<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article  PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd"><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article"><front><journal-meta><journal-id journal-id-type="publisher-id">CS</journal-id><journal-title-group><journal-title>Circuits and Systems</journal-title></journal-title-group><issn pub-type="epub">2153-1285</issn><publisher><publisher-name>Scientific Research Publishing</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.4236/cs.2016.77099</article-id><article-id pub-id-type="publisher-id">CS-66924</article-id><article-categories><subj-group subj-group-type="heading"><subject>Articles</subject></subj-group><subj-group subj-group-type="Discipline-v2"><subject>Computer Science&amp;Communications</subject><subject> Engineering</subject><subject> Physics&amp;Mathematics</subject></subj-group></article-categories><title-group><article-title>
 
 
  A Novel Approach for a Two Area Load Frequency Control in a Competitive Electricity Market Adopting Unscheduled Interchange Price
 
</article-title></title-group><contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Murugesan</surname><given-names>Bhavani</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref><xref ref-type="corresp" rid="cor1"><sup>*</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Kamatchi</surname><given-names>Selvi</given-names></name><xref ref-type="aff" rid="aff2"><sup>2</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Ravi</surname><given-names>Durga</given-names></name><xref ref-type="aff" rid="aff2"><sup>2</sup></xref></contrib></contrib-group><aff id="aff1"><addr-line>Department of Electrical and Electronics Engineering, Anna University Regional Campus Madurai, Madurai, India</addr-line></aff><aff id="aff2"><addr-line>Department of Electrical and Electronics Engineering, Thiagarajar College of Engineering, Madurai, India</addr-line></aff><author-notes><corresp id="cor1">* E-mail:<email>mbeee@autmdu.ac.in(MB)</email>;</corresp></author-notes><pub-date pub-type="epub"><day>27</day><month>05</month><year>2016</year></pub-date><volume>07</volume><issue>07</issue><fpage>1155</fpage><lpage>1166</lpage><history><date date-type="received"><day>21</day>	<month>March</month>	<year>2016</year></date><date date-type="rev-recd"><day>accepted</day>	<month>27</month>	<year>May</year>	</date><date date-type="accepted"><day>30</day>	<month>May</month>	<year>2016</year></date></history><permissions><copyright-statement>&#169; Copyright  2014 by authors and Scientific Research Publishing Inc. </copyright-statement><copyright-year>2014</copyright-year><license><license-p>This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/</license-p></license></permissions><abstract><p>
 
 
  This paper proposes a novel price based load frequency control scheme for a two area system, using an Unscheduled Interchange (UI) price signal, which is ideal and suitable for electricity market. The Government of India has introduced Availability Based Tariff (ABT) structure with an intention of ensuring grid security and to regulate grid indiscipline through Central Electricity Regulatory Commission Regulation. After the introduction of this regulation, the over or under injection by the generating companies (GENCOs) during off peak or peak hours are demoralized and the frequency is maintained at the nominal value. In this paper, the GENCOs instead of reacting to this price signal manually, an automated mode of frequency control is deployed in each area using UI price signal to achieve fast response to load change. The Distribution Company (DISCO) Participation Matrix (DPM) has also been employed in this work to relate the scenario under deregulation of electricity market. The proposed scheme has been verified for different cases by simulating it on a two area system, each having four GENCOs and one DISCO in MATLAB/SIMULINK environment. From the results, it is clearly observed that if the proposed method is employed by all GENCOs, it will certainly enhance the control of system frequency and at the same time throw down the UI liability of market participants. It also ensures that the GENCOs and DISCOs strictly adhere to the bilateral contract following the DISCO participation matrix.
