrical shock mechanisms and systemic arc-flash hazards.

  • Low-Severity Domain Characteristics: Ground material handling (CASE-5) consistently anchored the lower bound of consequence metrics across all groups ( μ C ∈[ 3.68,5.83 ] at k=1.0 ), confirming strong broad consensus regarding lower-tier physical trauma hazards (e.g., minor contusions, localized strains).

The empirical data demonstrate that C -value subjective bias constitutes the primary driver of risk misclassification in traditional LEC applications, requiring targeted mathematical adjustment based on evaluator background.

The empirical data demonstrate that C -value subjective bias constitutes the primary driver of risk misclassification in traditional LEC applications, requiring targeted mathematical adjustment based on evaluator background. Also, to verify that the SDE represents true objective risk rather than mere subjective groupthink, the expert evaluations were corroborated against macro-level historical accident databases. Based on the analytical results, SDEs anchored peak Consequence Severity ( C ) and total risk ( D ) values to High-altitude Operations (CASE-1) and Scaffolding Erection (CASE-8), which impeccably mirror empirical industry fatality statistics, where falls from height and structural collapses dominate historical construction site mortalities, accounting for over 60% of total annual fatalities [53]-[56]. Such alignment with empirical historical reality confirms that the SDE cohort serves as a mathematically rigorous and historically grounded reference baseline for subsequent model calibration.

4.4. Compound Risk Score Evaluation

The compound risk score, defined by the non-linear multiplicative formulation D=L×E×C , synthesizes individual parameter uncertainties into an integrated hazard index (Appendix Table A5). The quantitative findings highlight a critical mathematical vulnerability in the traditional LEC method due to multiplicative error propagation.

Under first-order error approximation and relative variance expansion, the compound perturbation follows:

δD D ≈ δL L + δE E + δC C (17)

Var( D )≈ ( μ E ⋅ μ C ) 2 ⋅Var( L )+ ( μ L ⋅ μ C ) 2 ⋅Var( E )+ ( μ L ⋅ μ E ) 2 ⋅Var( C ) (18)

As demonstrated by the compounded metric dynamics across adjustment factors k∈{ 0.8,1.0,1.2,1.4 } :

  • Compounded Variance Amplification: While individual parameter variations ( L , E , C ) remained within modest bounds, the resulting composite risk scores ( D ) expanded exponentially. For instance, in safety domain experts’ evaluations of trench edge protection (CASE-6), the mean risk score inflated from D=137.66 ( σ D =533.38 ) at k=0.8 to D=1291.08 ( σ D =5002.54 ) at k=1.4 , which confirms that minor subjective variations in primary scoring inputs undergo severe non-linear amplification in high-hazard situations.

  • Cognitive Asymmetry & Risk Misclassification:

1) Over-Optimism in High-Risk Situations: Field workers (GW) and non-specialist personnel (GP) exhibited severe risk underestimation in critical structural tasks. In CASE-6 (trench edge protection), worker-assigned risk values D=32.94 at k=1.0 ) were over an order of magnitude lower than expert references ( D=336.08 ). A similar habituation deficit was observed in scaffolding erection (CASE-8: Worker D=150.13 vs. Expert D=248.52 at k=1.0 ). The findings in this study emphasize that a habituation-driven deficit creates catastrophic management blind spots if uncorrected.

2) Hyper-Inflation in Low-to-Moderate Hazards: Non-specialist personnel significantly overestimated hazards in visible operational tasks, such as mechanical cutting (CASE-3: Worker D=145.66 vs. Expert D=30.05 at k=1.0 ), leading to potential resource misallocation in routine site safety enforcement.

  • Domain-Specific Calibration Requirements: The linear scaling factor k effectively shifts non-expert evaluation distributions toward the reference expert envelope ( D Expert ). However, because cognitive bias varies non-linearly across distinct hazard domains, a universal adjustment coefficient is mathematically invalid. Field worker inputs for scaffold and trench hazards require upward scaling ( k>1.4 ) to compensate for risk habituation, whereas novice inputs for mechanical cutting require downward suppression ( k<0.8 ).

In conclusion, implementing multi-subject correction coefficients within the LEC framework mitigates individual subjective bias and provides a quantitatively grounded foundation for classifying construction safety risks. However, using a simple linear scalar multiplier ( k ) to adjust the aggregated hazard score ( D ) has an inherent mathematical limitation. Given the non-linear error propagation innate to the D=L×E×C structure, applying a terminal linear adjustment compresses the macroscopic disparity without rectifying the root-cause variations residing unevenly within the individual parameters L , E , and C . The deployment of a unified scalar k in this study serves as a pragmatic operational compromise to ensure computational feasibility and ease of implementation for frontline site management. While future iterations of this framework are expected to transition from a scalar multiplier to parameter-decoupled calibration vectors ( k L , k E , k C ) to achieve authentic source-level correction, the current unified calibration proxy effectively counteracts severe multiplicative error expansion, establishing a calculational first step toward dynamic cross-cohort risk harmonization.

