<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article  PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd"><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article"><front><journal-meta><journal-id journal-id-type="publisher-id">OALibJ</journal-id><journal-title-group><journal-title>Open Access Library Journal</journal-title></journal-title-group><issn pub-type="epub">2333-9705</issn><publisher><publisher-name>Scientific Research Publishing</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.4236/oalib.1105682</article-id><article-id pub-id-type="publisher-id">OALibJ-94736</article-id><article-categories><subj-group subj-group-type="heading"><subject>Articles</subject></subj-group><subj-group subj-group-type="Discipline-v2"><subject>Biomedical&amp;Life Sciences</subject><subject> Business&amp;Economics</subject><subject> Chemistry&amp;Materials Science</subject><subject> Computer Science&amp;Communications</subject><subject> Earth&amp;Environmental Sciences</subject><subject> Engineering</subject><subject> Medicine&amp;Healthcare</subject><subject> Physics&amp;Mathematics</subject><subject> Social Sciences&amp;Humanities</subject></subj-group></article-categories><title-group><article-title>
 
 
  Construction Engineering Project Phase Hidden Costs of Control Strategies
 
</article-title></title-group><contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Shuyang</surname><given-names>Liu</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Jiaye</surname><given-names>Wu</given-names></name><xref ref-type="aff" rid="aff2"><sup>2</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Yue</surname><given-names>Yue</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Yingqian</surname><given-names>Zhang</given-names></name><xref ref-type="aff" rid="aff2"><sup>2</sup></xref></contrib></contrib-group><aff id="aff2"><addr-line>School of Civil Engineering of Sichuan University of Science &amp;amp; Engineering, Zigong, China</addr-line></aff><aff id="aff1"><addr-line>School of Management of Sichuan University of Science &amp;amp; Engineering, Zigong, China</addr-line></aff><pub-date pub-type="epub"><day>02</day><month>08</month><year>2019</year></pub-date><volume>06</volume><issue>08</issue><fpage>1</fpage><lpage>7</lpage><history><date date-type="received"><day>8,</day>	<month>August</month>	<year>2019</year></date><date date-type="rev-recd"><day>26,</day>	<month>August</month>	<year>2019</year>	</date><date date-type="accepted"><day>29,</day>	<month>August</month>	<year>2019</year></date></history><permissions><copyright-statement>&#169; Copyright  2014 by authors and Scientific Research Publishing Inc. </copyright-statement><copyright-year>2014</copyright-year><license><license-p>This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/</license-p></license></permissions><abstract><p>
 
 
  In recent years, the scale of China’s construction industry has been expanding, and construction companies have gradually revealed some problems. Among them, cost management issues are more prominent, especially the management of hidden costs. Because of its strong concealment, the structure is more complicated and difficult to quantify. As a result, a complete research system has not yet been formed. This paper analyzes the influencing factors of construction engineering project in construction stage of the four levels of technology, management, contract and society, uses the expert scoring method to determine the main influencing factors, and proposes the main influencing factors.