 
</p></abstract><kwd-group><kwd>Deregulated Electricity Market</kwd><kwd> Bilateral Contract</kwd><kwd> Unscheduled Interchange</kwd><kwd> Contract</kwd></kwd-group></article-meta></front><body><sec id="s1"><title>1. Introduction</title><p>After the deregulation of electricity market, the vertical integrated utility has been transformed to novel and divergent entities. Some of them are Generation Companies (GENCOs), Distribution Companies (DISCOs), Transmission Companies (TRANSCOs) and Independent System Operator (ISO). The duty of Independent System Operator is to control all the ancillary services and supervise the transactions that are carried out by the GENCOs and DISCOs. Load Frequency Control is one among such ancillary services. The AGC problem in deregulated electricity market is addressed first in [<xref ref-type="bibr" rid="scirp.66924-ref1">1</xref>] in which the generators are automatically controlled in a system with HVDC connections. The main objective of unbundling electricity market is to fix a price for electricity according to the demand and the generation conditions prevailing at that time. Under deregulated scheme, all the GENCOs and DISCOs in various areas can sign the contract for power transaction and transfer from any GENCO to any DISCO which is known as bilateral transaction [<xref ref-type="bibr" rid="scirp.66924-ref2">2</xref>] . In this paper, the interpretation of DISCO participation matrix for showing bilateral contracts between two areas, as developed in [<xref ref-type="bibr" rid="scirp.66924-ref3">3</xref>] is utilized. In [<xref ref-type="bibr" rid="scirp.66924-ref4">4</xref>] , optimization of integral controller gains with Particle Swarm Optimization and Adaptive-Neuro Fuzzy Inference System for LFC problem in deregulated environment is illustrated.</p><p>From [<xref ref-type="bibr" rid="scirp.66924-ref5">5</xref>] , it is clear that all the generators are able to pick up to 5% of its capacity instantaneously to meet or manage the load change. In order to improve grid security and to regulate grid discipline, a new tariff system known as Availability Based Tariff (ABT) has been introduced in India. This Availability Based Tariff addresses three kinds of charges namely capacity charge, energy charge and Unscheduled Interchange (UI) charge. Of these, UI charge is the resultant of unscheduled interchange of power. This unscheduled interchange charge acts as a powerful tool for regulating grid frequency. To automate the impact of UI charge in the load frequency control, instead of area control error, generation control error is used in the secondary control loop. The algorithm by which the generation control error is calculated is dealt in [<xref ref-type="bibr" rid="scirp.66924-ref6">6</xref>] .</p><p>In general, if the GCE (Generation Control Error) is positive, it means that the generation has to be increased in order that more profit is gained. If the GCE is negative, the intention of gaining more profit can be achieved by decreasing the generation. In general, the profit is accrued by the GENCOs if they respond pertinently to the GCE signals. From [<xref ref-type="bibr" rid="scirp.66924-ref7">7</xref>] , it is observed that by automating the UI price in load frequency control instead of each generator responding to the UI price manually, the time lapse for the generators to respond is eliminated. During pre-ABT periods, the generators were not paid incentives for producing extra power under peak load conditions, and at the same time, the generators enjoyed some financial advantages without reducing the generation according to the demand during off-peak hours. This will affect the regulation in grid discipline. These drawbacks are overcome by the introduction of Availability Based Tariff. Hence this acts as a potential way to resolve the problem of regulating grid frequency automatically while introducing the deregulated scenario simultaneously. The UI charge makes the DISCOs to contribute for the frequency regulation by increasing the cost of buying power when there is under frequency, and by decreasing the cost of buying power when there is abundant power available. Hence the market participants will get benefited if the grid frequency is under control [<xref ref-type="bibr" rid="scirp.66924-ref8">8</xref>] . Though the incorporation of UI mechanism is time consuming compared to conventional AGC, it can be used as a tool to overcome the flaws in grid discipline in the Indian power market [<xref ref-type="bibr" rid="scirp.66924-ref9">9</xref>] . Several new solutions and technical challenges while implementing AGC in the emerging power market scenario are elaborated in [<xref ref-type="bibr" rid="scirp.66924-ref10">10</xref>] .</p><p>In view of the above findings, a research gap is identified that so far no trial has been made to consider unscheduled interchange price in frequency control of two area deregulated power system. Hence, in this work an attempt has been made to incorporate the UI mechanism for a two area system, in such a way that the tie-line power flow is regulated, based on the bilateral contracts paving the way for elimination of congestion taking place in deregulated electricity market.