5. Conclusions

To mitigate the critical limitations of subjectivity and low objectivity inherent in the traditional LEC (Likelihood, Exposure, Consequence) safety evaluation method, this study established a multi-cohort empirical risk assessment framework across eight high-frequency construction cases, drawing on 120 validated assessments from safety domain experts, field workers, and laypersons. The comparative analysis of individual parameters ( L , E , C ) reveals that the evaluations of accident likelihood ( L ) and exposure frequency ( E ) demonstrate high baseline cognitive consensus across different evaluator cohorts. On the other hand, consequence severity ( C ) exhibits substantial dispersion and serves as the primary driver of subjective rating variance. Furthermore, the multiplicative aggregation structure of D=L×E×C nonlinearly amplifies these underlying parameter discrepancies, particularly in high-hazard operational environments, which confirms that the subjective error in conventional LEC evaluations stems principally from the misperception of consequence magnitude rather than misjudgments of operational frequency or occurrence probability.

The analysis of weighted D -value trajectories reveals distinct risk perception patterns among evaluator cohorts, demonstrating that a universal conversion factor is methodologically invalid. Safety domain experts exhibit superior risk sensitivity and structured differentiation, establishing a robust professional consensus proxy ( D expert ). Field workers demonstrate consistent evaluation stability for L and E due to practical site familiarity, but they are susceptible to cognitive habituation and optimism bias, leading to significant underestimation of risks in high-hazard situations such as scaffold erection and trench edge protection. Constrained by a lack of operational domain knowledge, laypersons display extreme risk polarization characterized by marked perceptual inflation or severe underestimation. To rectify these systemic biases, cohort- and situation-tailored calibration coefficients ( k= D expert / D evaluated ) were formalized. Empirical results indicate that overestimated hazards require scaling factors k<1.0 (e.g., k<0.8 ) to compress inflated subjective scores, whereas underestimated perilous operations necessitate scaling factors k>1.0 (e.g., k>1.4 ) to restore risk ratings to expert reference levels.

Synthesizing the findings, this study demonstrates that integrating multi-cohort consensus modeling with dynamic calibration matrices effectively rectifies the cognitive distortion of traditional single-assessor LEC regimes, transforming qualitative field experience into a standardized, objective risk assessment protocol for safety managers. Nevertheless, a notable methodological limitation lies in deriving the calibration coefficients directly from the primary survey dataset without subsequent out-of-sample validation, introducing potential overfitting risks to regional or demographic specifics. Consequently, the presented scalar multipliers ( k ) should be interpreted as a preliminary calibration matrix. Future research must prioritize independent cross-validation across distinct construction sites to verify universal generalizability, while embedding these dynamic calibration algorithms into digital twin platforms and computer-vision monitoring systems to enable real-time, automated safety governance.

Acknowledgements

This work benefited significantly from the comprehensive resources provided by the Ankang Science & Technology Innovation Center (Qinchuangyuan Platform), which facilitated the execution and provided technical assistance for this scientific investigation.

Also, the authors gratefully acknowledge Yuxin Meng (Student ID: 2024100643, School of Economics and Management, Ankang University) for her bachelor’s thesis concerning the theory of LEC, which provided vital conceptual inspiration for this study.

Funding

This work was supported by the Project of the Shaanxi Provincial Educational Science Planning Program, “Research on Dynamic Modeling of Undergraduate Students’ Learning Behaviors and Academic Performance Prediction Based on Artificial Intelligence”, under Grant AK-25-30, and the 2025 science and technology project of Ankang Municipal Science and Technology Bureau, “AI-based Plush Toy Image Generation and Design Using Deep Learning Neural Networks”, under Grant AK2025-GY-24, which provided essential financial funding for the computational resources and survey administration utilized in this work.

