<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.4 20241031//EN" "JATS-journalpublishing1-4.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article" dtd-version="1.4" xml:lang="en">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">epe</journal-id>
      <journal-title-group>
        <journal-title>Energy and Power Engineering</journal-title>
      </journal-title-group>
      <issn pub-type="epub">1947-3818</issn>
      <issn pub-type="ppub">1949-243X</issn>
      <publisher>
        <publisher-name>Scientific Research Publishing</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.4236/epe.2026.1811036</article-id>
      <article-id pub-id-type="publisher-id">epe-155113</article-id>
      <article-categories>
        <subj-group>
          <subject>Article</subject>
        </subj-group>
        <subj-group>
          <subject>Engineering</subject>
        </subj-group>
      </article-categories>
      <title-group>
        <article-title>Electricity Demand Growth and Security of Supply in Côte d’Ivoire: Statistical Analysis for 2014-2025 and Scenarios to 2030</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author" corresp="yes">
          <contrib-id contrib-id-type="orcid">0000-0002-2312-0748</contrib-id>
          <name name-style="western">
            <surname>Gbah</surname>
            <given-names>Kone</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="western">
            <surname>Rene</surname>
            <given-names>N’Guetta Akpagni</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="western">
            <surname>Renato</surname>
            <given-names>N’Guessan Konan Felix</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
      </contrib-group>
      <aff id="aff1"><label>1</label> Laboratoire d’Ingénierie Electronique, d’Electricité et des Systèmes Embarqués (LIEESE), Institut National Polytechnique Félix Houphouët-Boigny (INPHB), Yamoussoukro, Côte d’Ivoire </aff>
      <author-notes>
        <fn fn-type="conflict" id="fn-conflict">
          <p>The authors declare no conflicts of interest regarding the publication of this paper.</p>
        </fn>
      </author-notes>
      <pub-date pub-type="epub">
        <day>05</day>
        <month>11</month>
        <year>2026</year>
      </pub-date>
      <pub-date pub-type="collection">
        <month>11</month>
        <year>2026</year>
      </pub-date>
      <volume>18</volume>
      <issue>11</issue>
      <fpage>777</fpage>
      <lpage>806</lpage>
      <history>
        <date date-type="received">
          <day>28</day>
          <month>09</month>
          <year>2026</year>
        </date>
        <date date-type="accepted">
          <day>02</day>
          <month>11</month>
          <year>2026</year>
        </date>
        <date date-type="published">
          <day>05</day>
          <month>11</month>
          <year>2026</year>
        </date>
      </history>
      <permissions>
        <copyright-statement>© 2026 by the authors and Scientific Research Publishing Inc.</copyright-statement>
        <copyright-year>2026</copyright-year>
        <license license-type="open-access">
          <license-p> This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license ( <ext-link ext-link-type="uri" xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link> ). </license-p>
        </license>
      </permissions>
      <self-uri content-type="doi" xlink:href="https://doi.org/10.4236/epe.2026.1811036">https://doi.org/10.4236/epe.2026.1811036</self-uri>
      <abstract>
        <p>Electricity demand is increasing rapidly in Côte d’Ivoire due to population growth, economic development, urbanization, and expanded access to power. While this growth supports the country’s development, it also puts additional pressure on generation capacity, transmission and distribution networks, and regional electricity exchanges. This work examines progress in electricity demand from 2014 to 2025 and provides projections through 2030. The study begins by assessing trends in the main indicators (electricity consumption, domestic generation, imports, export balance, customers number, distribution efficiency and average outage duration) by using three complementary methods: linear regression, the Mann-Kendall test, and Sen’s slope. Pearson, Spearman and partial correlations controlling for time are then used to give additional insight into the relationship among these variables. The results show that domestic electricity consumption nearly doubled between 2014 and 2025, increasing from 7333 to 14,635 GWh. This growth trend was statistically established, with a coefficient of determination of R<sup>2</sup> = 0.956, a p-value below 0.001 and a Sen slope of 625 GWh/year. Furthermore, imports also increased significantly, while the net export balance decreased by approximately 101 GWh/year. The relationship between electricity consumption and imports remained strong and positive after controlling for the effect of time, with a partial correlation coefficient of r = 0.782 and a p-value of 0.0044, confirming that this association is statistically significant. In 2025, these imports reached 708 GWh, while total plant availability dropped to 79 percent, with a net balance of only about 90 GWh. Finally, three main scenarios project consumption between 18.7 and 21.5 TWh by 2030. Consequently, generation capacity, network infrastructure, and plant availability need to improve in line with growing electricity demand to reduce the risk of supply shortages and greater dependence on electricity imports. Although these findings do not represent a probabilistic adequacy assessment, they reveal consistent signs of a tightening supply demand balance and support the need of integration planning generation, transmission and distribution infrastructure, losses reduction, and regional interconnections.</p>
      </abstract>
      <kwd-group kwd-group-type="author-generated" xml:lang="en">
        <kwd>Electricity Demand</kwd>
        <kwd>Security of Supply</kwd>
        <kwd>Ivorian Power System</kwd>
        <kwd>Trend Analysis</kwd>
        <kwd>Energy Scenarios</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec1">
      <title>1. Introduction</title>
      <p>Electricity has become a key indicator of a country’s economic and social development. It supports industry, services, communications, healthcare, education and better living conditions. Across Africa electricity demand grew by 3.4% in 2024, compared with slightly than 2% in 2023 [<xref ref-type="bibr" rid="B1">1</xref>]. Consequently, ensuring a reliable, stable and less expensive power supply in the context of population growth, rapid urbanization, and climate change creates new challenges.</p>
      <p>Côte d’Ivoire is distinguished for the dynamism and resilience of its economy. In 2024, its gross domestic product (GDP) was about 6%, compared with an average of 3.2% for sub-Saharan Africa. Between 2011 and 2024, the country recorded average annual economic growth of 6.1%, supported mainly by investment, infrastructure, agriculture, industry, and services. This performance gives it a central role within the West African Economic and Monetary Union (UEMOA). Although it accounts for about 21% of the Union’s population, the country generates nearly 40% of its nominal GDP and approximately 42% of its exports [<xref ref-type="bibr" rid="B2">2</xref>]. Côte d’Ivoire power system supports an expanding economy and contributes to electricity exchanges within the West African Power Pool (WAPP). The country has historically exported electricity to several regional countries, including Burkina Faso, Mali, Liberia, Sierra Leone, and Guinea. Maintaining this role requires additional generation capacity and modernizing transmission and distribution networks to meet domestic demand and honor export contracts. Interconnections provide valuable flexibility, but they cannot replace reliable generation capacity or a strong power grid [<xref ref-type="bibr" rid="B3">3</xref>]-[<xref ref-type="bibr" rid="B5">5</xref>]. </p>
      <p>The 2025 data reveal a mixed picture. Installed capacity reached 3224 MW, while net domestic generation increased to 14,563 GWh. During same year, domestic electricity consumption totaled 14,635 GWh, and the availability of generation facilities fell to 79%. In addition, electricity imports nearly doubled compared with 2024. Gas supply shortages, changes in hydropower availability and aging generation, transmission, and distribution equipment increase the risk of severe system constraints during peak demand period [<xref ref-type="bibr" rid="B6">6</xref>]-[<xref ref-type="bibr" rid="B8">8</xref>]. However, recent studies in Côte d’Ivoire have focused mainly on long-term energy planning, generation mix, political economy of the power sector and the factors driving demand [<xref ref-type="bibr" rid="B9">9</xref>]-[<xref ref-type="bibr" rid="B12">12</xref>]. Other research has examined regional planning and the benefits of cross border electricity trade [<xref ref-type="bibr" rid="B4">4</xref>][<xref ref-type="bibr" rid="B5">5</xref>][<xref ref-type="bibr" rid="B13">13</xref>]. In contrast, few studies have examined how recent demand growth relates to actual availability of power facilities, changes in network losses, service quality, and reduction in the net export balance. </p>
      <p>Consequently, this research project makes three main contributions: First, it analyses together indicators of demand, supply, network performance, service continuity and electricity trade, which are generally examined separately. Second, it statistically verifies the observed trends using parametric and nonparametric methods suited to a small annual dataset. Third, it distinguishes early signs of system stress from a full probabilistic adequacy assessment, which requires hourly data and detailed outages records. The analysis is guided by three questions: Which trends were statistically significant between 2014 and 2025? Did imports continue to increase after controlling for the effect of time? Finally, how much electricity will be needed by 230 under annual growth rates of 5%, 6.5%, and 8%, with a 10% sensitivity case? The goal is to produce a transparent and reproducible assessment that can serve as a foundation for more detailed studies. </p>