</p><p>The rest of the paper is structured as follows: Section 2 discusses deregulated electricity market and a brief insight into Availability Based Tariff; Section 3 explains the implementation of proposed work with suitable block diagrams; Section 4 discusses the note-worthy results; and Section 5 gives the imperative conclusions from this work.</p></sec><sec id="s2"><title>2. Deregulated Electricity Market</title><p>In deregulated electricity market, all the GENCOs and DISCOs submit their bids as their desired amount for power transaction. The supply and demand curves are drawn based on the bids submitted by the GENCOs and DISCOs. The point at which the demand and supply curve intersects is taken as the Market Clearing Price. Here the Market Clearing Price is taken as the System Marginal Cost. In this work, an assumption is made that the system marginal cost is decided by the supply and demand curves and the generation of scheduled power at each area is based on the system marginal cost which is deemed to be the incremental fuel cost. The simulation model is tested for various system marginal costs. DISCO participation matrix (DPM) is taken as an index for the contract signed between each GENCO and DISCO. The order of DPM indicates the number of GENCOs and DISCOs. The sum of elements in each column should be equal to 1 i.e. each element in the column named as contract participation factor (cpf) is the fraction of power demand of DISCO contracted to be satisfied by the particular GENCO. In this paper, a two area system with four GENCOs and a DISCO in each area is chosen as shown in <xref ref-type="fig" rid="fig1">Figure 1</xref>.</p><p>The DPM for this two area system is given by Equation (1)</p><disp-formula id="scirp.66924-formula79"><label>(1)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x6.png"  xlink:type="simple"/></disp-formula><p>There are certain cases in which the demand contracted by the DISCO faces changes i.e. there is contract violation; it will be reflected in the area corresponding to DISCO. The proportion by which the GENCOs contribute at the particular area depends on the Area Control Error Participation Factor (apf) which means that area control error due to the local demand change is shared proportionally to all the GENCOs in that area. An assumption is made that at least one GENCO in each area should participate in automatic generation control i.e. it has at least one non-zero area control error participation factor.</p><p>Under the present tariff system in India, there is no subdivision of tariff against scheduled and unscheduled interchange of power. Under Availability Based Tariff framed for India, there are separate tariff for scheduled and unscheduled interchange of power. By this splitting mechanism, power trading is promoted. The frequency relation with the UI charge is taken from the Central Electricity Regulatory Commission (CERC) framework, 2012. As per this framework, if the frequency is very low i.e. below 49.5 Hz, then UI charge is very high i.e. the buying entity is charged at a very high price which indirectly forces them to reduce their consumption resulting in enhancement of frequency. If the frequency is very high i.e. above 50.2 Hz, the buying entity is not charged</p><fig id="fig1"  position="float"><label><xref ref-type="fig" rid="fig1">Figure 1</xref></label><caption><title> Representation of two area power system in a deregulated electricity market</title></caption><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x7.png"/></fig><p>for unscheduled interchange resulting in pulling down the frequency closer to its nominal value. From <xref ref-type="fig" rid="fig2">Figure 2</xref> it is seen that the UI price is inversely proportional to the frequency.</p></sec><sec id="s3"><title>3. Block Diagram of the Proposed System</title><p>In traditional automatic generation control, tie-line power deviation and steady state frequency deviation are taken as the feedback to cut down the area control error to zero. But in the proposed system, UI price signal is derived from the frequency signals which again is compared with the cost for actual generation.</p><p>The signal thus generated is known as Generation Control Error (GCE). This GCE along with the tie-line power deviation is taken as the feedback to reduce the area control error to zero. The comparison of UI price with the actual generation cost is based on the modified Generation Control Error algorithm [<xref ref-type="bibr" rid="scirp.66924-ref7">7</xref>] .</p><p>This generation control error is used as the input to the integral controller in the secondary control loop of the load frequency control. The generation in each GENCO in all the areas is based on the DISCO participation matrix. The output of each generator is controlled to produce power as per the contract made. This is done using the local economic dispatch controller which receives the signals from the global economic dispatch controller.