Author Contributions

Conceptualization: Mo Shi, Xinyue Cu, Nan Feng. Data curation: Mo Shi. Formal analysis: Mo Shi. Funding Acquisition: Mo Shi. Investigation: Xinyue Cu, Nan Feng. Methodology: Mo Shi, Xinyue Cu. Project administration: Mo Shi. Resources: Mo Shi, Xinyue Cu, Nan Feng. Software: Mo Shi, Xinyue Cu. Supervision: Mo Shi, Sanggoo Kang, Xiaoxian Huang. Validation: Mo Shi, Xinyue Cu. Visualization: Mo Shi. Writing-original draft: Mo Shi. Writing-review & editing: Mo Shi.

Appendices

Table A1. Typical eight high-frequency on-site operational cases.

Construction site

Details

Construction site

Details

Location: Jiangxi Province

Project: Tongcheng-Tonggu Expressway

Time: 2025

Location: Henan Province

Project: Puyang Electricity Net

Time: 2023

(a) High-altitude operations

(b) Temporary electrical works

Location: Hainan Province

Project: Hainan satellitesuper-factory

Time: 2025

Location: Fujian Province

Project: Fuzhou Industrial Bank

Time: 2025

(c) Scaffold erection and dismantling

(d) Trench excavation and earthworks

Location: Hainan Province

Project: Baisha Affordable House

Time: 2025

Location: Anhui Province

Project: Dongfeng Road Engineering

Time: 2017

(e) Tower crane lifting and hoisting operations

(f) Confined space operations

Location: Beijing City

Project: Metro L17 (Xibahe Station)

Time: 2023

Location: Hebei Province

Project: Sinochem Holdings Headquarter

Time: 2023

(g) Hot works

(h) Heavy mobile machinery operations

Table A2. Comparison analysis of accident likelihood.

AC

CASE-1

CASE-2

CASE-3

CASE-4

CASE-5

CASE-6

CASE-7

CASE-8

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

SDE

0.8

1.35

2.04

0.88

1.33

0.51

0.47

0.55

0.66

0.73

1.68

1.00

1.36

0.69

1.69

1.03

1.87

1

1.69

2.55

1.11

1.66

0.64

0.59

0.69

0.83

0.91

2.10

1.26

1.70

0.87

2.11

1.29

2.34

1.2

2.03

3.07

1.33

2.00

0.77

0.71

4.00

1.00

1.09

2.52

1.51

2.04

1.04

2.53

1.55

2.81

1.4

2.37

3.58

1.55

2.33

0.90

0.83

0.97

1.16

1.27

2.95

1.76

2.38

1.21

2.96

1.81

3.27

FOW

0.8

0.70

1.06

0.72

0.91

0.79

1.09

0.44

0.60

0.46

0.60

0.87

1.30

0.59

0.84

0.94

1.11

1

0.87

1.33

0.91

1.14

0.98

1.36

0.55

0.75

0.57

0.75

1.09

1.62

0.74

1.05

1.18

1.39

1.2

1.04

1.59

1.09

1.36

1.18

1.63

0.66

0.90

0.68

0.89

1.31

1.95

0.88

1.26

1.41

1.67

1.4

1.22

1.86

1.27

1.59

1.38

1.90

0.77

1.05

0.80

1.04

1.53

2.27

1.03

1.47

1.64

1.94

NSP

0.8

1.00

1.59

0.68

0.84

1.33

1.86

0.86

1.45

0.86

1.21

0.69

0.94

1.06

1.63

1.16

1.40

1

1.25

1.99

0.85

1.05

1.66

2.32

1.08

1.81

1.07

1.51

0.86

1.18

1.32

2.04

1.45

1.75

1.2

1.50

2.38

1.01

1.26

1.99

2.79

1.29

2.18

1.29

1.81

1.03

1.41

1.59

2.45

1.74

2.09

1.4

1.75

2.78

1.18

1.47

2.32

3.25

1.51

2.54

1.50

2.11

1.21

1.65

1.85

2.86

2.03

2.44

Note: AC: Adjustment Coefficient; Avg.: Average value; Dev.: Deviation value; SDE = Safety Domain Experts (n = 20); FOW = Frontline Operational Workers (n = 40); NSP = Non-Specialist Personnel (n = 60); CASE-1: High-altitude operations; CASE-2: Temporary electrical works; CASE-3: Scaffold erection and dismantling; CASE-4: Trench excavation and earthworks; CASE-5: Tower crane lifting and hoisting operations; CASE-6: Confined space operations; CASE-7: Hot works; CASE-8: Heavy mobile machinery operations.

Table A3. Comparison analysis of risk exposure frequency.