 
</p></abstract><kwd-group><kwd>Construction Project</kwd><kwd> Hidden Cost</kwd><kwd> Control Strategy</kwd></kwd-group></article-meta></front><body><sec id="s1"><title>1. Introduction</title><p>In recent years, China has made rapid progress in construction projects. With the increase in construction projects in China, construction companies have achieved the goal of production and operation and obtained profits. The control of construction project cost has a close relationship with the acquisition of profits. The cost of construction projects includes not only explicit costs, but also hidden costs that are hard to quantify. From the contemporary point of view, the management of most construction projects only considers how to manage from the perspective of explicit cost, and does not consider it from the perspective of hidden costs. The hidden cost is the same as the categorical cost, which is the part of the total cost of the project that cannot be ignored. If you do not pay attention to hiding costs and do not control hidden costs, you will lose the benefits of the company to a large extent. Therefore, only when the hidden costs are made seriously, and the full understanding and effective control can obtain the maximum benefits [<xref ref-type="bibr" rid="scirp.94736-ref1">1</xref>] - [<xref ref-type="bibr" rid="scirp.94736-ref7">7</xref>] .</p></sec><sec id="s2"><title>2. Basic Concept Definition</title><sec id="s2_1"><title>2.1. Concealed Cost Concept in the Construction Phase of a Construction Project</title><p>There are different conclusions when analyzing enterprise costs from different angles, but the cost is easily forgotten by managers. For example, due to unreasonable corporate structure, imperfect systems, and technical defects, these costs will increase, and these costs and significant costs will increase. Compared with the characteristics of large concealment and difficulty in quantification, it is called hidden cost [<xref ref-type="bibr" rid="scirp.94736-ref8">8</xref>] . Simply put, the hidden cost is the hidden cost of the behavior that the company or employee intentionally or unintentionally makes, so that it exists in the total cost and is not financial.</p></sec><sec id="s2_2"><title>2.2. Implicit Cost Performance Forms during Construction Phase of the Construction Project</title><p>Construction projects have different manifestations at different times during the construction phase, as shown in <xref ref-type="table" rid="table1">Table 1</xref>.</p></sec></sec><sec id="s3"><title>3. Analysis of Factors Affecting the Hidden Cost of Construction Engineering Projects</title><p>As the most important stage of the construction project, the construction phase depends on resources, environment, technical conditions and other factors. The cost of construction projects as a reflection of the value of their production processes is also determined by these basic factors [<xref ref-type="bibr" rid="scirp.94736-ref9">9</xref>] . The index system of the influencing factors of hidden costs in the construction phase of construction projects is shown in <xref ref-type="table" rid="table2">Table 2</xref>.</p></sec><sec id="s4"><title>4. Expert Evaluation of Research Factors on Hidden Costs</title><p>Main issuing units of this questionnaire are the main parties of construction projects such as construction units, construction units and supervision units. The personnel involved in the questionnaire are mainly the management personnel of these units. The questionnaire uses the numbers 5, 4, 3, 2, and 1, respectively, to indicate that the degree of impact of hidden costs has a large impact, a large impact, a general influence, a slight impact, and no impact. A total of 100 questionnaires were published. After the experts filled out, 86 of them</p><table-wrap id="table1" ><label><xref ref-type="table" rid="table1">Table 1</xref></label><caption><title> The form of hiding costs</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Manifestations</th><th align="center" valign="middle" >Cost increase reason</th></tr></thead><tr><td align="center" valign="middle" >Institutional cost</td><td align="center" valign="middle" >Unreasonable corporate structure and imperfect system</td></tr><tr><td align="center" valign="middle" >Mechanism cost</td><td align="center" valign="middle" >The reward and punishment system is unreasonable, the incentive system is imperfect, and supporting measures are not implemented.