    </sec>
    <sec id="sec2">
      <title>2. Conceptual Framework and Literature Review</title>
      <sec id="sec2dot1">
        <title>2.1. Security of Supply and Resource Adequacy</title>
        <p>Resource adequacy refers to a power system’s ability to meet demand using available production capacity, energy storage, electricity exchanges and other flexibility [<xref ref-type="bibr" rid="B14">14</xref>]. A high-level installed capacity alone does not guarantee adequacy. Forced outages, scheduled maintenance, fuel supply constraints, hydrological conditions, network limitations, and the availability of imports must also be considered. Modern approach therefore recommended using several indicators that measure the frequency, duration and severity of supply shortfalls rather than relying on a single reserve margin [<xref ref-type="bibr" rid="B14">14</xref>]-[<xref ref-type="bibr" rid="B16">16</xref>].</p>
        <p>Probabilistic indicators such as Loss of Load Expectation (LOLE), Loss of Load Probability (LOLP), and Expected Energy Not Served (EENS) remained the standard tools for assessing resource adequacy. However, calculating these indicators requires hourly demand data, unit level outage rates, maintenance schedules, hydrological profiles and electricity exchanges. When such data are unavailable, an annual analysis can identify potential supply risks but cannot provide a full probabilistic adequacy assessment.</p>
      </sec>
      <sec id="sec2dot2">
        <title>2.2. Electricity Demand Growth and Access</title>
        <p>Electricity consumption depends on household income, urbanization, industrialization, electricity prices, and access to the power grid. A study covering Côte d’Ivoire, Ghana, Nigeria, and Senegal confirm the importance of income and demographic factors in driving demand [<xref ref-type="bibr" rid="B11">11</xref>]. Prosumers should be considered in demand forecast, as their consumption patterns could significantly affect the future electricity needs of newly connected households [<xref ref-type="bibr" rid="B17">17</xref>].</p>
        <p>In Côte d’Ivoire, the Electricity for All Program (Programme Électricité Pour Tous: PEPT) has significantly accelerated access to the grid. The total number of customers increased from 1.32 million in 2014 to 5.28 million in 2025, including 2.72 million customers connected through the PEPT program [<xref ref-type="bibr" rid="B17">17</xref>]. While this represents major social progress, it also creates new obligation: ensuring a reliable electricity supply for these new customers.</p>
      </sec>
      <sec id="sec2dot3">
        <title>2.3. Power Interconnections and Regional Vulnerability</title>
        <p>Electric interconnections allow countries to share reserves, combine different energy resources and reduce costs. In West Africa, they offer considerable potential, particularly by combining the use of hydropower, thermal generation, and solar energy [<xref ref-type="bibr" rid="B3">3</xref>][<xref ref-type="bibr" rid="B4">4</xref>][<xref ref-type="bibr" rid="B18">18</xref>]. However, their effectiveness depends on the availability of transmission and distribution infrastructure, consistent electricity trading rules and generation surplus that can be mobilized [<xref ref-type="bibr" rid="B4">4</xref>][<xref ref-type="bibr" rid="B19">19</xref>][<xref ref-type="bibr" rid="B20">20</xref>]. An increase in imports may simply reflect efficient system operation. However, they become a warning sign when they occur alongside declining domestic generation availability, rapid growth in electricity demand and a sustained reduction in the net export balance.</p>
      </sec>
    </sec>
    <sec id="sec3">
      <title>3. Data and Methodology</title>
      <sec id="sec3dot1">
        <title>3.1. Data Source and Scope</title>
        <p><bold>Table 1</bold><bold>.</bold> Main variables used to analyze Côte d’Ivoire’s power system.</p>
        <table-wrap id="tbl1">
          <label>Table 1</label>
          <table>
            <tbody>
              <tr>
                <td>Dimension</td>
                <td>Variable</td>
                <td>Unit</td>
                <td>Period</td>
                <td>Purpose</td>
              </tr>
              <tr>
                <td>Demand</td>
                <td>Gross demand for electricity consumption</td>
                <td>GWh</td>
                <td>2014-2025</td>
                <td>Measure electricity demand</td>
              </tr>
              <tr>
                <td>Supply</td>
                <td>Net domestic generation</td>
                <td>GWh</td>
                <td>2014-2025</td>
                <td>Tracks change in domestic electricity supply</td>
              </tr>
              <tr>
                <td>Cacacity</td>
                <td>Thermal, hydropower and solar capacity</td>
                <td>MW</td>
                <td>2020-2025</td>
                <td>Describes the generation mix</td>
              </tr>
              <tr>
                <td>Availability</td>
                <td>Total plant availability</td>
                <td>%</td>
                <td>2020-2025</td>
                <td>Measure the capacity available for operation</td>
              </tr>
              <tr>
                <td>Electricity trade</td>
                <td>Imports and exports</td>
                <td>GWh</td>
                <td>2014-2025</td>
                <td>Assesses the country’s position in regional electricity trade</td>
              </tr>
              <tr>
                <td>Networks</td>
                <td>Transmission and distribution efficiency</td>
                <td>%</td>
                <td>2014-2025</td>
                <td>Evaluates network performance</td>
              </tr>
              <tr>
                <td>Service continuty</td>
                <td>Average outage duration (TMC), SAIDI, SAIFI and energy not supply (ENS)</td>
                <td>H, number and MWh</td>
                <td>Depending on data availability</td>
                <td>Assesses of service quality</td>
              </tr>
              <tr>
                <td>Access</td>
                <td>Custumers and PEPT beneficiaries</td>
                <td>Number</td>
                <td>2014-2025</td>
                <td>Measure the expansion of electricity access</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p>The complete annual data supplied by the Ivorian Electricity Company (CIE), including the units and definitions of all indicators used in this study is presented in the <bold>Appendix</bold>. it compiles technical, commercial, and financial indicators for the Ivorian electricity sector. The data source covers the period from 2014 to 2025. The variables include net domestic generation, gross domestic electricity consumption, transmission and distribution efficiency, average outage duration, energy not supplied and the numbers of customers. The dataset also contains installed capacity by generation and total plant availability. <bold>Table 1</bold> presents the main variables used to analyze changes in the Ivorian power system, together with their observation period and their role in the study.</p>
      </sec>
      <sec id="sec3dot2">
        <title>3.2. Calculated Indicators</title>
        <p>The average growth rate over a given period is measured using the compound annual growth rate (CAGR) as expressed in Equation (1).</p>
        <disp-formula id="FD1">
          <label>(1)</label>
          <mml:math>
            <mml:mrow>
              <mml:mtext>CAGR</mml:mtext>
              <mml:mo>=</mml:mo>
              <mml:mrow>
                <mml:mo>[</mml:mo>
                <mml:mrow>
                  <mml:msup>
                    <mml:mrow>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:mfrac>
                            <mml:mrow>
                              <mml:msub>
                                <mml:mi>X</mml:mi>
                                <mml:mi>f</mml:mi>
                              </mml:msub>
                            </mml:mrow>
                            <mml:mrow>
                              <mml:msub>
                                <mml:mi>X</mml:mi>
                                <mml:mi>i</mml:mi>
                              </mml:msub>
                            </mml:mrow>
                          </mml:mfrac>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:mrow>
                        <mml:mn>1</mml:mn>
                        <mml:mo>/</mml:mo>
                        <mml:mi>n</mml:mi>
                      </mml:mrow>
                    </mml:mrow>
                  </mml:msup>
                  <mml:mo>−</mml:mo>
                  <mml:mn>1</mml:mn>
                </mml:mrow>
                <mml:mo>]</mml:mo>
              </mml:mrow>
              <mml:mo>×</mml:mo>
              <mml:mn>100</mml:mn>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mi> i </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>and</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mi> f </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>are the initial and final values</italic>,<italic>respectively and</italic><inline-formula><mml:math><mml:mi> n </mml:mi></mml:math></inline-formula><italic>is the number of annual intervals</italic><italic>.</italic></p>
        <p>The net electricity trade balance is calculated using Equation (2)</p>
        <disp-formula id="FD2">
          <label>(2)</label>
          <mml:math>
            <mml:mrow>
              <mml:mi>N</mml:mi>
              <mml:mi>T</mml:mi>
              <mml:msub>
                <mml:mi>B</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mi>E</mml:mi>
              <mml:mi>x</mml:mi>
              <mml:mi>p</mml:mi>
              <mml:mi>o</mml:mi>
              <mml:mi>r</mml:mi>
              <mml:mi>t</mml:mi>
              <mml:msub>