AC

CASE-1

CASE-2

CASE-3

CASE-4

CASE-5

CASE-6

CASE-7

CASE-8

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

SDE

0.8

3.66

2.50

3.18

2.14

3.70

2.28

2.96

2.29

3.04

2.26

3.28

2.61

3.02

2.26

4.12

2.39

1

4.58

3.12

3.98

2.67

4.63

2.85

3.70

2.86

3.80

2.83

4.10

3.27

3.78

2.82

5.15

2.98

1.2

5.49

3.74

4.77

3.21

5.55

3.41

4.44

3.43

4.56

3.39

4.92

3.92

4.53

3.39

6.18

3.58

1.4

6.41

4.37

5.57

3.74

6.48

3.98

5.18

4.01

5.32

3.96

5.74

4.57

5.29

3.95

7.21

4.18

FOW

0.8

3.20

1.97

2.95

2.10

3.56

2.20

2.19

1.73

3.02

2.25

3.03

2.24

3.31

2.25

3.89

2.28

1

4.00

2.46

3.69

2.62

4.45

2.74

2.74

2.16

3.78

2.82

3.79

2.80

4.14

2.81

4.86

2.85

1.2

4.80

2.96

4.43

3.15

5.34

3.29

3.29

2.59

4.53

3.38

4.55

3.36

4.97

3.37

5.84

3.42

1.4

5.60

3.45

5.16

3.67

6.23

3.84

3.83

3.02

5.29

3.94

5.30

3.92

5.79

3.93

6.81

3.99

NSP

0.8

2.67

2.27

2.53

1.95

3.27

2.32

2.67

2.05

3.23

2.11

2.91

2.03

3.25

2.14

3.29

2.15

1

3.33

2.84

3.16

2.44

4.09

2.90

3.34

2.57

4.03

2.64

3.63

2.54

4.07

2.68

4.12

2.69

1.2

4.00

3.40

3.79

2.92

4.91

3.48

4.01

3.08

4.84

3.17

4.36

3.05

4.88

3.21

4.94

3.23

1.4

4.67

3.97

4.42

3.41

5.73

4.06

4.68

3.60

5.65

3.70

5.09

3.56

5.69

3.75

5.76

3.76

Note: AC: Adjustment Coefficient; Avg.: Average value; Dev.: Deviation value; SDE = Safety Domain Experts (n = 20); FOW = Frontline Operational Workers (n = 40); NSP = Non-Specialist Personnel (n = 60); CASE-1: High-altitude operations; CASE-2: Temporary electrical works; CASE-3: Scaffold erection and dismantling; CASE-4: Trench excavation and earthworks; CASE-5: Tower crane lifting and hoisting operations; CASE-6: Confined space operations; CASE-7: Hot works; CASE-8: Heavy mobile machinery operations.

Table A4. Comparison analysis of accident consequence severity.