</td></tr><tr><td align="center" valign="middle" >Staff quality cost</td><td align="center" valign="middle" >Poor quality of management personnel and construction personnel</td></tr><tr><td align="center" valign="middle" >Quality cost</td><td align="center" valign="middle" >Increase the cost of quality</td></tr><tr><td align="center" valign="middle" >Duration of construction</td><td align="center" valign="middle" >Project delay due to contractor reasons</td></tr><tr><td align="center" valign="middle" >Safety cost</td><td align="center" valign="middle" >Protection of people, materials, and equipment</td></tr></tbody></table></table-wrap><table-wrap id="table2" ><label><xref ref-type="table" rid="table2">Table 2</xref></label><caption><title> Index system for influencing factors of hidden costs in the construction phase of construction projects</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Target layer</th><th align="center" valign="middle" >Criteria layer</th><th align="center" valign="middle" >Indicator layer</th></tr></thead><tr><td align="center" valign="middle"  rowspan="31"  >Index system for influencing factors of hidden costs in the construction phase of construction projects A</td><td align="center" valign="middle"  rowspan="11"  >Management factor B<sub>1 </sub></td><td align="center" valign="middle" >Initiative for staff work C<sub>1</sub></td></tr><tr><td align="center" valign="middle" >Information flow control level C<sub>2</sub></td></tr><tr><td align="center" valign="middle" >Professional competence and technical level C<sub>3</sub></td></tr><tr><td align="center" valign="middle" >Information collection, organization and analysis capabilities C<sub>4</sub></td></tr><tr><td align="center" valign="middle" >Subcontract management C<sub>5</sub></td></tr><tr><td align="center" valign="middle" >Mechanical equipment repair and maintenance C<sub>6</sub></td></tr><tr><td align="center" valign="middle" >Leadership decision level C<sub>7</sub></td></tr><tr><td align="center" valign="middle" >The degree of perfection of the system and mechanism C<sub>8</sub></td></tr><tr><td align="center" valign="middle" >Information transfer rate C<sub>9</sub></td></tr><tr><td align="center" valign="middle" >Safety production management C<sub>10</sub></td></tr><tr><td align="center" valign="middle" >Management organizational structure design C<sub>11</sub></td></tr><tr><td align="center" valign="middle"  rowspan="7"  >Technical factor B<sub>2</sub></td><td align="center" valign="middle" >Quality assurance C<sub>1</sub><sub>2</sub></td></tr><tr><td align="center" valign="middle" >Construction schedule C<sub>1</sub><sub>3</sub></td></tr><tr><td align="center" valign="middle" >Duration guarantee C<sub>14</sub></td></tr><tr><td align="center" valign="middle" >Determination of major construction steps and technical plans C<sub>15</sub></td></tr><tr><td align="center" valign="middle" >Construction deployment and selection of construction methods C<sub>1</sub><sub>6</sub></td></tr><tr><td align="center" valign="middle" >Construction site layout C<sub>1</sub><sub>7</sub></td></tr><tr><td align="center" valign="middle" >Construction machinery and equipment selection C<sub>1</sub><sub>8</sub></td></tr><tr><td align="center" valign="middle"  rowspan="6"  >Contract factor B<sub>3 </sub></td><td align="center" valign="middle" >Progress payment amount C<sub>1</sub><sub>9</sub></td></tr><tr><td align="center" valign="middle" >Project changes C<sub>20</sub></td></tr><tr><td align="center" valign="middle" >Pad production C<sub>21</sub></td></tr><tr><td align="center" valign="middle" >Timeliness of claim C<sub>2</sub><sub>2</sub></td></tr><tr><td align="center" valign="middle" >Material equipment supply C<sub>2</sub><sub>3</sub></td></tr><tr><td align="center" valign="middle" >Contract clause modification C<sub>2</sub><sub>4</sub></td></tr><tr><td align="center" valign="middle"  rowspan="7"  >Social environmental factors B<sub>4 </sub></td><td align="center" valign="middle" >Change in raw material prices C<sub>2</sub><sub>5</sub></td></tr><tr><td align="center" valign="middle" >force majeure C<sub>2</sub><sub>6</sub></td></tr><tr><td align="center" valign="middle" >Changes in laws and regulations C<sub>2</sub><sub>7</sub></td></tr><tr><td align="center" valign="middle" >Industry policy adjustment C<sub>2</sub><sub>8</sub></td></tr><tr><td align="center" valign="middle" >Engineering geological conditions C<sub>2</sub><sub>9</sub></td></tr><tr><td align="center" valign="middle" >Inflation C<sub>30</sub></td></tr><tr><td align="center" valign="middle" >Social security around the project C<sub>31</sub></td></tr></tbody></table></table-wrap><p>finally collect. After analysis, 4 out of the requirements were found, so the final valid questionnaire was 82. The recovery rate of the questionnaire is 82%. In order to ensure the reliability of the collected data, the reliability of the data has to be tested. This paper uses the Cronbach α coefficient of SPSS20.0 software to test, the test result is α = 0.856, the data have reliability (<xref ref-type="table" rid="table3">Table 3</xref>, <xref ref-type="table" rid="table4">Table 4</xref>).