                <mml:mi>s</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>−</mml:mo>
              <mml:mi>I</mml:mi>
              <mml:mi>m</mml:mi>
              <mml:mi>p</mml:mi>
              <mml:mi>o</mml:mi>
              <mml:mi>r</mml:mi>
              <mml:mi>t</mml:mi>
              <mml:msub>
                <mml:mi>s</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:mi> N </mml:mi><mml:mi> T </mml:mi><mml:msub><mml:mi> B </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the net electricity trade balance</italic>, <inline-formula><mml:math><mml:mrow><mml:mi> E </mml:mi><mml:mi> x </mml:mi><mml:mi> p </mml:mi><mml:mi> o </mml:mi><mml:mi> r </mml:mi><mml:mi> t </mml:mi><mml:msub><mml:mi> s </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the amount of electrici</italic><italic>ty exported</italic>, <inline-formula><mml:math><mml:mrow><mml:mi> I </mml:mi><mml:mi> m </mml:mi><mml:mi> p </mml:mi><mml:mi> o </mml:mi><mml:mi> r </mml:mi><mml:mi> t </mml:mi><mml:msub><mml:mi> s </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the amount of electricity imported and</italic><inline-formula><mml:math><mml:mi> t </mml:mi></mml:math></inline-formula><italic>represents the year under consideration</italic><italic>.</italic></p>
        <p>The annual import dependence rate is calculated relative gross domestic electricity consumption using Equation (3)</p>
        <disp-formula id="FD3">
          <label>(3)</label>
          <mml:math>
            <mml:mrow>
              <mml:mi>I</mml:mi>
              <mml:mi>D</mml:mi>
              <mml:msub>
                <mml:mi>R</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mrow>
                <mml:mo>(</mml:mo>
                <mml:mrow>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:mi>I</mml:mi>
                      <mml:mi>m</mml:mi>
                      <mml:mi>p</mml:mi>
                      <mml:mi>o</mml:mi>
                      <mml:mi>r</mml:mi>
                      <mml:mi>t</mml:mi>
                      <mml:msub>
                        <mml:mi>s</mml:mi>
                        <mml:mi>t</mml:mi>
                      </mml:msub>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:mi>D</mml:mi>
                      <mml:mi>o</mml:mi>
                      <mml:mi>m</mml:mi>
                      <mml:mi>e</mml:mi>
                      <mml:mi>s</mml:mi>
                      <mml:mi>t</mml:mi>
                      <mml:mi>i</mml:mi>
                      <mml:mi>c</mml:mi>
                      <mml:mtext>
                         
                      </mml:mtext>
                      <mml:mi>c</mml:mi>
                      <mml:mi>o</mml:mi>
                      <mml:mi>n</mml:mi>
                      <mml:mi>s</mml:mi>
                      <mml:mi>u</mml:mi>
                      <mml:mi>m</mml:mi>
                      <mml:mi>p</mml:mi>
                      <mml:mi>t</mml:mi>
                      <mml:mi>i</mml:mi>
                      <mml:mi>o</mml:mi>
                      <mml:msub>
                        <mml:mi>n</mml:mi>
                        <mml:mi>t</mml:mi>
                      </mml:msub>
                    </mml:mrow>
                  </mml:mfrac>
                </mml:mrow>
                <mml:mo>)</mml:mo>
              </mml:mrow>
              <mml:mo>×</mml:mo>
              <mml:mn>100</mml:mn>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:mi> I </mml:mi><mml:mi> D </mml:mi><mml:msub><mml:mi> R </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the import dependence rate</italic>, <inline-formula><mml:math><mml:mrow><mml:mi> I </mml:mi><mml:mi> m </mml:mi><mml:mi> p </mml:mi><mml:mi> o </mml:mi><mml:mi> r </mml:mi><mml:mi> t </mml:mi><mml:msub><mml:mi> s </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the amount of electricity imported</italic>, <inline-formula><mml:math><mml:mrow><mml:mi> D </mml:mi><mml:mi> o </mml:mi><mml:mi> m </mml:mi><mml:mi> e </mml:mi><mml:mi> s </mml:mi><mml:mi> t </mml:mi><mml:mi> i </mml:mi><mml:mi> c </mml:mi><mml:mtext>   </mml:mtext><mml:mi> c </mml:mi><mml:mi> o </mml:mi><mml:mi> n </mml:mi><mml:mi> s </mml:mi><mml:mi> u </mml:mi><mml:mi> m </mml:mi><mml:mi> p </mml:mi><mml:mi> t </mml:mi><mml:mi> i </mml:mi><mml:mi> o </mml:mi><mml:msub><mml:mi> n </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the gross domestic electricity consumption and</italic><inline-formula><mml:math><mml:mi> t </mml:mi></mml:math></inline-formula><italic>represents the year under consideration</italic><italic>.</italic></p>
        <p>Finally, the apparent losses associated with network efficiency are estimated using Equation (4)</p>
        <disp-formula id="FD4">
          <label>(4)</label>
          <mml:math>
            <mml:mrow>
              <mml:mi>L</mml:mi>
              <mml:mi>o</mml:mi>
              <mml:mi>s</mml:mi>
              <mml:mi>s</mml:mi>
              <mml:mi>e</mml:mi>
              <mml:msub>
                <mml:mi>s</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mn>100</mml:mn>
              <mml:mo>−</mml:mo>
              <mml:msub>
                <mml:mi>R</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:mi> L </mml:mi><mml:mi> o </mml:mi><mml:mi> s </mml:mi><mml:mi> s </mml:mi><mml:mi> e </mml:mi><mml:msub><mml:mi> s </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>represents the apparent network losses</italic>, <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> R </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the transmission or distribution network efficiency and</italic><inline-formula><mml:math><mml:mi> t </mml:mi></mml:math></inline-formula><italic>represents the year under consideration</italic>.</p>
        <p>These indicators are descriptive. The import dependence rate alone does not measure the risk of an electricity shortage, since imports may result from economic dispatch decisions. It should therefore be interpreted together with domestic generation availability and the net electricity trade balance.</p>
      </sec>
      <sec id="sec3dot3">
        <title>3.3. Statistical Analysis of Trends and Relationships</title>
        <p>Linear regression is used to estimate the average annual change in each indicator and how well the trend fits the data. The Mann-Kendall test and Sen’s slope are also applied to limit the influence of extreme values and avoid relying solely on the assumption of normally distributed data [<xref ref-type="bibr" rid="B21">21</xref>]-[<xref ref-type="bibr" rid="B23">23</xref>]. The significance level is set at 5%. </p>
        <p>The linear trend is estimated using Equation (5):</p>
        <disp-formula id="FD5">
          <label>(5)</label>
          <mml:math>
            <mml:mrow>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mi>α</mml:mi>
              <mml:mo>+</mml:mo>
              <mml:mi>β</mml:mi>
              <mml:mi>t</mml:mi>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>ε</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the value of indicator in year</italic><inline-formula><mml:math><mml:mi> t </mml:mi></mml:math></inline-formula> , <inline-formula><mml:math><mml:mi> α </mml:mi></mml:math></inline-formula><italic>is the intercept or estimated value of the indicator when</italic><inline-formula><mml:math><mml:mrow><mml:mi> t </mml:mi><mml:mo> = </mml:mo><mml:mn> 0 </mml:mn></mml:mrow></mml:math></inline-formula> , <inline-formula><mml:math><mml:mi> β </mml:mi></mml:math></inline-formula><italic>is the regression slope which represents the average annual change in indicator</italic>, <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> ε </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the error term which captures the variation not explained by the linear trend</italic><italic>.</italic></p>
        <p>Sen’s slope is calculated using Equation (6):</p>
        <disp-formula id="FD6">
          <label>(6)</label>
          <mml:math>
            <mml:mrow>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mrow>
                  <mml:mi>S</mml:mi>
                  <mml:mi>e</mml:mi>
                  <mml:mi>n</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mi>m</mml:mi>
              <mml:mi>e</mml:mi>
              <mml:mi>d</mml:mi>
              <mml:mi>i</mml:mi>
              <mml:mi>a</mml:mi>
              <mml:mi>n</mml:mi>
              <mml:mrow>
                <mml:mo>(</mml:mo>
                <mml:mrow>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>X</mml:mi>
                        <mml:mi>j</mml:mi>
                      </mml:msub>
                      <mml:mo>−</mml:mo>
                      <mml:msub>
                        <mml:mi>X</mml:mi>
                        <mml:mi>i</mml:mi>
                      </mml:msub>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:mi>j</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mi>i</mml:mi>
                    </mml:mrow>
                  </mml:mfrac>
                </mml:mrow>
                <mml:mo>)</mml:mo>
              </mml:mrow>
              <mml:mo>,</mml:mo>
              <mml:mtext>
                 
              </mml:mtext>
              <mml:mtext>
                 
              </mml:mtext>
              <mml:mi>j</mml:mi>
              <mml:mo>&gt;</mml:mo>
              <mml:mi>i</mml:mi>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> β </mml:mi><mml:mrow><mml:mi> S </mml:mi><mml:mi> e </mml:mi><mml:mi> n </mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the</italic><italic>Sen</italic><italic>’</italic><italic>s slope</italic>, <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mi> j </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>and</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mi> i </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>are the values at time</italic><inline-formula><mml:math><mml:mi> i </mml:mi></mml:math></inline-formula><italic>and</italic><inline-formula><mml:math><mml:mi> j </mml:mi></mml:math></inline-formula><italic>respectively.</italic></p>