AC

CASE-1

CASE-2

CASE-3

CASE-4

CASE-5

CASE-6

CASE-7

CASE-8

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

SDE

0.8

14.04

18.63

7.72

6.33

5.84

3.44

10.68

18.15

3.68

2.51

11.16

17.94

9.44

17.44

11.88

11.79

1

17.55

23.29

9.65

7.91

7.3

4.3

13.35

22.69

4.6

3.14

13.95

22.43

11.8

21.8

14.85

14.73

1.2

21.06

27.95

11.58

9.5

8.76

5.16

16.02

27.22

5.52

3.76

16.74

26.91

14.16

26.16

17.82

17.68

1.4

24.57

32.6

13.51

11.08

10.22

6.02

18.69

31.76

6.44

4.39

19.53

31.4

16.52

30.52

20.79

20.62

FOW

0.8

19.14

23.05

10.66

13.84

6.5

4.69

6.92

12.66

4.54

4.77

5.1

4.95

6.74

12.08

14.18

18.18

1

23.93

28.81

13.33

17.3

8.13

5.86

8.65

15.82

5.68

5.96

6.38

6.19

8.43

15.1

17.73

22.72

1.2

28.71

34.57

15.99

20.75

9.75

7.03

10.38

18.99

6.81

7.16

7.65

7.43

10.11

18.12

21.27

27.27

1.4

33.5

40.33

18.66

24.21

11.38

8.21

12.11

22.15

7.95

8.35

8.93

8.67

11.8

21.14

24.82

31.81

NSP

0.8

16.79

24.39

15

45.7

6.12

4.6

6.49

8.05

4.67

5.5

6.17

8.09

7.93

11.84

8.77

9.47

1

20.98

30.49

18.75

57.13

7.65

5.76

8.12

10.05

5.83

6.87

7.72

10.11

9.92

14.8

10.97

11.84

1.2

25.18

36.59

22.5

68.56

9.18

6.91

9.74

12.06

7

8.24

9.26

12.13

11.9

17.76

13.16

14.21

1.4

29.38

42.69

26.25

79.98

10.71

8.06

11.36

14.07

8.17

9.62

10.8

14.15

13.88

20.72

15.35

16.58

Note: AC: Adjustment Coefficient; Avg.: Average value; Dev.: Deviation value; SDE = Safety Domain Experts (n = 20); FOW = Frontline Operational Workers (n = 40); NSP = Non-Specialist Personnel (n = 60); CASE-1: High-altitude operations; CASE-2: Temporary electrical works; CASE-3: Scaffold erection and dismantling; CASE-4: Trench excavation and earthworks; CASE-5: Tower crane lifting and hoisting operations; CASE-6: Confined space operations; CASE-7: Hot works; CASE-8: Heavy mobile machinery operations.

Table A5. Comparison analysis of compound risk score evaluation.

AC

CASE-1

CASE-2

CASE-3

CASE-4

CASE-5

CASE-6

CASE-7

CASE-8

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

Avg.

Dev.

SDE

0.8

45.6

64.9

13.7

23.4

9.0

12.3

8.7

13.2

12.1

39.6

137.7

533.4

24.6

88.6

101.8

354.1

1

111.3

158.5

33.5

57.1

22.0

30.1

21.2

32.3

29.6

96.7

336.1

1302.2

60.1

216.3

248.5

864.4

1.2

230.8

328.6

69.5

118.4

45.5

62.3

44.0

67.0

61.5

200.6

696.9

2700.3

124.7

448.4

515.3

1792.4

1.4

427.6

608.7

128.8

219.3

84.3

115.5

81.5

124.1

113.8

371.7

1291.1

5002.5

231.0

830.8

954.7

3320.6

FOW

0.8

59.0

195.2

30.9

85.1

17.6

33.0

8.3

23.4

12.5

46.1

13.5

20.8

12.7

25.1

61.5

140.0

1

144.2

476.5

75.5

207.7

43.1

80.5

20.3

57.2

30.6

112.6

32.9

50.8

31.0

61.2

150.1

341.9

1.2

289.9

988.0

156.6

430.8

89.3

166.9

42.0

118.6

63.3

233.5

68.3

105.3

64.4

126.8

311.3

708.9

1.4

553.8

1830.4

290.0

798.0

165.4

309.3

77.8

219.8

117.8

432.6

126.5

195.0

119.3

234.9

576.7

1313.3

NSP

0.8

125.5

604.6

19.3

70.6

27.8

59.7

17.2

54.3

17.5

75.7

13.7

39.7

37.5

130.5

33.8

69.5

1

306.4

1476.2

47.0

172.3

67.8

145.7

42.1

132.6

42.8

184.8

33.6

97.0

91.5

318.6

82.5

169.8

1.2

635.4

3061.0

97.5

357.3

140.5

302.0

87.2

274.9

88.7

383.3

69.6

201.1

189.7

660.7

171.0

352.1

1.4

1177.2

5670.9

180.7

661.9

260.3

559.6

161.6

509.3

164.3

710.1

128.9

372.6

351.4

1224.0

316.8

652.3

Note: AC: Adjustment Coefficient; Avg.: Average value; Dev.: Deviation value; SDE = Safety Domain Experts (n = 20); FOW = Frontline Operational Workers (n = 40); NSP = Non-Specialist Personnel (n = 60); CASE-1: High-altitude operations; CASE-2: Temporary electrical works; CASE-3: Scaffold erection and dismantling; CASE-4: Trench excavation and earthworks; CASE-5: Tower crane lifting and hoisting operations; CASE-6: Confined space operations; CASE-7: Hot works; CASE-8: Heavy mobile machinery operations.

Conflicts of Interest

The authors declare no conflicts of interest regarding the publication of this paper.