</p></sec><sec id="s5"><title>5. Countermeasure Analysis of Recessive Cost Management in Strengthening Construction Projects</title><sec id="s5_1"><title>5.1. Setting a Reasonable Project Organization form</title><p>In the analysis of the influential factors of the hidden cost of the construction phase of the construction project, it is found that the organizational form of the project has a high degree of influence on the hidden cost. Unreasonable organizational settings can result in a waste of resources. Therefore, choosing the appropriate organizational form of a construction project is one of the important measures to control the hidden cost of the construction phase.</p><p>In addition to considering the characteristics of the project organization form, the organizational form should be intended to meet the project objectives. In the organizational setting, the management scope should be effectively considered, and the organization’s authority and responsibility should be clearly defined; at the same time, the management personnel in the organization should be optimized.</p></sec><sec id="s5_2"><title>5.2. Selection of Construction Methods</title><p>The choice of different construction methods will result in distinctive hidden costs [<xref ref-type="bibr" rid="scirp.94736-ref10">10</xref>] . After the previous research, the impact of construction methods on hidden costs is very large. Therefore, choosing a reasonable construction process is one of the important measures to control the hidden costs in the construction phase.</p><p>There is a direct relationship between the construction method and the progress and quality of the construction. Choosing the appropriate construction method will improve the development and quality and reduce the hidden costs in the construction phase. Construction methods can be improved through construction technology innovation to control covert costs. Innovations in construction methods include innovations in construction processes, construction materials and equipment. Although the innovation of the construction method has cost input, it will greatly improve the construction process, so as to better ensure the quality and development of the construction.</p></sec><sec id="s5_3"><title>5.3. Information Communication Management</title><p>Information communication problems can lead to hidden costs. Therefore, management information communication is a necessary measure to control the hidden costs in the construction phase of a construction project.</p><p>Information communication management should make a success of internal information control management and external communication information</p><table-wrap id="table3" ><label><xref ref-type="table" rid="table3">Table 3</xref></label><caption><title> Reliability statistics</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Cronbach’s Alpha</th><th align="center" valign="middle" >Cronbach’s Alpha is based on standardized items</th><th align="center" valign="middle" >Number of items</th></tr></thead><tr><td align="center" valign="middle" >0.856</td><td align="center" valign="middle" >0.886</td><td align="center" valign="middle" >31</td></tr></tbody></table></table-wrap><table-wrap id="table4" ><label><xref ref-type="table" rid="table4">Table 4</xref></label><caption><title> Summary of the impact factors of the hidden costs of the construction project during the construction phase</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Serial number</th><th align="center" valign="middle" >Factors affecting hidden costs in the construction phase of construction projects</th><th align="center" valign="middle" >Average score</th></tr></thead><tr><td align="center" valign="middle" >1</td><td align="center" valign="middle" >Initiative for staff work C<sub>1</sub></td><td align="center" valign="middle" >3.25</td></tr><tr><td align="center" valign="middle" >2</td><td align="center" valign="middle" >Information flow control