        <p>Because the Mann-Kendall test assumes that successive observations are independent, each series was checked for fist-order correlation. The trend was first removed using Sen’s slope, as shown in Equation (7)</p>
        <disp-formula id="FD7">
          <label>(7)</label>
          <mml:math>
            <mml:mrow>
              <mml:msub>
                <mml:msup>
                  <mml:mi>X</mml:mi>
                  <mml:mo>′</mml:mo>
                </mml:msup>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>−</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mrow>
                  <mml:mi>S</mml:mi>
                  <mml:mi>e</mml:mi>
                  <mml:mi>n</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mi>t</mml:mi>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:msup><mml:mi> X </mml:mi><mml:mo> ′ </mml:mo></mml:msup><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the detrended value in year t</italic><italic>.</italic></p>
        <p>Lag-1 correlation was then calculated from the ranks of the detrended observations. Its significance was assessed using the approximate 95% limits given by Equation (8).</p>
        <disp-formula id="FD8">
          <label>(8)</label>
          <mml:math>
            <mml:mrow>
              <mml:msub>
                <mml:mi>r</mml:mi>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mo>,</mml:mo>
                  <mml:mi>c</mml:mi>
                  <mml:mi>r</mml:mi>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mo>±</mml:mo>
              <mml:mfrac>
                <mml:mrow>
                  <mml:mn>1.96</mml:mn>
                </mml:mrow>
                <mml:mrow>
                  <mml:msqrt>
                    <mml:mi>n</mml:mi>
                  </mml:msqrt>
                </mml:mrow>
              </mml:mfrac>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> r </mml:mi><mml:mrow><mml:mn> 1 </mml:mn><mml:mo> , </mml:mo><mml:mi> c </mml:mi><mml:mi> r </mml:mi><mml:mi> i </mml:mi><mml:mi> t </mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula><italic>represents the critical autocorrelation limits and n is the sample size</italic><italic>.</italic></p>
        <p>For the 12 annual observations used in this study, the limits were approximatively ±0.566. An autocorrelation coefficient outside these limits was considered statistically significant.</p>
        <p>When significant serial correlation was detected, the Hamed-Rao modified Mann-Kendall test was applied. This method adjusts the variance of the Mann-Kendall statistic using Equation (9):</p>
        <disp-formula id="FD9">
          <label>(9)</label>
          <mml:math>
            <mml:mrow>
              <mml:mi>V</mml:mi>
              <mml:mi>a</mml:mi>
              <mml:msup>
                <mml:mi>r</mml:mi>
                <mml:mo>*</mml:mo>
              </mml:msup>
              <mml:mrow>
                <mml:mo>(</mml:mo>
                <mml:mi>S</mml:mi>
                <mml:mo>)</mml:mo>
              </mml:mrow>
              <mml:mo>=</mml:mo>
              <mml:mi>V</mml:mi>
              <mml:mi>a</mml:mi>
              <mml:mi>r</mml:mi>
              <mml:mrow>
                <mml:mo>(</mml:mo>
                <mml:mi>S</mml:mi>
                <mml:mo>)</mml:mo>
              </mml:mrow>
              <mml:mrow>
                <mml:mo>[</mml:mo>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mo>+</mml:mo>
                  <mml:mfrac>
                    <mml:mn>2</mml:mn>
                    <mml:mrow>
                      <mml:mi>n</mml:mi>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:mi>n</mml:mi>
                          <mml:mo>−</mml:mo>
                          <mml:mn>1</mml:mn>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:mi>n</mml:mi>
                          <mml:mo>−</mml:mo>
                          <mml:mn>2</mml:mn>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                  </mml:mfrac>
                  <mml:munderover>
                    <mml:mstyle mathsize="140%" displaystyle="true">
                      <mml:mo>∑</mml:mo>
                    </mml:mstyle>
                    <mml:mrow>
                      <mml:mi>k</mml:mi>
                      <mml:mo>=</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                    <mml:mi>m</mml:mi>
                  </mml:munderover>
                  <mml:mrow>
                    <mml:mo>(</mml:mo>
                    <mml:mrow>
                      <mml:mi>n</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mi>k</mml:mi>
                    </mml:mrow>
                    <mml:mo>)</mml:mo>
                  </mml:mrow>
                  <mml:mrow>
                    <mml:mo>(</mml:mo>
                    <mml:mrow>
                      <mml:mi>n</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mi>k</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                    <mml:mo>)</mml:mo>
                  </mml:mrow>
                  <mml:mrow>
                    <mml:mo>(</mml:mo>
                    <mml:mrow>
                      <mml:mi>n</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mi>k</mml:mi>
                      <mml:mo>−</mml:mo>
                      <mml:mn>2</mml:mn>
                    </mml:mrow>
                    <mml:mo>)</mml:mo>
                  </mml:mrow>
                  <mml:msub>
                    <mml:mi>ρ</mml:mi>
                    <mml:mi>k</mml:mi>
                  </mml:msub>
                </mml:mrow>
                <mml:mo>]</mml:mo>
              </mml:mrow>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:mi> V </mml:mi><mml:mi> a </mml:mi><mml:msup><mml:mi> r </mml:mi><mml:mo> * </mml:mo></mml:msup><mml:mrow><mml:mo> ( </mml:mo><mml:mi> S </mml:mi><mml:mo> ) </mml:mo></mml:mrow></mml:mrow></mml:math></inline-formula><italic>is the corrected variance</italic>, <inline-formula><mml:math><mml:mrow><mml:mi> V </mml:mi><mml:mi> a </mml:mi><mml:mi> r </mml:mi><mml:mrow><mml:mo> ( </mml:mo><mml:mi> S </mml:mi><mml:mo> ) </mml:mo></mml:mrow></mml:mrow></mml:math></inline-formula><italic>is the original Mann-Kendall variance and</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> ρ </mml:mi><mml:mi> k </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the significant autocorrelation at lag k and m the maximum lag considered.</italic></p>
        <p>For the original Mann-Kendall test, exact two-sided p-values were used for series without tied observations. For series containing ties, the variance was adjusted for tied values and p-values were calculated using the normal approximation with continuity correction.</p>
        <p>Relationship between pairs of variables are measured using Pearson and Spearman correlations coefficients. Because two variables may appear strongly, partial correlation is also calculated after removing the linear effect of the year. These coefficients describe statistical associations and should not be interpreted as evidence causality. </p>
      </sec>
      <sec id="sec3dot4">
        <title>3.4. Development of the 2026-2030 Scenarios</title>
        <p>Three main demand scenarios are developed using 2025 as the base year. The moderate scenario assumes an annual growth rate of 5%, representing a slowdown in electricity demand. The trend scenario uses 6.5%, which is close to the arithmetic mean of the annual growth rates observed over the study period. The accelerated scenario assumes 8%, a rate consistent with the recent growth reported in the annual review. A 10% growth rate is included only as a high-growth sensitivity case.</p>
        <p>Electricity consumption for each year is projected using Equation (10)</p>
        <disp-formula id="FD10">
          <label>(10)</label>
          <mml:math>
            <mml:mrow>
              <mml:msub>
                <mml:mi>C</mml:mi>
                <mml:mi>t</mml:mi>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:msub>
                <mml:mi>C</mml:mi>
                <mml:mrow>
                  <mml:mn>2025</mml:mn>
                </mml:mrow>
              </mml:msub>
              <mml:msup>
                <mml:mrow>
                  <mml:mrow>
                    <mml:mo>(</mml:mo>
                    <mml:mrow>
                      <mml:mn>1</mml:mn>
                      <mml:mo>+</mml:mo>
                      <mml:mi>g</mml:mi>
                    </mml:mrow>
                    <mml:mo>)</mml:mo>
                  </mml:mrow>
                </mml:mrow>
                <mml:mrow>
                  <mml:mi>t</mml:mi>
                  <mml:mo>−</mml:mo>
                  <mml:mn>2025</mml:mn>
                </mml:mrow>
              </mml:msup>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p><italic>where</italic><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> C </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the projected electricity consumption in year t</italic>, <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> C </mml:mi><mml:mrow><mml:mn> 2025 </mml:mn></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula><italic>is the electricity consumption recorded in the base 2025</italic>, <inline-formula><mml:math><mml:mi> g </mml:mi></mml:math></inline-formula><italic>is the assumed annual growth rate</italic>.</p>
        <p>A linear extrapolation is also provided as a benchmark, together with a 95% prediction interval. The difference between the linear projection and the compound-growth scenarios reflects uncertainty related to the choice of the mathematical model. In other words, the results depend on whether future demand is assumed to increase by a constant amount of energy each year or by a constant annual percentage.</p>
      </sec>
      <sec id="sec3dot5">
        <title>3.5. Validation Checks and Methodological Limitations</title>
        <p>Since only 12 annual observations were available, ARIMA modeling was not considered reliable. The lack of hourly load, generation, outages, hydrology, and electricity trade data also prevented a probabilistic adequacy assessment using indicators such as LOLE and EENS [<xref ref-type="bibr" rid="B14">14</xref>][<xref ref-type="bibr" rid="B24">24</xref>]-[<xref ref-type="bibr" rid="B26">26</xref>].</p>
