Login
Login
切换导航
Home
Articles
Journals
Books
News
About
Services
Submit
Home
Journals
Articles
Journals A-Z
Browse Subjects
Biomedical & Life Sci.
Business & Economics
Chemistry & Materials Sci.
Computer Sci. & Commun.
Earth & Environmental Sci.
Engineering
Medicine & Healthcare
Physics & Mathematics
Social Sci. & Humanities
Browse Subjects
Biomedical & Life Sciences
Business & Economics
Chemistry & Materials Science
Computer Science & Communications
Earth & Environmental Sciences
Engineering
Medicine & Healthcare
Physics & Mathematics
Social Sciences & Humanities
Publish with us
Paper Submission
Information for Authors
Peer-Review Resources
Open Special Issues
Open Access Statement
FAQ
Publish with us
Paper Submission
Information for Authors
Peer-Review Resources
Open Special Issues
Open Access Statement
FAQ
Follow SCIRP
Contact us
[email protected]
+86 18163351462
(WhatsApp)
1655362766
SCIRP WeChat
Publication Date:
📅
--📅
Complete Matching
Editorial Board
Show/Hide Options
Show/Hide Options
All
Title
Abstract
Keywords
DOI
Author
Journal
Affiliation
ISSN
Subject
Representations in Genetic Algorithm for the Job Shop Scheduling Problem: A Computational Study
(Articles)
Tamer F. Abdelmaguid
Journal of Software Engineering and Applications
Vol.3 No.12
, December 31, 2010
DOI:
10.4236/jsea.2010.312135
10,376
Downloads
19,922
Views
Citations
A Cross Entropy-Genetic Algorithm for m-Machines No-Wait Job-ShopScheduling Problem
(Articles)
Budi Santosa
,
Muhammad Arif Budiman
,
Stefanus Eko Wiratno
Journal of Intelligent Learning Systems and Applications
Vol.3 No.3
, August 5, 2011
DOI:
10.4236/jilsa.2011.33018
5,910
Downloads
11,555
Views
Citations
An Improved Contract Net Protocol with Multi-Agent for Reservoir Flood Control Dispatch
(Articles)
Wei Huang
,
Xingnan Zhang
,
Xiaodong Wei
Journal of Water Resource and Protection
Vol.3 No.10
, October 24, 2011
DOI:
10.4236/jwarp.2011.310084
5,096
Downloads
8,679
Views
Citations
Scheduling Aircraft Landings at LSS Airport
(Articles)
Coumba Diallo
,
Babacar Mbaye Ndiaye
,
Diaraf Seck
American Journal of Operations Research
Vol.2 No.2
, June 20, 2012
DOI:
10.4236/ajor.2012.22027
5,836
Downloads
10,625
Views
Citations
Stochastic Programming Model for Discrete Lotsizing and Scheduling Problem on Parallel Machines
(Articles)
Kensuke Ishiwata
,
Jun Imaizumi
,
Takayuki Shiina
,
Susumu Morito
American Journal of Operations Research
Vol.2 No.3
, September 19, 2012
DOI:
10.4236/ajor.2012.23045
3,819
Downloads
6,530
Views
Citations
Conditional Lot Splitting to Avoid Setups While Reducing Flow Time
(Articles)
Jacob V. Simons Jr
,
Mark E. Kraus
,
Willis Mwangola
,
Gerard Burke
American Journal of Operations Research
Vol.2 No.4
, November 30, 2012
DOI:
10.4236/ajor.2012.24054
5,193
Downloads
8,355
Views
Citations
Maintenance Scheduling of Distribution System with Optimal Economy and Reliability
(Articles)
Siyuan Hong
,
Haifeng Li
,
Fengjiao Wang
Engineering
Vol.5 No.9B
, October 10, 2013
DOI:
10.4236/eng.2013.59B003
4,156
Downloads
6,537
Views
Citations
Downlink Scheduling and Rate Capping for LTE-Advanced Carrier Aggregation
(Articles)
Mieszko Chmiel
,
Jin Shi
,
David X. Zhou
Communications and Network
Vol.5 No.3C
, November 7, 2013
DOI:
10.4236/cn.2013.53B2001
4,220
Downloads
7,433
Views
Citations
Cross-layer Resource Allocation on Broadband Power Line Based on Novel QoS-priority Scheduling Function in MAC Layer
(Articles)
Huang Qian
,
Lu Jun
,
Xiong Chen
,
Duan Ruichao
Communications and Network
Vol.5 No.3C
, November 7, 2013
DOI:
10.4236/cn.2013.53B2014
3,226
Downloads
4,735
Views
Citations
A Joint User Selection and Resources Optimization Scheduling Algorithm for CoMP
(Articles)
Xincheng Zhong
,
Weihai Li
,
Yuqin Lv
Communications and Network
Vol.5 No.3C
, November 7, 2013
DOI:
10.4236/cn.2013.53B2026
3,506
Downloads
4,981
Views
Citations
Joint Power Control and Scheduling for Two-Cell Energy Efficient Broadcasting with Network Coding
(Articles)
Linyu Huang
,
Chi Wan Sung
,
Seong-Lyun Kim
Communications and Network
Vol.5 No.3C
, November 11, 2013
DOI:
10.4236/cn.2013.53B2058
3,643
Downloads
5,179
Views
Citations
An Optimal Dynamic Generation Scheduling for a Wind-Thermal Power System
(Articles)
Xingyu Li
,
Dongmei Zhao
Energy and Power Engineering
Vol.5 No.4B
, November 12, 2013
DOI:
10.4236/epe.2013.54B194
5,018
Downloads
6,763
Views
Citations
Material Resource Planning (MRP): Will You Need MRP without the Customer?