level C<sub>2</sub></td><td align="center" valign="middle" >3.56</td></tr><tr><td align="center" valign="middle" >3</td><td align="center" valign="middle" >Professional competence and technical level C<sub>3</sub></td><td align="center" valign="middle" >3.12</td></tr><tr><td align="center" valign="middle" >4</td><td align="center" valign="middle" >Information collection, organization and analysis capabilities C<sub>4</sub></td><td align="center" valign="middle" >3.45</td></tr><tr><td align="center" valign="middle" >5</td><td align="center" valign="middle" >Subcontract management C<sub>5</sub></td><td align="center" valign="middle" >3.88</td></tr><tr><td align="center" valign="middle" >6</td><td align="center" valign="middle" >Mechanical equipment repair and maintenance C<sub>6</sub></td><td align="center" valign="middle" >2.96</td></tr><tr><td align="center" valign="middle" >7</td><td align="center" valign="middle" >Leadership decision level C<sub>7</sub></td><td align="center" valign="middle" >3.02</td></tr><tr><td align="center" valign="middle" >8</td><td align="center" valign="middle" >The degree of perfection of the system and mechanism C<sub>8</sub></td><td align="center" valign="middle" >3.03</td></tr><tr><td align="center" valign="middle" >9</td><td align="center" valign="middle" >Information transfer rate C<sub>9</sub></td><td align="center" valign="middle" >3.21</td></tr><tr><td align="center" valign="middle" >10</td><td align="center" valign="middle" >Safety production management C<sub>10</sub></td><td align="center" valign="middle" >2.86</td></tr><tr><td align="center" valign="middle" >11</td><td align="center" valign="middle" >Management organizational structure design C<sub>11</sub></td><td align="center" valign="middle" >4.00</td></tr><tr><td align="center" valign="middle" >12</td><td align="center" valign="middle" >Quality assurance C<sub>1</sub><sub>2</sub></td><td align="center" valign="middle" >3.88</td></tr><tr><td align="center" valign="middle" >13</td><td align="center" valign="middle" >Construction schedule C<sub>1</sub><sub>3</sub></td><td align="center" valign="middle" >4.00</td></tr><tr><td align="center" valign="middle" >14</td><td align="center" valign="middle" >Duration guarantee C<sub>14</sub></td><td align="center" valign="middle" >3.21</td></tr><tr><td align="center" valign="middle" >15</td><td align="center" valign="middle" >Determination of major construction steps and technical plans C<sub>15</sub></td><td align="center" valign="middle" >3.56</td></tr><tr><td align="center" valign="middle" >16</td><td align="center" valign="middle" >Construction deployment and selection of construction methods C<sub>1</sub><sub>6</sub></td><td align="center" valign="middle" >4.00</td></tr><tr><td align="center" valign="middle" >17</td><td align="center" valign="middle" >Construction site layout C<sub>1</sub><sub>7</sub></td><td align="center" valign="middle" >3.89</td></tr><tr><td align="center" valign="middle" >18</td><td align="center" valign="middle" >Construction machinery and equipment selection C<sub>1</sub><sub>8</sub></td><td align="center" valign="middle" >2.56</td></tr><tr><td align="center" valign="middle" >19</td><td align="center" valign="middle" >Progress payment amount C<sub>1</sub><sub>9</sub></td><td align="center" valign="middle" >2.88</td></tr><tr><td align="center" valign="middle" >20</td><td align="center" valign="middle" >Project changes C<sub>20</sub></td><td align="center" valign="middle" >3.68</td></tr><tr><td align="center" valign="middle" >21</td><td align="center" valign="middle" >Pad production C<sub>21</sub></td><td align="center" valign="middle" >3.84</td></tr><tr><td align="center" valign="middle" >22</td><td align="center" valign="middle" >Timeliness of claim C<sub>2</sub><sub>2</sub></td><td align="center" valign="middle" >3.02</td></tr><tr><td align="center" valign="middle" >23</td><td align="center" valign="middle" >Material equipment supply C<sub>2</sub><sub>3</sub></td><td align="center" valign="middle" >4.00</td></tr><tr><td align="center" valign="middle" >24</td><td align="center" valign="middle" >Contract clause modification C<sub>2</sub><sub>4</sub></td><td align="center" valign="middle" >2.88</td></tr><tr><td align="center" valign="middle" >25</td><td align="center" valign="middle" >Change in raw material prices C<sub>2</sub><sub>5</sub></td><td align="center" valign="middle" >3.54</td></tr><tr><td align="center" valign="middle" >26</td><td align="center" valign="middle" >force majeure C<sub>2</sub><sub>6</sub></td><td