      </sec>
    </sec>
    <sec id="sec4">
      <title>4. Results and Discussion</title>
      <sec id="sec4dot1">
        <title>4.1. Demand Is Growing Faster than Domestic Generation</title>
        <p>Gross domestic electricity consumption nearly doubled between 2014 and 2025, rising from 7333 to 14,635 GWh, with a compound annual growth rate (CAGR) of 6.48%. On the same period, net domestic generation increased from 8166 to 14,563 GWh, corresponding to a CAGR of 5.40%. As shown in <xref ref-type="fig" rid="fig1">Figure 1</xref>, gross demand grew slightly faster than generation, gradually reducing the margin between domestic supply and consumption.</p>
        <p>The number of customers quadrupled from 1.32 million to 5.28 million, with a CAGR of 13.47%. This suggests that many new customers are still consuming relatively little electricity. However, demand could continue to rise as households acquire more electrical appliances and productive uses expand. <bold>Table 2</bold> summarizes these changes, including the strong growth in consumption, customers number, and imports between 2014 and 2025. Gross domestic consumption and net domestic production are based on different accounting scopes. Gross domestic consumption is calculated based on gross production before deducting auxiliary consumption by power plants, whereas net production excludes this internal use.</p>
        <p><bold>Table 2</bold><bold>.</bold> Trends in the main ındicators of Côte d’Ivoire’s power system, 2014-2025.</p>
        <table-wrap id="tbl2">
          <label>Table 2</label>
          <table>
            <tbody>
              <tr>
                <td>Indicator</td>
                <td>2014</td>
                <td>2020</td>
                <td>2024</td>
                <td>2025</td>
                <td>Main change</td>
              </tr>
              <tr>
                <td>Net domestic generation (GWh)</td>
                <td>8166</td>
                <td>11,031</td>
                <td>13,733</td>
                <td>14,563</td>
                <td>+72% since 2014</td>
              </tr>
              <tr>
                <td>Gross Domestic electricity consumption (GWh)</td>
                <td>7333</td>
                <td>10,029</td>
                <td>13,572</td>
                <td>14,635</td>
                <td>+99.6% since 2014</td>
              </tr>
              <tr>
                <td>Customers (millions)</td>
                <td>1.32</td>
                <td>2.92</td>
                <td>4.59</td>
                <td>5.28</td>
                <td>4 times since 2014</td>
              </tr>
              <tr>
                <td>Electricity exports (GWh)</td>
                <td>902</td>
                <td>1333</td>
                <td>730</td>
                <td>797</td>
                <td>−11.6% since 2014</td>
              </tr>
              <tr>
                <td>Electricity imports (GWh)</td>
                <td>20</td>
                <td>149</td>
                <td>382</td>
                <td>708</td>
                <td>35.4 times since 2014</td>
              </tr>
              <tr>
                <td>Network efficiency (%)</td>
                <td>78.59</td>
                <td>82.54</td>
                <td>84.56</td>
                <td>84.54</td>
                <td>+7.57 percentage points</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
      </sec>
      <sec id="sec4dot2">
        <title>4.2. Statistical Significance of the Trends</title>
        <p>As shown in <xref ref-type="fig" rid="fig2">Figure 2</xref> and <bold>Table 3</bold>, electricity consumption increased steadily between 2014 and 2025. The linear trend explains 95% of its annual variation (<inline-formula><mml:math><mml:mrow><mml:msup><mml:mi> R </mml:mi><mml:mn> 2 </mml:mn></mml:msup><mml:mo> = </mml:mo><mml:mn> 0.956 </mml:mn></mml:mrow></mml:math></inline-formula> ). Significant serial dependence was detected after removing the trend (<inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> r </mml:mi><mml:mn> 1 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mn> 0.698 </mml:mn></mml:mrow></mml:math></inline-formula> ). However, the increase remained statistically significant after the Hamed Rao correction (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.001 </mml:mn></mml:mrow></mml:math></inline-formula> ). Sen’s Slope indicates that consumption increased by approximately 625 GWh per year.</p>
        <fig id="fig1">
          <label>Figure 1</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId107.svg?20261105010619" />
          <caption>
            <p>Trends in net domestic generation and domestic electricity consumption, 2014-2025.</p>
          </caption>
        </fig>
        <p>Domestic generation also increased significantly by approximately 555 GWh per year. No significant serial dependance was found in this series (<inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> r </mml:mi><mml:mn> 1 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mn> 0.698 </mml:mn></mml:mrow></mml:math></inline-formula> ) and its adjusted p-value remained below 0.001. Because consumption increased faster than domestic generation, the margin between national supply and demand gradually narrowed.</p>
        <p><bold>Table 3</bold><bold>.</bold> Trend analysis results for the main ındicators of Côte d’Ivoire’s power system, 2014-2025.</p>
        <table-wrap id="tbl3">
          <label>Table 3</label>
          <table>
            <tbody>
              <tr>
                <td>Variable</td>
                <td>OLS slope/Year</td>
                <td>
                  <italic>R</italic>
                  <sup>2</sup>
                </td>
                <td>
                  Kendall’s
                  <italic>τ</italic>
                </td>
                <td>
                  Original
                  <italic>p</italic>
                  <italic>
                    <sub>MK</sub>
                  </italic>
                </td>
                <td>
                  Detrended
                  <italic>r</italic>
                  <sub>1</sub>
                </td>
                <td>
                  Hamed-Rao
                  <italic>p</italic>
                </td>
                <td>Sen’s Slope/Year</td>
                <td>Sen’s 95% CI</td>
              </tr>
              <tr>
                <td>Electricity consumption</td>
                <td>632.4</td>
                <td>0.956</td>
                <td>1.000</td>
                <td>&lt;0.001</td>
                <td>0.638</td>
                <td>0.001</td>
                <td>625.2</td>
                <td>[494.8, 725.0]</td>
              </tr>
              <tr>
                <td>Domestic generation</td>
                <td>543.1</td>
                <td>0.956</td>
                <td>0.939</td>
                <td>&lt;0.001</td>
                <td>0.397</td>
                <td>&lt;0.001</td>
                <td>555.2</td>
                <td>[455.0, 658.4]</td>
              </tr>
              <tr>
                <td>Electricity imports</td>
                <td>50.2</td>
                <td>0774</td>
                <td>0.879</td>
                <td>&lt;0.001</td>
                <td>0.297</td>
                <td>&lt;0.001</td>
                <td>40.9</td>
                <td>[30.0, 59.0]</td>
              </tr>
              <tr>
                <td>Net trade balance</td>
                <td>−80.8</td>
                <td>0.487</td>
                <td>−0.515</td>
                <td>0.021</td>
                <td>0.082</td>
                <td>0.024</td>
                <td>−101.4</td>
                <td>[−157.0, −14.0]</td>
              </tr>
              <tr>
                <td>Numbers of costumers</td>
                <td>353990.9</td>
                <td>0.972</td>
                <td>1.000</td>
                <td>&lt;0.001</td>
                <td>0.324</td>
                <td>0.001</td>
                <td>351661.2</td>
                <td>[303698.2, 384950.4}</td>
              </tr>
              <tr>
                <td>Distribution efficiency</td>
                <td>0.8</td>
                <td>0.872</td>
                <td>0.779</td>
                <td>&lt;0.001</td>
                <td>0.184</td>
                <td>&lt;0.001</td>
                <td>0.8</td>
                <td>[0.6, 1.0]</td>
              </tr>
              <tr>
                <td>Average outage duration</td>
                <td>−1.3</td>
                <td>0.295</td>
                <td>−0.321</td>
                <td>0.149</td>
                <td>0.617</td>
                <td>0.322</td>
                <td>−1.5</td>
                <td>[−3.0, 0.3]</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <fig id="fig2">
          <label>Figure 2</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId110.jpeg?20261105010619" />
        </fig>
        <p><bold>Figure 2</bold><bold>.</bold> Statistical trends in electricity consumption, imports, net trade balance, and customer numbers, 2014-2025.</p>
        <p>The number of customers rose from 1.32 million in 2014 to 5.28 million in 2025 and remained on a significant upward trend after correction (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.001 </mml:mn></mml:mrow></mml:math></inline-formula> ).</p>
        <p>Electricity imports, increasing by approximately 41 GWh per year (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> &lt; </mml:mo><mml:mn> 0.001 </mml:mn></mml:mrow></mml:math></inline-formula> ), while the net trade balance declined by approximately 101 GWh annually (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.024 </mml:mn></mml:mrow></mml:math></inline-formula> ). Côte d’Ivoire remained a net exporter of electricity, but the gap between exports and imports gradually narrowed.</p>