</p><p>The price based load frequency control loop of an area with DPM in deregulated environment is shown in block diagram in <xref ref-type="fig" rid="fig3">Figure 3</xref>. The proposed model is tested for a two area system having four GENCOs and one DISCO each. The detailed schematic of price based frequency regulation model for a single area is depicted in <xref ref-type="fig" rid="fig4">Figure 4</xref>.</p><p>The UI charge is calculated based on the frequency range using Equations (2)-(8) as follows:</p><p>Let <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x8.png" xlink:type="simple"/></inline-formula> be the frequency signal and <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x9.png" xlink:type="simple"/></inline-formula> be the UI price signal,</p><disp-formula id="scirp.66924-formula80"><label>(2)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x10.png"  xlink:type="simple"/></disp-formula><p>If <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x11.png" xlink:type="simple"/></inline-formula></p><disp-formula id="scirp.66924-formula81"><label>(3)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x12.png"  xlink:type="simple"/></disp-formula><p>If <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x13.png" xlink:type="simple"/></inline-formula></p><disp-formula id="scirp.66924-formula82"><label>(4)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x14.png"  xlink:type="simple"/></disp-formula><p>If <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x15.png" xlink:type="simple"/></inline-formula></p><disp-formula id="scirp.66924-formula83"><label>(5)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x16.png"  xlink:type="simple"/></disp-formula><p>If <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x17.png" xlink:type="simple"/></inline-formula></p><disp-formula id="scirp.66924-formula84"><label>(6)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x18.png"  xlink:type="simple"/></disp-formula><p>If <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x19.png" xlink:type="simple"/></inline-formula></p><disp-formula id="scirp.66924-formula85"><label>(7)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x20.png"  xlink:type="simple"/></disp-formula><p>Let <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x21.png" xlink:type="simple"/></inline-formula> be the incremental fuel cost given by Equation (8),</p><fig id="fig2"  position="float"><label><xref ref-type="fig" rid="fig2">Figure 2</xref></label><caption><title> UI charge (Rs/MWh) vs frequency (Hz) as per CERC 2012 regulation</title></caption><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x22.png"/></fig><fig id="fig3"  position="float"><label><xref ref-type="fig" rid="fig3">Figure 3</xref></label><caption><title> Block diagram of a price based load frequency control of an area i in a deregulated environment</title></caption><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x23.png"/></fig><disp-formula id="scirp.66924-formula86"><label>(8)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x24.png"  xlink:type="simple"/></disp-formula><p>where <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x25.png" xlink:type="simple"/></inline-formula> and <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x25.png" xlink:type="simple"/></inline-formula><inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x26.png" xlink:type="simple"/></inline-formula> are the incremental cost co-efficients.</p><p><inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x27.png" xlink:type="simple"/></inline-formula>is given by Equation (9)</p><disp-formula id="scirp.66924-formula87"><label>(9)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x28.png"  xlink:type="simple"/></disp-formula><p>where <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x29.png" xlink:type="simple"/></inline-formula> is the initial scheduled power and <inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x29.png" xlink:type="simple"/></inline-formula><inline-formula><inline-graphic xlink:href="http://html.scirp.org/file/9-7600571x30.png" xlink:type="simple"/></inline-formula> is the load shared by the generator.</p><p>The generation control error is calculated based on the Generation Control Error Algorithm which is given in</p><fig id="fig4"  position="float"><label><xref ref-type="fig" rid="fig4">Figure 4</xref></label><caption><title> Schematic model of area i with four GENCOs with price based load frequency regulation</title></caption><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x31.png"/></fig><p><xref ref-type="fig" rid="fig5">Figure 5</xref>.