References

[1] Konar, T. (2025) Mega-Tall Buildings: Current Trends, Challenges and Future Prospects. Discover Civil Engineering, 2, Article No. 138.[CrossRef]
[2] Zhang, M., Shen, Q., Zhao, Z., Wang, S. and Huang, G.Q. (2024) Risk-Averse Behavior and Incentive Policies: A New Perspective on Spatial-Temporal Traceability Supervision in Construction Logistics Supply Chains. Computers & Industrial Engineering, 192, Article ID: 110256.[CrossRef]
[3] Tetik, M., Brusselaers, N. and Fredriksson, A. (2025) Conceptual Model for Aligning Construction Logistics Capacity through Simulation. Automation in Construction, 175, Article ID: 106190.[CrossRef]
[4] Li, H.Q., Fan, Y.Q. and Yu, M.J. (2018) Deep Shanghai Project—A Strategy of Infrastructure Integration for Megacities. Tunnelling and Underground Space Technology, 81, 547-567.[CrossRef]
[5] Mawad, S. and Bakry, I. (2023) Enhanced Method to Plan the Operations of Vertical Supply Systems of High-Rise Projects. International Journal of Construction Management, 23, 629-638.[CrossRef]
[6] Jaafar, K., Elbarkouky, R. and Kennedy, J. (2020) Construction Site Layout Optimization Model Considering Cost and Safety in a Dynamic Environment. Asian Journal of Civil Engineering, 22, 297-312.[CrossRef]
[7] Rostamzadeh, S., Abouhossein, A., Vosoughi, S., Ebrahimi, H., Ebrahimian, M. and Dalvand, S. (2026) Preventive and Control Measures for Reducing Fall-from-Height Fatalities in the Construction Industry: A 30-Year Empirical Evaluation. Results in Engineering, 30, Article ID: 110722.[CrossRef]
[8] Kpakpo, J.N.A., Martey, A.K., Antwi, N.K.A., Maduka, C.C. and Mahoney, B. (2026) Electrocution in the Construction Industry: A Systematic Review. Discover Public Health, 23, Article No. 8.[CrossRef]
[9] Allison, R.W., Hon, C.K.H. and Xia, B. (2019) Construction Accidents in Australia: Evaluating the True Costs. Safety Science, 120, 886-896.[CrossRef]
[10] Hinsberg, K., Nadesan, M., Parrish, K. and Lamanna, A. (2025) Organizational Impacts of Construction Worksite Fatalities. Systems, 13, Article 223.[CrossRef]
[11] Bourahla, A., Fernandes, G. and Ferreira, L.M.D.F. (2024) Managing Occupational Health and Safety Risks in Construction Projects to Achieve Social Sustainability—A Review of Literature. Procedia Computer Science, 239, 1053-1061.[CrossRef]
[12] Reyes, J.P., San-José, J.T., Cuadrado, J. and Sancibrian, R. (2014) Health & Safety Criteria for Determining the Sustainable Value of Construction Projects. Safety Science, 62, 221-232.[CrossRef]
[13] Lu, Y., Gong, P., Tang, Y., Sun, S. and Li, Q. (2021) Bim-Integrated Construction Safety Risk Assessment at the Design Stage of Building Projects. Automation in Construction, 124, Article ID: 103553.[CrossRef]
[14] Toptanci, Ş., Erginel, N. and Acar, I. (2025) A Fine-Kinney-Based New Approach for Occupational Health and Safety Risk Assessment Using Interval-Valued Neutrosophic MCDM and HOQ Model Integration. Soft Computing, 29, 4583-4612.[CrossRef]
[15] Huang, B., Liu, H., Liu, D. and Zhou, S. (2025) Risk Evaluation of Construction Safety Hazard Based on Multi-Source Evidence Fusion and LEC Method. Water Resources and Hydropower Engineering, 56, 23-26. (In Chinese)[CrossRef]
[16] Zhao, Z., Li, H., Xia, R., Tong, J., Wu, S., Pan, X., et al. (2026) The Influence of Personality Traits on Hazard Recognition in Construction Workers. Buildings, 16, Article 2495.[CrossRef]
[17] Zhou, H., Chen, Y. and Tian, R. (2021) Land-Use Conflict Identification from the Perspective of Construction Space Expansion: An Evaluation Method Based on ‘Likelihood-Exposure-Consequence’. ISPRS International Journal of Geo-Information, 10, Article 433.[CrossRef]
[18] Zhang, Y., Tang, Y., Zhang, S., Ma, X. and Liu, C. (2026) Identifying Unsafe Behavior-Related Risk States in Construction: A Dynamic Monitoring and Assessment Framework. Safety Science, 205, Article ID: 107448.[CrossRef]