        <p>Distribution efficiency improved by about 0.8 percentage point per year over the full period (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> &lt; </mml:mo><mml:mn> 0.001 </mml:mn></mml:mrow></mml:math></inline-formula> ), despite a slight decline after 2022. Average outage duration also decreased, but this trend was not statistically significant after correction (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.322 </mml:mn></mml:mrow></mml:math></inline-formula> ).</p>
      </sec>
      <sec id="sec4dot3">
        <title>4.3. Relationships among Demand, Imports, and the Net Trade Balance</title>
        <p>As shown in <xref ref-type="fig" rid="fig3">Figure 3</xref>, electricity consumption, domestic generation, imports and customers numbers generally increased together between 2014 and 2025. The particularly strong correlation between consumption and costumer growth reflects the effect of expanded electricity access on domestic demand. Domestic generation also increased with consumption, but at a slightly slower rate, which gradually reduced the margin between supply and demand.</p>
        <p>Electricity consumption showed a strong correlation with imports (Pearson, <inline-formula><mml:math><mml:mrow><mml:mi> r </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.939 </mml:mn></mml:mrow></mml:math></inline-formula> , <inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> &lt; </mml:mo><mml:mn> 0.001 </mml:mn></mml:mrow></mml:math></inline-formula> ); Spearman (<inline-formula><mml:math><mml:mrow><mml:mi> ρ </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.965 </mml:mn></mml:mrow></mml:math></inline-formula> ). This relationship remained positive and statistically significant after controlling for the common time trend (partial <inline-formula><mml:math><mml:mrow><mml:mi> r </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.782 </mml:mn></mml:mrow></mml:math></inline-formula> , <inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.0044 </mml:mn></mml:mrow></mml:math></inline-formula> ). Thus, years with unusually high consumption were generally associated with higher electricity imports. This finding highlights the growing role of regional trade in meeting domestic demand. However, imports also depend on the availability of production capacity, hydrological conditions, gas supplies, and regional electricity prices.</p>
        <p>The net trade balance showed a negative correlation with both consumption and imports. After controlling for the time effect, the relationship between consumption and the net balance remained negative but was not statistically significant (partial <inline-formula><mml:math><mml:mrow><mml:mi> r </mml:mi><mml:mo> = </mml:mo><mml:mo> − </mml:mo><mml:mn> 0.545 </mml:mn></mml:mrow></mml:math></inline-formula> , <inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.083 </mml:mn></mml:mrow></mml:math></inline-formula> ). In contrast, the relationship between imports and the net balance remained significant (partial <inline-formula><mml:math><mml:mrow><mml:mi> r </mml:mi><mml:mo> = </mml:mo><mml:mo> − </mml:mo><mml:mn> 0.678 </mml:mn></mml:mrow></mml:math></inline-formula> , <inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.022 </mml:mn></mml:mrow></mml:math></inline-formula> ). However, this result should be interpreted with caution, because the net trade balance is defined as exports minus imports. The negative association with imports is therefore partly mechanical and does not establish a causal link.</p>
        <p>Distribution losses, expressed as a percentage, generally decreased as consumption, generation, imports, and customer numbers increased, reflecting improvement in network performance over much of the period. However, the slight decline in distribution efficiency observed after 2022 suggests that this improvement has not continued consistently in recent years. The average duration of outages showed only a weak to moderate correlation with the other indicators, confirming that service interruptions also depend on equipment failures, maintenance, network configuration, and the effectiveness of restoration efforts.</p>
        <fig id="fig3">
          <label>Figure 3</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId139.jpeg?20261105010619" />
        </fig>
        <p><bold>Figure 3</bold><bold>.</bold> Spearman correlation matrix for the main indicators of Côte d’Ivoire’s power system, 2014-2025.</p>
      </sec>
      <sec id="sec4dot4">
        <title>4.4. Rising Installed Capacity but Declining Availability</title>
        <p>As shown in <xref ref-type="fig" rid="fig4">Figure 4</xref> and <bold>Table 4</bold>, Côte d’Ivoire’s installed generation capacity increased from 2229 MW in 2020 to 3224 MW in 2025, a gain of 995 MW, or 44.6%. This expansion was driven mainly by thermal power generation, which rose from 1350 to 2166 MW following the commissioning of new units, the expansion of the Atinkou power plant, and additional Aggreko capacity. Hydropower increased more modestly from 879 to 991 MW, while solar entered the generation mix in 2023 and reached 67 MW in 2025, supports by the Boundiali solar power plant.</p>
        <p>In 2025, thermal plants accounted for 67.2% of installed capacity, compared with 30.7% for hydropower and 2.1% for solar power. Although thermal generation offers adjustable capacity, this structure makes the power grid vulnerable to constraints on natural gas supply, fuel costs, and power plant outages.</p>
        <p>Despite the expansion of the generation fleet, the total availability of power plants fell from 98% in 2021 to 79% in 2025. A simplified estimate based on multiplying installed capacity by the annual availability rate gives an indicative value available capacity decreased approximately from 2645 MW in 2023 to 2547 MW in 2025, even as nominal capacity increased by 317 MW. This simplified calculation does not constitute an estimate of available capacity during peak periods, as annual availability does not take into account the timing or simultaneous occurrence of power plant outages. It simply illustrates how lower availability can reduce the expected benefits of new generation capacity.</p>
        <p>Aging hydropower facilities, prolonged outages, maintenance needs, gas supply constraints, and the unavailability of thermal power plants may explain this deterioration. These findings show that creating new capacity alone is not enough to guarantee supply security. Refurbishing existing assets, shorter outage periods, effective maintenance, and reliable fuel supply are equally important. System adequacy should therefore be assessed using the capacity that can be delivered during peak demand rather than on installed capacity alone.</p>
        <p><bold>Table 4</bold><bold>.</bold> Installed capacity by generation technology and total plant availability, 2020-2025.</p>
        <table-wrap id="tbl4">
          <label>Table 4</label>
          <table>
            <tbody>
              <tr>
                <td>Year</td>
                <td>Thermal (MW)</td>
                <td>Hydropower (MW)</td>
                <td>Solar (MW)</td>
                <td>Total (MW)</td>
                <td>Plant availability (%)</td>
              </tr>
              <tr>
                <td>2020</td>
                <td>1350</td>
                <td>879</td>
                <td>0</td>
                <td>2229</td>
                <td>86</td>
              </tr>
              <tr>
                <td>2021</td>
                <td>1390</td>
                <td>879</td>
                <td>0</td>
                <td>2269</td>
                <td>98</td>
              </tr>
              <tr>
                <td>2022</td>
                <td>1669</td>
                <td>879</td>
                <td>0</td>
                <td>2548</td>
                <td>95</td>
              </tr>
              <tr>
                <td>2023</td>
                <td>1998</td>
                <td>879</td>
                <td>30</td>
                <td>2907</td>
                <td>91</td>
              </tr>
              <tr>
                <td>2024</td>
                <td>1998</td>
                <td>991</td>
                <td>30</td>
                <td>3019</td>
                <td>81</td>
              </tr>
              <tr>
                <td>2025</td>
                <td>2166</td>
                <td>991</td>
                <td>67</td>
                <td>3224</td>
                <td>79</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <fig id="fig4">
          <label>Figure 4</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId140.svg?20261105010619" />
          <caption>
            <p><bold>Figure</bold><bold>4</bold><bold>.</bold> Installed generation capacity by technology and total plant availability, 2020-2025.</p>
          </caption>
        </fig>
      </sec>
      <sec id="sec4dot5">
        <title>4.5. Declining Net Exports</title>
        <p>As shown in <xref ref-type="fig" rid="fig5">Figure 5</xref>, Côte d’Ivoire’s cross-border electricity trade changed significantly between 2014 and 2025. Exports peaked at 1655 GWh in 2016 and remained relatively high through 2020, when they reached 1333 GWh. They then declined to 730 GWh in 2024 before recovering slightly to 797 GWh in 2025.</p>
        <p>Imports followed the opposite pattern. After remaining below 100 GWh per year through 2019, they rose from 149 GWh in 2020 to 267 GWh in 2022, 382 GWh in 2024, and finally to 708 GWh in 2025, an increase of nearly 4.8 times over five years. Although these purchases represented only 4.84% of domestic electricity consumption in 2025, their rapid growth is an important signal of supply security.</p>
        <p>Consequently, the net trade balance fell from 1184 GWh in 2020 to 706 GWh in 2022, 348 GWh in 2024 and only 90 GWh in 2025. Côte d’Ivoire therefore remained a net exporter, but with a very narrow margin. Imports accounted for nearly 89% of exports in 2025, compared with just 11% in 2020.</p>