</p></sec><sec id="s4"><title>4. Results and Discussions</title><p>A power system with two areas is considered to demonstrate the effectiveness of the proposed price based load frequency regulation. The price based secondary frequency control loop contains an integral controller for each</p><fig id="fig5"  position="float"><label><xref ref-type="fig" rid="fig5">Figure 5</xref></label><caption><title> Flowchart for generation control error calculation</title></caption><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x32.png"/></fig><p>GENCO and is tuned using MATLAB PID tuner. The Automatic PID Tuner allows achieving a good balance between performance and robustness of the integral controller. It is assumed that the two areas are identical with each 5000 MW capacity. The parameters of the test system are given in Tables A1-A3. To validate the proposed method, two test cases are considered. In the first case, it is assumed that the DISCOs in both the areas have load variation of 100 MW each. The load variations of the DISCOs are met by the GENCOs in both the areas based on the bilateral contract executed between them. In the second case, it is assumed that along with the 100 MW load variations of DISCO<sub>1</sub> and DISCO<sub>2</sub> there is an additional local load change of 100 MW in DISCO<sub>1</sub>.</p><p>Case I: In this case, all the power dispersing authorities will enter into a contract with the power producing authorities for power based on the following DPM</p><disp-formula id="scirp.66924-formula88"><graphic  xlink:href="http://html.scirp.org/file/9-7600571x33.png"  xlink:type="simple"/></disp-formula><p>The simulation results for this case are shown in <xref ref-type="fig" rid="fig6">Figure 6</xref>. When the load of DISCO<sub>1</sub> and DISCO<sub>2</sub> increase their demand by 100 MW, the system frequency rapidly drops from the nominal value. The GENCOS in the two areas will respond to this load variation based on the DISCO participation matrix (DPM) and UI price signal, this co-action drives the system frequency to settle closer to the nominal value. From <xref ref-type="fig" rid="fig6">Figure 6</xref>(a), it is evident that the frequency deviation drops suddenly and finally settle to a value around 49.99 Hz. It leads the UI price of both area I and II to settle at 1732 Rs/MW has depicted in <xref ref-type="fig" rid="fig6">Figure 6</xref>(b).</p><fig-group id="fig6"><label><xref ref-type="fig" rid="fig6">Figure 6</xref></label><caption><title> (a) System frequency (Hz); (b) UI rate (Rs/MWhr); (c) Change in tie line power, actual and error (MW); (d) change in generation in each unit in area I and II (MW).</title></caption><fig id ="fig6_1"><label> (b)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x34.png"/></fig><fig id ="fig6_2"><label>(c)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x35.png"/></fig><fig id ="fig6_3"><label> (d)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x36.png"/></fig><fig id ="fig6_4"><label></label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x37.png"/></fig></fig-group><p>The scheduled tie-line power deviation is as given by,</p><disp-formula id="scirp.66924-formula89"><label>(10)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x38.png"  xlink:type="simple"/></disp-formula><p>From <xref ref-type="fig" rid="fig6">Figure 6</xref>(c), it is observed that, as the change in tie-line power flow error settles to zero, the change in actual tie-line power flow from area 2 to area 1matches the scheduled value of 20 MW.</p><p>Since GENCO<sub>1</sub> and GENCO<sub>5</sub> are already generating power at their maximum capacity, they cannot contribute for any load change. Hence the corresponding cpfs are zero in the DPM matrix. The change in generation of GENCO2 is given by</p><disp-formula id="scirp.66924-formula90"><label>(11)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x39.png"  xlink:type="simple"/></disp-formula><p>Similarly ΔP<sub>g</sub><sub>3</sub> = 0.035 p.u.MW = 35 MW, ΔP<sub>g</sub><sub>4</sub> = 0.005 p.u.MW = 5MW, ΔP<sub>g</sub><sub>6</sub> = 0.055 p.u.MW = 55 MW, ΔP<sub>g</sub><sub>7</sub> = 0.05 p.u.MW = 50 MW, ΔP<sub>g</sub><sub>8</sub> = 0.015 p.u.MW = 15 MW. The total change in generation by GENCOs in the system sums to a value of 200 MW i.e. the total load change considered in this case.</p><p>From <xref ref-type="fig" rid="fig6">Figure 6</xref>(d), the actual power generated by each GENCO matches the desired value as per the DPM.</p><p>Case II: There is a possibility that the DISCO in a deregulated electricity market may violate the agreement by drawing excess power than that stipulated in the agreement. This local demand should be satisfied by the power producing authorities in the corresponding DISCO area. The change in demand and the DPM is assumed to be similar with case I. In addition to this, it is assumed that there is a contract violation of 100 MW by DISCO<sub>1</sub>. Simulation results are shown in Figures 7(a)-(d). Though the DPM and the change in demand are same for both the cases, due to this contract violation, the trajectory of change in generation of area 1 is not identical to that of case I. GENCOs in area 1 share this contract violation based on the Area Control Error Participation Factor (apf). The values of apf are chosen as apf<sub>11</sub> = 0, apf<sub>21</sub> = 0.25, apf<sub>31</sub> = 0.25, apf<sub>41</sub> = 0.5, apf<sub>52</sub> = 0, apf<sub>62</sub> = 0.25, apf<sub>72</sub> = 0.25, apf<sub>82</sub> = 0.5. The system frequency of area1 abruptly drops to a value of about 49.8 Hz due to contract violation and settles by the corrective action taken by the price based feedback in the secondary loop of frequency control. From the simulation result it is evident that due to contract violation in area 1, the load sharing by the GENCOs in area 1 differs in case II with that of case I.