[19] Xu, N., Liu, Q., Ma, L., Deng, Y., Chang, H., Ni, G., et al. (2020) A Hybrid Approach for Dynamic Simulation of Safety Risks in Mega Construction Projects. Advances in Civil Engineering, 2020, Article ID: 9603401.[CrossRef]
[20] Tunç, M. and Solmaz, R. (2026) A Hybrid Fine-Kinney and Entropy-Weighted TOPSIS Approach for Risk Prioritization in Chemistry Laboratories. ACS Chemical Health & Safety, 33, 503-515.[CrossRef]
[21] Zhao, J., Wang, Y., Li, H., Fan, J., Cao, Y., Li, H., et al. (2025) Analysis of Construction Safety Risk Management for Cold Region Concrete Gravity Dams Based on Fuzzy VIKOR-LEC. Buildings, 15, Article 1981.[CrossRef]
[22] Chionis, D. and Karanikas, N. (2018) Differences in Risk Perception Factors and Behaviours amongst and within Professionals and Trainees in the Aviation Engineering Domain. Aerospace, 5, Article 62.[CrossRef]
[23] Baybutt, P. (2018) The Validity of Engineering Judgment and Expert Opinion in Hazard and Risk Analysis: The Influence of Cognitive Biases. Process Safety Progress, 37, 205-210.[CrossRef]
[24] Anthony (Tony)Cox, L. (2008) What’s Wrong with Risk Matrices? Risk Analysis, 28, 497-512.[CrossRef] [PubMed]
[25] Hong, Y., Pasman, H.J., Quddus, N. and Mannan, M.S. (2020) Supporting Risk Management Decision Making by Converting Linguistic Graded Qualitative Risk Matrices through Interval Type-2 Fuzzy Sets. Process Safety and Environmental Protection, 134, 308-322.[CrossRef]
[26] Fu, T., Li, X., Xu, W., Wang, J., Zhang, L., Ye, L., et al. (2024) Risk Analysis of Bridge Maintenance Accidents: A Two-Stage LEC Method and Bayesian Network Approach. International Journal of Transportation Science and Technology, 15, 51-64.[CrossRef]
[27] Yan, R., Zeng, L., Li, S., Wan, Y. and Liu, Y. (2025) Study of the Risk Assessment of Nursing Occupational Exposure to Major Public Health Emergencies Based on the Likelihood Exposure Consequence Method. Journal of Occupational Health, 67, uiaf022.[CrossRef] [PubMed]
[28] Zhou, J., Tang, D., Liu, X. and Gong, S. (2009) A LEC-and-AHP Based Hazard Assessment Method in Hydroelectric Project Construction. In: Wang, H., Shen, Y., Huang, T. and Zeng, Z., Eds., The Sixth International Symposium on Neural Networks (ISNN 2009), Springer, 81-90.[CrossRef]
[29] Yu, H., Yao, L., Qin, Z., Liu, Z., Yang, L., Zhu, S., et al. (2022) Safety Evaluation of Power Transmission, Transformation and Distribution Equipments by Introducing Risk Control Factors and Specific Environmental Assignments. 2022 4th International Conference on Electrical Engineering and Control Technologies (CEECT), Shanghai, 16-18 December 2022, 437-443.[CrossRef]
[30] Seker, S. (2022) A Novel Risk Assessment Approach Using a Hybrid Method Based on Fine-Kinney and Extended MCDM Methods under Interval-Valued Intuitionistic Fuzzy Environment. International Journal of Information Technology & Decision Making, 21, 1591-1616.[CrossRef]
[31] Gul, M. (2018) A Review of Occupational Health and Safety Risk Assessment Approaches Based on Multi-Criteria Decision-Making Methods and Their Fuzzy Versions. Human and Ecological Risk Assessment: An International Journal, 24, 1723-1760.[CrossRef]
[32] Song, Y. and Zhang, S. (2022) The Differences in Risk Perception between Practitioners in the Non-Coal-Mining Industry: Miners, Managers and Experts. Toxics, 10, Article 623.[CrossRef] [PubMed]
[33] Brunel, M., Launay, C., Henry, M., Cascino, N., Py, J. and Le Floch, V. (2023) Spontaneous Comparison of Nanotechnology and Controversial Objects among Laypersons, Scientists and Environmentalists. NanoEthics, 17, Article No. 14.[CrossRef]
[34] Al-Bayati, A.J. and Chellappa, V. (2025) Identifying Desirable Safety Actions of Upper Management to Foster Higher Levels of Construction Safety Culture. Journal of Construction Engineering and Management, 151, Article ID: 04025077.[CrossRef]
[35] Kokangül, A., Polat, U. and Dağsuyu, C. (2017) A New Approximation for Risk Assessment Using the AHP and Fine Kinney Methodologies. Safety Science, 91, 24-32.[CrossRef]