align="center" valign="middle" >2.55</td></tr><tr><td align="center" valign="middle" >27</td><td align="center" valign="middle" >Changes in laws and regulations C<sub>2</sub><sub>7</sub></td><td align="center" valign="middle" >3.86</td></tr><tr><td align="center" valign="middle" >28</td><td align="center" valign="middle" >Industry policy adjustment C<sub>2</sub><sub>8</sub></td><td align="center" valign="middle" >3.64</td></tr><tr><td align="center" valign="middle" >29</td><td align="center" valign="middle" >Engineering geological conditions C<sub>2</sub><sub>9</sub></td><td align="center" valign="middle" >2.75</td></tr><tr><td align="center" valign="middle" >30</td><td align="center" valign="middle" >Inflation C<sub>30</sub></td><td align="center" valign="middle" >2.54</td></tr><tr><td align="center" valign="middle" >31</td><td align="center" valign="middle" >Social security around the project C<sub>31</sub></td><td align="center" valign="middle" >2.65</td></tr></tbody></table></table-wrap><p>management. The information communication during the construction phase is not only the communication within the project organization but also the communication between the project organization structure and the owners, designers, supervisors, material suppliers and other parties.</p></sec><sec id="s5_4"><title>5.4. Reasonable Arrangements of Construction Progress</title><p>Reasonable arrangement of construction progress is mainly to rationally divide the construction section, and to coordinate the development of each sub-project to achieve the greatest reduction in hidden costs.</p><p>It is important to strengthen overall control over the progress after a reasonable construction schedule has been developed. When managing the construction progress, it is necessary to comprehensively develop the schedule and carry out the dynamic control of the whole process to ensure the smooth implementation of the development target.</p></sec><sec id="s5_5"><title>5.5. Strengthening Subcontract Management</title><p>Subcontracting occurs during the construction phase of most construction projects. Therefore, doing subcontract management is one of the important measures to control hidden costs.</p><p>1) The project department shall analyze the construction content of the construction project during the construction preparation stage. Develop a reasonable subcontracting plan and optimize subcontractors.</p><p>2) Establish a comprehensive subcontracting system and adopt a fine management and control model. The management of subcontracting is a comprehensive and comprehensive management of subcontractors. Strict subcontracting control measures are one of the effective ways to control the hidden costs in the construction phase. The progress of the subcontracting project directly affects the development of the project. Therefore, the progress of the subcontracted project should be refined, and the schedule and progress correction work should be strengthened.</p></sec><sec id="s5_6"><title>5.6. Strengthen Material Equipment Management</title><p>Material equipment is an important aspect of the construction project. Management of material equipment mainly includes material equipment, supplier selection, material equipment arrival time control, and material equipment acceptance management.</p><p>At the same time as selecting the appropriate materials and equipment, it is necessary in order to strengthen the acceptance of materials and equipment. The construction phase of a construction project often only focuses on the selection and purchase of materials and equipment, while ignoring the inspection of materials. Therefore, for the inspection of materials and equipment, it is necessary to follow the applicable implementation standards and strict material entry inspection.</p><p>In addition to the above control measures, it is also necessary to strengthen the understanding of hidden costs for construction project participants to fundamentally control hidden costs.</p></sec></sec><sec id="s6"><title>6. Conclusion</title><p>In this paper, the related literature is studied. The factors affecting the hidden costs are analyzed from the four levels of technology, management, contract and society. 