</p><p>The load shared by GENCO2 is given by</p><disp-formula id="scirp.66924-formula91"><label>(12)</label><graphic position="anchor" xlink:href="http://html.scirp.org/file/9-7600571x40.png"  xlink:type="simple"/></disp-formula><p>Similarly for the remaining GENCOs in area I,</p><disp-formula id="scirp.66924-formula92"><graphic  xlink:href="http://html.scirp.org/file/9-7600571x41.png"  xlink:type="simple"/></disp-formula><p>The change in generation for the units in area I and II are shown in <xref ref-type="fig" rid="fig7">Figure 7</xref>(d).</p><p>Since there is no contract violation in area II, the load sharing by each GENCO in area II remains the same as in case I. It can be observed from <xref ref-type="fig" rid="fig7">Figure 7</xref>(b) that, due to contract violation in area I, the peak value of UI price</p><fig-group id="fig7"><label><xref ref-type="fig" rid="fig7">Figure 7</xref></label><caption><title> (a) System frequency (Hz); (b) UI rate (Rs/MWhr); (c) Change in tie line power, actual and error (MW); (d) change in generation in each unit in area I and II (MW).</title></caption><fig id ="fig7_1"><label> (b)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x42.png"/></fig><fig id ="fig7_2"><label>(c)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x43.png"/></fig><fig id ="fig7_3"><label> (d)</label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x44.png"/></fig><fig id ="fig7_4"><label></label><graphic mimetype="image"   position="float"  xlink:type="simple"  xlink:href="http://html.scirp.org/file/9-7600571x45.png"/></fig></fig-group><table-wrap id="table1" ><label><xref ref-type="table" rid="table1"><xref ref-type="table" rid="table">Table </xref>1</xref></label><caption><title> Change in generation of GENCOs for case I and II</title></caption><table><tbody><thead><tr><th align="center" valign="middle"  rowspan="2"  >Case</th><th align="center" valign="middle"  colspan="8"  >Average change in generation (MW)</th></tr></thead><tr><td align="center" valign="middle" >ΔP<sub>g1</sub></td><td align="center" valign="middle" >ΔP<sub>g2</sub></td><td align="center" valign="middle" >ΔP<sub>g3</sub></td><td align="center" valign="middle" >ΔP<sub>g4</sub></td><td align="center" valign="middle" >ΔP<sub>g5</sub></td><td align="center" valign="middle" >ΔP<sub>g6</sub></td><td align="center" valign="middle" >ΔP<sub>g7</sub></td><td align="center" valign="middle" >ΔP<sub>g8</sub></td></tr><tr><td align="center" valign="middle" >I</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >30.6</td><td align="center" valign="middle" >26.8</td><td align="center" valign="middle" >3.6898</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >42</td><td align="center" valign="middle" >38</td><td align="center" valign="middle" >11.2</td></tr><tr><td align="center" valign="middle" >II</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >46.0</td><td align="center" valign="middle" >42.5</td><td align="center" valign="middle" >38.895</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >40</td><td align="center" valign="middle" >35.5</td><td align="center" valign="middle" >10.6</td></tr></tbody></table></table-wrap><table-wrap id="table2" ><label><xref ref-type="table" rid="table2"><xref ref-type="table" rid="table">Table </xref>2</xref></label><caption><title> Profit earned by GENCOs for case I and II</title></caption><table><tbody><thead><tr><th align="center" valign="middle"  rowspan="2"  >Case</th><th align="center" valign="middle"  rowspan="2"  >Avg. Frequency (Hz)</th><th align="center" valign="middle"  rowspan="2"  >Avg. Change in UI (Rs/MWh)</th><th align="center" valign="middle"  colspan="8"  >Profit earned by each GENCO in area 1 and 2 for 100 seconds (Rs)</th></tr></thead><tr><td align="center" valign="middle" >GEN 1</td><td align="center" valign="middle" >GEN 2</td><td align="center" valign="middle" >GEN 3</td><td align="center" valign="middle" >GEN4</td><td align="center" valign="middle" >GEN 5</td><td align="center" valign="middle" >GEN 6</td><td align="center" valign="middle" >GEN 7</td><td align="center" valign="middle" >GEN8</td></tr><tr><td align="center" valign="middle" >I</td><td align="center" valign="middle" >49.9848</td><td align="center" valign="middle" >1867.3</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >1589.4</td><td align="center" valign="middle" >1389.8</td><td align="center" valign="middle" >191.3</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >2143.7</td><td align="center" valign="middle" >1947.1</td><td align="center" valign="middle" >571.9</td></tr><tr><td align="center" valign="middle" >II</td><td align="center" valign="middle" >49.9830</td><td align="center" valign="middle" >1892.8</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >2419.5</td><td align="center" valign="middle" >2232.8</td><td align="center" valign="middle" >2045</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >2005.2</td><td align="center" valign="middle" >1822.9</td><td align="center" valign="middle" >547.2</td></tr></tbody></table></table-wrap><p>in this area shoots up to 3895 Rs/MWh when compared to the peak value of UI price 3014 Rs/MWhin area II.