[36] Bedeian, A.G. and Mossholder, K.W. (2000) On the Use of the Coefficient of Variation as a Measure of Diversity. Organizational Research Methods, 3, 285-297.[CrossRef]
[37] Xu, Z. (2005) Deviation Measures of Linguistic Preference Relations in Group Decision Making. Omega, 33, 249-254.[CrossRef]
[38] Zhao, D., McCoy, A.P., Kleiner, B.M. and Smith-Jackson, T.L. (2015) Control Measures of Electrical Hazards: An Analysis of Construction Industry. Safety Science, 77, 143-151.[CrossRef]
[39] Sjöberg, L. (1998) Risk Perception: Experts and the Public. European Psychologist, 3, 1-12.
[40] Slovic, P. and Peters, E. (2006) Risk Perception and Affect. Current Directions in Psychological Science, 15, 322-325.[CrossRef]
[41] Palmon, D., Peytcheva, M. and Yezegel, A. (2011) The Accounting Standards Setting Process in the U.S.: Examination of the SEC-FASB Relationship. Group Decision and Negotiation, 20, 165-183.[CrossRef]
[42] Zhao, D., McCoy, A.P., Kleiner, B.M., Mills, T.H. and Lingard, H. (2016) Stakeholder Perceptions of Risk in Construction. Safety Science, 82, 111-119.[CrossRef] [PubMed]
[43] Sanni-Anibire, M.O., Zin, R.M. and Olatunji, S.O. (2022) Machine Learning Model for Delay Risk Assessment in Tall Building Projects. International Journal of Construction Management, 22, 2134-2143.[CrossRef]
[44] Man, S.S., Chan, A.H.S. and Alabdulkarim, S. (2019) Quantification of Risk Perception: Development and Validation of the Construction Worker Risk Perception (CoWoRP) Scale. Journal of Safety Research, 71, 25-39.[CrossRef] [PubMed]
[45] Pinto, A., Nunes, I.L. and Ribeiro, R.A. (2011) Occupational Risk Assessment in Construction Industry—Overview and Reflection. Safety Science, 49, 616-624.[CrossRef]
[46] Marhavilas, P.K., Koulouriotis, D. and Gemeni, V. (2011) Risk Analysis and Assessment Methodologies in the Work Sites: On a Review, Classification and Comparative Study of the Scientific Literature of the Period 2000-2009. Journal of Loss Prevention in the Process Industries, 24, 477-523.[CrossRef]
[47] Ni, H., Chen, A. and Chen, N. (2010) Some Extensions on Risk Matrix Approach. Safety Science, 48, 1269-1278.[CrossRef]
[48] Hubbard, D. and Evans, D. (2010) Problems with Scoring Methods and Ordinal Scales in Risk Assessment. IBM Journal of Research and Development, 54, 2:1-2:10.[CrossRef]
[49] Farooq, M.U., Thaheem, M.J. and Arshad, H. (2018) Improving the Risk Quantification under Behavioural Tendencies: A Tale of Construction Projects. International Journal of Project Management, 36, 414-428.[CrossRef]
[50] Man, S.S., Yu, R., Zhang, T. and Chan, A.H.S. (2022) How Optimism Bias and Safety Climate Influence the Risk-Taking Behavior of Construction Workers. International Journal of Environmental Research and Public Health, 19, Article 1243.[CrossRef] [PubMed]
[51] Caponecchia, C. and Sheils, I. (2011) Perceptions of Personal Vulnerability to Workplace Hazards in the Australian Construction Industry. Journal of Safety Research, 42, 253-258.[CrossRef] [PubMed]
[52] Zhang, K., Ye, G., Xiang, Q. and Chang, Y. (2026) Influencing Mechanism of Optimism Bias on Construction Worker’s Unsafe Behavior: The Role of Risk Perception and Risk Propensity. Engineering, Construction and Architectural Management, 33, 5384-5399.[CrossRef]
[53] Xu, Q. and Xu, K. (2021) Analysis of the Characteristics of Fatal Accidents in the Construction Industry in China Based on Statistical Data. International Journal of Environmental Research and Public Health, 18, Article 2162.[CrossRef] [PubMed]
[54] Jahangiri, M., Solukloei, H.R.J. and Kamalinia, M. (2019) A Neuro-Fuzzy Risk Prediction Methodology for Falling from Scaffold. Safety Science, 117, 88-99.[CrossRef]
[55] Im, H., Kwon, Y., Kim, S., Kim, Y., Ju, Y. and Lee, H. (2009) The Characteristics of Fatal Occupational Injuries in Korea’s Construction Industry, 1997-2004. Safety Science, 47, 1159-1162.[CrossRef]
[56] Zhou, Z., Goh, Y.M. and Li, Q. (2015) Overview and Analysis of Safety Management Studies in the Construction Industry. Safety Science, 72, 337-350.[CrossRef]