31 influencing factors are obtained. According to these indicators, index system of cost influencing factors in the construction stage is constructed, then, using expert scoring to determine the important influencing factors of hidden costs. At the management level, the main influencing factors are organizational structure design, subcontract management and information communication management; at the technical level, the main influencing factors are the choice of construction methods and the construction schedule; at the contract level, the main influencing factor is the supply of materials and facilities. Finally, in response to these main influencing factors, steps taken to control the hidden costs at this stage are proposed. As people slowly understand the hidden costs, their understanding will be still deepened, and their research will increase, and the research system will gradually improve.</p></sec><sec id="s7"><title>Conflicts of Interest</title><p>The authors declare no conflicts of interest regarding the publication of this paper.</p></sec><sec id="s8"><title>Cite this paper</title><p>Liu, S.Y., Wu, J.Y., Yue, Y. and Zhang, Y.Q. (2019) Construction Engineering Project Phase Hidden Costs of Control Strategies. Open Access Library Journal, 6: e5682. https://doi.org/10.4236/oalib.1105682</p></sec></body><back><ref-list><title>References</title><ref id="scirp.94736-ref1"><label>1</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Zheng</surname><given-names> C.H. </given-names></name>,<etal>et al</etal>. (<year>2013</year>)<article-title>Implicit Cost: Funnel of Loss of Benefits</article-title><source> Management Manager</source><volume> 2</volume>,<fpage> 48</fpage>-<lpage>49</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref2"><label>2</label><mixed-citation publication-type="other" xlink:type="simple">Robin, C.G. (2010) Implicit Cost Management. Management Accounting, 2, 132-152</mixed-citation></ref><ref id="scirp.94736-ref3"><label>3</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Robert</surname><given-names> W. </given-names></name>,<etal>et al</etal>. (<year>2008</year>)<article-title>Construction Costs and Schedules</article-title><source> Energy Policy</source><volume> 3</volume>,<fpage> 317</fpage>-<lpage>333</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref4"><label>4</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Yang</surname><given-names> W.S. </given-names></name>,<etal>et al</etal>. (<year>2014</year>)<article-title>Direct Cost Control of Engineering General Contracting Construction Phase Based on Target Cost Management</article-title><source> Journal of Shijiazhuang Railway University: Social Science Edition</source><volume> 4</volume>,<fpage> 60</fpage>-<lpage>63</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref5"><label>5</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Liu</surname><given-names> C.Y. </given-names></name>,<etal>et al</etal>. (<year>2015</year>)<article-title>Causes and Control Strategies of Hidden Costs in Enterprises</article-title><source> Technology and Management</source><volume> 4</volume>,<fpage> 30</fpage>-<lpage>32</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref6"><label>6</label><mixed-citation publication-type="other" xlink:type="simple">Ching, H. and Yu, C.H. (2011) A New Approach to Calculating Project Cost. International Journal of Project Management, 4, 131-138.</mixed-citation></ref><ref id="scirp.94736-ref7"><label>7</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Candy</surname><given-names> B. </given-names></name>,<etal>et al</etal>. (<year>2013</year>)<article-title>Moni-toring Systems and Their Effectiveness for Project Cost Construction</article-title><source> International Journal of Project Management</source><volume> 2</volume>,<fpage> 145</fpage>-<lpage>154</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref8"><label>8</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Wang</surname><given-names> J.X. </given-names></name>,<etal>et al</etal>. (<year>2012</year>)<article-title>Discussion on Cost Manage-ment of Engineering Construction under Economic Environment</article-title><source> Journal of Shijiazhuang Railway University: Social Science Edition</source><volume> 4</volume>,<fpage> 35</fpage>-<lpage>38</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.94736-ref9"><label>9</label><mixed-citation publication-type="other" xlink:type="simple">Zhang, W.X. (2005) Uncertain Decision-Making Based on Rough Set. Tsinghua University Press, Beijing.</mixed-citation></ref><ref id="scirp.94736-ref10"><label>10</label><mixed-citation publication-type="other" xlink:type="simple">Sun, Z. (2013) Construction Project Cost Control and Research. Xi’an University of Architecture and Technology, Xi’an.</mixed-citation></ref></ref-list></back></article>