</p><p>In real time, the incentives given and penalties imposed on the participants are based on the average frequency for the time block of 15 minutes. The average change in generation for case I and II for a short time period of 100 seconds is tabulated in <xref ref-type="table" rid="table1"><xref ref-type="table" rid="table">Table </xref>1</xref>. The profit earned by various GENCOs is given in <xref ref-type="table" rid="table2"><xref ref-type="table" rid="table">Table </xref>2</xref>. The automated UI mechanism has made the GENCOs to earn profit and at the same time, it indirectly forces the DISCOs to reduce the unscheduled interchange. The GENCOs with high incremental fuel cost, which is not preferred by DISCOs under normal condition, will get an opportunity to serve the load and earn profit during contract violation.</p></sec><sec id="s5"><title>5. Conclusion</title><p>In this research, load frequency control is performed for a two area deregulated electricity market by incorporating UI mechanism in the secondary loop. With the penetration of distributed generation in electricity market, the power imbalances are inherent leading to variation in system frequency. The UI mechanism adopted here acts as a tool to carry out prominent adjustment of scheduled generated power to match the actual load behavior. The results of load variations for bilateral contract with and without contract violation after incorporating automated UI mechanism prove the competence of the proposed method, since this scheme is capable of quickly balancing the power demand with supply and restore frequency even with contingencies like generation outage. In the meanwhile, the possibility of unscheduled interchange truncates within a shorter time due to the automation of UI signal in load frequency control. The UI liability of power market participants can be immensely reduced. The real time price signal will enable the high cost generating plants with renewable energy sources to afford the local demand changes. In the future, the work can be extended for a real time system with multilateral transactions.</p></sec><sec id="s6"><title>Cite this paper</title><p>Murugesan Bhavani,Kamatchi Selvi,Ravi Durga, (2016) A Novel Approach for a Two Area Load Frequency Control in a Competitive Electricity Market Adopting Unscheduled Interchange Price. Circuits and Systems,07,1155-1166. doi: 10.4236/cs.2016.77099</p></sec><sec id="s7"><title>Appendix A</title><table-wrap id="table3" ><label><xref ref-type="table" rid="table">Table </xref>A1</label><caption><title> System data</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Parameters</th><th align="center" valign="middle" >G<sub>1</sub></th><th align="center" valign="middle" >G<sub>2</sub></th><th align="center" valign="middle" >G<sub>3</sub></th><th align="center" valign="middle" >G<sub>4</sub></th></tr></thead><tr><td align="center" valign="middle" >Capacity(MW)</td><td align="center" valign="middle" >1500</td><td align="center" valign="middle" >1500</td><td align="center" valign="middle" >1000</td><td align="center" valign="middle" >1000</td></tr><tr><td align="center" valign="middle" >b ( INR/MWh)</td><td align="center" valign="middle" >800</td><td align="center" valign="middle" >1000</td><td align="center" valign="middle" >1600</td><td align="center" valign="middle" >2000</td></tr><tr><td align="center" valign="middle" >c (INR/MW<sup>2</sup>h)</td><td align="center" valign="middle" >0.3</td><td align="center" valign="middle" >0.3</td><td align="center" valign="middle" >0.4</td><td align="center" valign="middle" >0.4</td></tr><tr><td align="center" valign="middle" >Initial Generation P<sub>go</sub></td><td align="center" valign="middle" >1500</td><td align="center" valign="middle" >1416.66</td><td align="center" valign="middle" >312.5</td><td align="center" valign="middle" >0</td></tr></tbody></table></table-wrap><p>Where b and c are the cost coefficients of each generator for calculating the incremental fuel cost.