        <p>Regional interconnections offer valuable flexibility by supplying electricity during power plant outages, peak demand periods, or when lower-cost energy is available from neighboring countries. However, the simultaneous increase in imports, the decline in the export surplus, reduction in domestic plant availability and sustained demand growth suggest that the grid’s internal margins are tightening. If this trend continues, Côte d’Ivoire could temporarily become a net importer during years of high consumption or in the event of major production constraints.</p>
        <fig id="fig5">
          <label>Figure 5</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId141.svg?20261105010620" />
          <caption>
            <p>Trends in electricity exports, imports, and the net trade balance, 2014-2025.</p>
          </caption>
        </fig>
        <p>As shown in <xref ref-type="fig" rid="fig6">Figure 6</xref>, plant availability and electricity imports generally moved in opposite directions between 2020 and 2025. The Pearson correlation was moderately strong and negative (<inline-formula><mml:math><mml:mrow><mml:mi> r </mml:mi><mml:mo> = </mml:mo><mml:mo> − </mml:mo><mml:mn> 0.695 </mml:mn></mml:mrow></mml:math></inline-formula> ), indicating that lower availability tended to coincide with greater reliance on external supply. For example, imports totaled approximately 195 GWh when availability reached 98% in 2021 but increased to 382 GWh in 2024 and 708 GWh in 2025 as availability fell to 81% and 79%, respectively. However, this relationship was not statistically significant at the 5% level (<inline-formula><mml:math><mml:mrow><mml:mi> p </mml:mi><mml:mo> = </mml:mo><mml:mn> 0.125 </mml:mn></mml:mrow></mml:math></inline-formula> ), largely because the analysis covered only six annual observations. The result should therefore be viewed as a preliminary signal rather than solid evidence of a systematic relationship. The data also reveal some variability: availability was relatively low in 2020, at 86%, but imports nevertheless remained limited to 149 GWh. In addition, the sharp rise recorded in 2025 likely had a strong influence on the estimated correlation.</p>
        <p>From an operational perspective, electricity purchases can compensate for unavailability of domestic generation when local resources are insufficient to fully meet demand. Nevertheless, their level also depends on consumption growth, regional electricity prices, the generation capacity of neighboring countries, interconnection constraints, and grid operation strategies. An increase in imports cannot therefore be attributed solely to declining plant availability. </p>
        <p>A more reliable assessment would require monthly, daily, or hourly data. Such information would help determine whether imports increase during generating unit outages or peak demand periods while accounting for domestic production, market prices, and contractual exchanges.</p>
        <fig id="fig6">
          <label>Figure 6</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId146.svg?20261105010620" />
          <caption>
            <p>Relationship between total plant availability and electricity imports, 2020-2025.</p>
          </caption>
        </fig>
      </sec>
      <sec id="sec4dot6">
        <title>4.6. Recent Reliability but Persistent Network Losses</title>
        <p>As shown in <xref ref-type="fig" rid="fig7">Figure 7</xref>, transmission losses remained relatively low and stable, generally ranging between 5% and 8%. In 2025, they fell to 5%, corresponding to a transmission efficiency of 95%, the highest level recorded since 2019. </p>
        <p>Distribution performance improved significantly between 2014 and 2022, with efficiency rising from 82.4% to 91.3% and losses decreasing from 17.6% to 8.7%. However, this progress subsequently slowed: efficiency fell to 89.38% in 2025, while losses increased to 10.62%. This recent deterioration could be attributed to rapid network expansion, customer growth, overloaded feeders, the length of distribution lines, load imbalance, aging equipment and non-technical losses. The available data does not allow the contribution of each factor to be measured separately. </p>
        <p><bold>Table 5</bold> shows that the network’s overall efficiency remained nearly unchanged at 84.54% in 2025, meaning that approximately 15.5% of available energy did not reach end users. Improved transmission performance largely offset lower distribution efficiency, showing that loss-reduction efforts should focus on this part of the network. </p>
        <p>Service reliability improved in 2025 compared with 2024, but the available data do not establish a statistically significant long-term trend (p = 0.322). The average duration of outages fell from 26.2 hours in 2024 to 18.6 hours, a reduction of approximately 29%. During the same period, the SAIDI fell from 17.6 to 10 hours, while the SAIFI decreased from 22 to 18 interruptions. Energy not supplied also dropped 22.5%, from 37,723 to 29,227 MWh. Nevertheless, these values remain above their 2020 levels; therefore, several additional years of data are needed to confirm lasting improvement. </p>
        <p>Approximately 59% of the energy not supplied in 2025 was associated with the medium-voltage network. Reinforcing heavily loaded feeders, automating switching operations, improving fault location, strengthening preventive maintenance, and clearing vegetation near power lines could therefore reduce outages duration and accelerate service restoration.</p>
        <p>Finally, year-to-year comparisons should be interpreted with caution. The average duration of outages, the SAIDI and SAIFI indices, and energy not supplied values are fully comparable only when calculated for the same service area and according to consistent rules for counting customers and interruptions [<xref ref-type="bibr" rid="B27">27</xref>]. The 2025 results indicate significant short-term progress, but a longer and methodically consistent dataset is required to establish a sustained trend.</p>
        <fig id="fig7">
          <label>Figure 7</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId147.jpeg?20261105010620" />
        </fig>
        <p><bold>Figure 7</bold><bold>.</bold> Trends in network losses and average outage duration, 2014-2025.</p>
        <p><bold>Table 5</bold><bold>.</bold> Network efficiency and service reliability ındicators, 2020-2025.</p>
        <table-wrap id="tbl5">
          <label>Table 5</label>
          <table>
            <tbody>
              <tr>
                <td>Indicator</td>
                <td>2020</td>
                <td>2022</td>
                <td>2023</td>
                <td>2024</td>
                <td>2025</td>
              </tr>
              <tr>
                <td>Transmission efficiency (%)</td>
                <td>94.6</td>
                <td>94</td>
                <td>93.9</td>
                <td>94.4</td>
                <td>95.0</td>
              </tr>
              <tr>
                <td>Distribution efficiency (%)</td>
                <td>87.0</td>
                <td>91.3</td>
                <td>91.1</td>
                <td>90.3</td>
                <td>89.38</td>
              </tr>
              <tr>
                <td>Overall system efficiency (%)</td>
                <td>82.54</td>
                <td>85.02</td>
                <td>84.99</td>
                <td>84.56</td>
                <td>84.54</td>
              </tr>
              <tr>
                <td>Average outation duration (hours)</td>
                <td>16.4</td>
                <td>28.9</td>
                <td>29.4</td>
                <td>26.2</td>
                <td>18.6</td>
              </tr>
              <tr>
                <td>Total energy not supplied (MWh)</td>
                <td>17,231</td>
                <td>34,820</td>
                <td>38,828</td>
                <td>37,723</td>
                <td>29,227</td>
              </tr>
              <tr>
                <td>SAIDI (hours)</td>
                <td>10.8</td>
                <td>19.06</td>
                <td>19.5</td>
                <td>17.6</td>
                <td>10</td>
              </tr>
              <tr>
                <td>SAIFI (number of interruptions)</td>
                <td>20</td>
                <td>23</td>
                <td>22</td>
                <td>22</td>
                <td>18</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
      </sec>
      <sec id="sec4dot7">
        <title>4.7. Electricity Demand Scenarios to 2030</title>
        <p><xref ref-type="fig" rid="fig8">Figure 8</xref> and <bold>T</bold><bold>able 6</bold> present historical domestic electricity consumption through 2025 and three possible growth scenarios for 2026-2030. Demand increases under every scenario, while the gap between projections becomes larger over time.</p>
        <p>In the moderate scenario, consumption grows by 5% per year and reaches 18,678 GWh in 2030, 4043 GWh or 27.6% above the 2025 level. The trend scenario extends the historical average growth rate of 6.5%, resulting in 20,051 GW, a 37% increase. This trajectory may serve as a reference to planning if customer connections, household electricity use, industrial activity and electrification continue to develop at rates like those observed recently.</p>
        <p>The accelerated scenario assumes 8% annual growth and brings demand to 21,504 GWh by 2030, nearly 47% higher than in 2025. Such a trajectory could result from faster industrialization, the expansion of mining, wider electrification, or higher consumption among newly connected households. A 10% sensitivity case produces 23,570 GWh, representing an increase of more than 61%. Although this is not considered a central projection, it provides a useful stress case for assessing system resilience under stronger growth.</p>
        <p>The difference between the moderate and accelerated scenarios increases from 439 GWh in 2026 to 2826 GWh in 2030. Including the high-growth sensitivity case increases the gap to 4892 GWh at the end of the projection period. This uncertainty underscores the need for flexible decision-making regarding generation, network expansion, and energy procurement. </p>