(Articles)
Kwahng Kim
Open Journal of Social Sciences
Vol.2 No.4
, March 31, 2014
DOI:
10.4236/jss.2014.24027
9,792
Downloads
14,498
Views
Citations
Assigning Real-Time Tasks in Environmentally Powered Distributed Systems
(Articles)
Jian Lin
,
Albert M. K. Cheng
Circuits and Systems
Vol.5 No.4
, April 16, 2014
DOI:
10.4236/cs.2014.54012
4,041
Downloads
6,124
Views
Citations
A Linear Programming Approach for Parallel Cell Scheduling with Sequence-Dependent Setup Times
(Articles)
Tuğba Yıldız
,
Besim Türker Özalp
,
İlker Küçükoğlu
,
Alkın Yurtkuran
,
Nursel Öztürk
American Journal of Operations Research
Vol.4 No.3
, May 7, 2014
DOI:
10.4236/ajor.2014.43015
3,677
Downloads
5,942
Views
Citations
Comparative Study of Different Representations in Genetic Algorithms for Job Shop Scheduling Problem
(Articles)
Vedavyasrao Jorapur
,
V. S. Puranik
,
A. S. Deshpande
,
M. R. Sharma
Journal of Software Engineering and Applications
Vol.7 No.7
, June 10, 2014
DOI:
10.4236/jsea.2014.77053
4,589
Downloads
7,381
Views
Citations
Research on Cultural Supply Chain Integration and Invocation
(Articles)
Qian Zhang
Social Networking
Vol.3 No.4
, July 30, 2014
DOI:
10.4236/sn.2014.34025
3,323
Downloads
4,574
Views
Citations
Job Scheduling for Cloud Computing Using Neural Networks
(Articles)
Mahmoud Maqableh
,
Huda Karajeh
,
Ra’ed Masa’deh
Communications and Network
Vol.6 No.3
, August 28, 2014
DOI:
10.4236/cn.2014.63021
8,629
Downloads
12,202
Views
Citations
A Branch-and-Bound Based Heuristic Algorithm for Minimizing Makespan in Machining-Assembly Flowshop Scheduling
(Articles)
Kazuko Morizawa
Engineering
Vol.6 No.13
, December 8, 2014
DOI:
10.4236/eng.2014.613081
2,972
Downloads
4,191
Views
Citations
Robust Optimization for a Multi-Product Integrated Problem of Planning and Scheduling under Products Uncertainty
(Articles)
Mengwen Chen
,
Cuiwen Cao
Journal of Applied Mathematics and Physics
Vol.3 No.1
, January 28, 2015
DOI:
10.4236/jamp.2015.31003
3,011
Downloads
4,617
Views
Citations
First
<
...
3
4
5
...
>
Last
Follow SCIRP
Contact us
[email protected]
+86 18163351462(WhatsApp)
1655362766
Paper Publishing WeChat
SCIRP Newsletter
Home
Journals A-Z
Subject
Books
Sitemap
Contact Us
News
About SCIRP
Ethics
Editorial Policies
For Authors
Peer-Review Issues
Publication Fees
Special Issues
Service
Manuscript Tracking System
Order Print Copies
Translation & Proofreading
FAQ
Volume & Issue
Policies
Open Access
Publication Ethics
Preservation
Retraction
Privacy Policy
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top