</p><table-wrap id="table4" ><label><xref ref-type="table" rid="table">Table </xref>A2</label><caption><title> Area parameters</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >M (MW-s/Hz)</th><th align="center" valign="middle" >1000</th></tr></thead><tr><td align="center" valign="middle" >D (MW/Hz)</td><td align="center" valign="middle" >100</td></tr><tr><td align="center" valign="middle" >F<sup>0</sup> (Hz)</td><td align="center" valign="middle" >50</td></tr><tr><td align="center" valign="middle" >Synchronizing Power Co-efficient, T<sub>12</sub> (p.u)</td><td align="center" valign="middle" >0.0707</td></tr><tr><td align="center" valign="middle" >System Marginal Cost (Rs/MWh)</td><td align="center" valign="middle" >1850</td></tr></tbody></table></table-wrap><p>Where M is the inertia constant, D is the damping coefficient.</p><table-wrap id="table5" ><label><xref ref-type="table" rid="table">Table </xref>A3</label><caption><title> Droop, governor and turbine time constant</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Parameters</th><th align="center" valign="middle" >Machine 1</th><th align="center" valign="middle" >Machine 2</th><th align="center" valign="middle" >Machine 3</th><th align="center" valign="middle" >Machine 4</th></tr></thead><tr><td align="center" valign="middle" >Droop R</td><td align="center" valign="middle" >6%</td><td align="center" valign="middle" >6%</td><td align="center" valign="middle" >6%</td><td align="center" valign="middle" >6%</td></tr><tr><td align="center" valign="middle" >Governor time constant T<sub>sg</sub> (sec)</td><td align="center" valign="middle" >0.3</td><td align="center" valign="middle" >0.3</td><td align="center" valign="middle" >0.3</td><td align="center" valign="middle" >0.3</td></tr><tr><td align="center" valign="middle" >Turbine time constant T<sub>t</sub> (sec)</td><td align="center" valign="middle" >0.5</td><td align="center" valign="middle" >0.5</td><td align="center" valign="middle" >0.5</td><td align="center" valign="middle" >0.5</td></tr></tbody></table></table-wrap></sec></body><back><ref-list><title>References</title><ref id="scirp.66924-ref1"><label>1</label><mixed-citation publication-type="other" xlink:type="simple">Bakken, B.H. and Grande, O.S. (1998) Automatic Generation Control in a Deregulated Power System. IEEE Transactions on Power Systems, 13, 4.</mixed-citation></ref><ref id="scirp.66924-ref2"><label>2</label><mixed-citation publication-type="other" xlink:type="simple">Ezra, H., Rick, H. and Smith, A. (2008) Bilateral Contracting in Deregulated Electricity Markets. A Report to the Ame- rican Public Power Association. https://www.publicpower.org/files/PDFs/EMRISynapseBilateralsReport2008.pdf</mixed-citation></ref><ref id="scirp.66924-ref3"><label>3</label><mixed-citation publication-type="other" xlink:type="simple">Vaibhav, D. and Pai, M.A. (2001) Simulation and Optimization in an AGC System after Deregulation. IEEE Transactions on Power Systems, 16, 3. http://dx.doi.org/10.1109/59.932285</mixed-citation></ref><ref id="scirp.66924-ref4"><label>4</label><mixed-citation publication-type="other" xlink:type="simple">Hosseini, S.H. and Etemadi, A.H. (2008) Adaptive Neuro-Fuzzy Inference System Based Automatic Generation Control. Electric Power Systems Research, 78, 1230-1239. http://dx.doi.org/10.1016/j.epsr.2007.10.007</mixed-citation></ref><ref id="scirp.66924-ref5"><label>5</label><mixed-citation publication-type="other" xlink:type="simple">Hassan Bevrani, M. (2014) Robust Power System Frequency Control. Springer International Publishing, Cham.</mixed-citation></ref><ref id="scirp.66924-ref6"><label>6</label><mixed-citation publication-type="other" xlink:type="simple">Parida, S.K., Singh, S.N. and Srivastava, S.C. (2009) An Integrated Approach for Optimal Frequency Regulation Service Procurement in India. Energy Policy, 37, 3020-3034.</mixed-citation></ref><ref id="scirp.66924-ref7"><label>7</label><mixed-citation publication-type="other" xlink:type="simple">Saurabh, C. and Ashwani, K. (2010) A Price Based Automatic Generation Control Using Unscheduled Interchange Price Signals in Indian Electricity System. International Journal of Engineering, Science and Technology, 2, 23-30. http://dx.doi.org/10.4314/ijest.v2i2.59135</mixed-citation></ref><ref id="scirp.66924-ref8"><label>8</label><mixed-citation publication-type="other" xlink:type="simple">Pujara, S.M. and Kotwal, C.D. (2014) Optimized Integral Gain Controllers for Price Based Frequency Regulation of Single Area Multi-Unit Power System. International Journal on Electrical Engineering and Informatics, 6, 2.</mixed-citation></ref><ref id="scirp.66924-ref9"><label>9</label><mixed-citation publication-type="other" xlink:type="simple">Gargi, K., Niladri, C. and Kamal Krishna, M. (2014) Unscheduled Interchange (UI) Price Based Secondary Frequency Control of an Interconnected Hybrid Power System. Annual IEEE India Conference (INDICON), Pune, 11-13 December 2014, 1-6.</mixed-citation></ref><ref id="scirp.66924-ref10"><label>10</label><mixed-citation publication-type="other" xlink:type="simple">Soonee, S.K., Narasimhan, S.R. and Pandey, V. (2006) Significance of Unscheduled Interchange Mechanism in the Indian Electricity Supply Industry. International Conference on Power system Operation in Deregulated Regime, Varanasi, 6-7 March 2006, 1-4.</mixed-citation></ref></ref-list></back></article>