        <p>A linear extrapolation gives a lower 2030 estimate of 16,944 GWh, with a 95% prediction interval of 15,379 to 18,510 GWh. This value is 3107 GWh below the 6.5% trend scenario. This difference reflects the modeling approach: the linear model adds an approximately constant amount each year, whereas compound growth applies a fixed percentage to an increasingly larger consumption base.</p>
        <p>These results should be interpreted as planning scenarios rather than precise forecasts. Economic conditions, energy efficiency, electricity prices, industrial projects, air conditioning use, electric mobility, and production activities could affect future demand. Moreover, the values represent annual energy requirements, not the additional generation capacity needed. System planning must also account for network losses, plant auxiliary consumption, outages, regional exchanges, peak demand, load profile, and reserve margins.</p>
        <p><bold>Table 6</bold><bold>.</bold> Projected electricity consumption by scenario, 2026-2030 (GWh).</p>
        <table-wrap id="tbl6">
          <label>Table 6</label>
          <table>
            <tbody>
              <tr>
                <td>Year</td>
                <td>Moderate scenario (5%)</td>
                <td>Trend scenario (6.5%)</td>
                <td>Accelerate scenario (8%)</td>
                <td>Sensitivity scenario (10%)</td>
              </tr>
              <tr>
                <td>2026</td>
                <td>15,367</td>
                <td>15,586</td>
                <td>15,806</td>
                <td>16,099</td>
              </tr>
              <tr>
                <td>2027</td>
                <td>16,135</td>
                <td>16,599</td>
                <td>17,070</td>
                <td>17,708</td>
              </tr>
              <tr>
                <td>2028</td>
                <td>16,942</td>
                <td>17,678</td>
                <td>18,436</td>
                <td>19,479</td>
              </tr>
              <tr>
                <td>2029</td>
                <td>17,789</td>
                <td>18,827</td>
                <td>19,911</td>
                <td>21,427</td>
              </tr>
              <tr>
                <td>2030</td>
                <td>18,678</td>
                <td>20,051</td>
                <td>21,504</td>
                <td>23,570</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <fig id="fig8">
          <label>Figure 8</label>
          <graphic xlink:href="https://html.scirp.org/file/6203150-rId148.svg?20261105010620" />
          <caption>
            <p>Historical electricity consumption and demand scenarios to 2030.</p>
          </caption>
        </fig>
      </sec>
    </sec>
    <sec id="sec5">
      <title>5. Discussion</title>
      <sec id="sec5dot1">
        <title>5.1. The Main Risk Is the Gap between Installed and Available Capacity</title>
        <p>The first major finding is that an increase in installed capacity does not necessarily an equivalent improvement in security of supply. Between 2020 and 2025, Côte d’Ivoire added nearly 1000 MW of generation capacity, while the total plant availability decline by seven percentage points. A generation unit that is out of service, constrained by fuel shortages or affect by network limitations contributes little or nothing to meeting demand. Modern methods for assessing resource adequacy therefore consider outages, weather conditions, energy constraints, and the actual availability of interconnections, rather than relying solely on nominal capacity [<xref ref-type="bibr" rid="B14">14</xref>][<xref ref-type="bibr" rid="B15">15</xref>].</p>
        <p>Côte d’Ivoire should combine investments in new energy sources with better use of its existing infrastructure. Rehabilitating aging hydropower facilities, reducing thermal plants outages, securing natural gas supplies, and improving maintenance coordination could deliver benefits more quickly than building another large power plant.</p>
      </sec>
      <sec id="sec5dot2">
        <title>5.2. Diversification Is Progressing but Remains Limited</title>
        <p>Solar generation doubled in 2025 but still accounted for only 1% of net national generation and about 2% of installed capacity. Thermal plants remained dominant, supplying 73% of the country’s electricity. Although these facilities offer dispatchable output, their importance increases vulnerability to natural gas supply constraints and fuel price volatility. Hydropower offers a flexible domestic resource, but its contribution depends on hydrological conditions and plant availability.</p>
        <p>Long-term studies suggest that Côte d’Ivoire can expand its solar photovoltaic generation while continuing to pursue its economic and climate goals [<xref ref-type="bibr" rid="B7">7</xref>]. Better coordination and electricity exchanges within the West African Power Pool could also support the integration of variable renewable energy [<xref ref-type="bibr" rid="B5">5</xref>]-[<xref ref-type="bibr" rid="B8">8</xref>]. However, further diversification will require flexible reserves, economically justified storage, better weather forecasting, modernized distribution systems, and stronger transmission infrastructure. In practice, the contribution of solar capacity supply security depends not only on its nominal rating but also on its location and production profile.</p>
      </sec>
      <sec id="sec5dot3">
        <title>5.3. Distribution Loss Reduction as a Hidden Resource</title>
        <p>Reducing distribution losses provides an indirect but immediately available source of energy. Every percentage point avoided represents electricity that no longer needs to be generated, imported, or transmitted. With annual consumption above 14 TWh, a one-point improvement could save more than 140 GWh, depending on the parameters of the calculation. The decline in distribution efficiency observed since 2022 therefore requires a detailed assessment to distinguish between technical losses and non-technical causes, such as unauthorized connections, metering errors, and billing issues.</p>
        <p>Technical measures may include upgrading overloaded conductors, improving phase balance, locating transformers closer to load centers, and installing reactive power compensation devices. Commercial actions should focus on detecting irregular connections, improving metering accuracy and deploying smart meters in priority areas.</p>
        <p>These measures should be guided by detailed loss mapping at substations, transformers and medium- or low-voltage feeder level. This approach would focus investments on areas with the greatest energy and financial benefits and make it easier to track long-term results. In many cases, reducing losses can generate equivalent energy savings more quickly and at a lower cost than building new generation capacity.</p>
      </sec>
      <sec id="sec5dot4">
        <title>5.4. Interconnections Should Remain a Source of Flexibility</title>
        <p>The sharp increase in imports in 2025 could be explained by the normal use of regional interconnections to address temporary supply constraints. It demonstrates the practical value of the West African Power Pool (WAPP) in supplementing domestic generation, reducing the risk of shortages, and providing access to lower-cost electricity. Regional power exchanges can therefore help balance the system without requiring immediate investment in new capacity.</p>
        <p>However, total import capacity cannot be considered permanently available. Its contribution depends on surplus generation in neighboring countries, interconnections availability, and transmission constraints along regional corridors. Dry conditions, peak demand, or major equipment failures can affect several countries simultaneously, reducing their ability to support one another. </p>
        <p>System planning must therefore consider at least two operating conditions: a normal interconnection scenario, in which imports are available within contractual and technical limits and a stress scenario in which regional exchanges are partially or completely unavailable. Intermediate cases could include the loss of a major interconnection or simultaneous generation shortages in several countries. </p>
        <p>This approach would provide a more realistic estimate of how regional trade contributes to security of supply and would help determine the export volumes that Côte d’Ivoire can maintain without compromising domestic demand. Interconnections should complement sufficient and reliable domestic production rather than permanently replace it.</p>
      </sec>
      <sec id="sec5dot5">
        <title>5.5. Implications of the Demand Scenarios</title>
        <p>According to the trend scenario, domestic electricity consumption reaches 20.1 TWh by 2030, approximately 37% above 2025 level. To meet this demand, simply adding a few generation units will not be enough. Planning must coordinate investments in generation, transmission lines, substations, distribution networks, system control, and flexibility resources. Without an integrated approach, new plants could be constraints by network limitations or fail to support peak demand effectively.</p>
        <p>The accelerated scenario reaches 21.5 TWh, while 10% growth sensitivity case approaches 23.6 TWh. Although the latter is not considered the most likely outcome, it provides a useful stress test for the power system. Even the moderate scenario rises to 18.7 TWh, requiring more than 4 TWh of additional energy within five years. Each trajectory therefore requires significant and timely investments, given the long construction periods for power plants, power transmission lines and substations.</p>
        <p>The lower linear extrapolation also shows that these projections are uncertain. Future consumption will depend on the select modeling approach and changes in economic activity, industrial development, electricity rates and final consumption patterns. These results should therefore be treated as a range of possible scenarios rather than a single forecast.</p>
        <p>The projections are consistent with studies anticipating strong electricity demand growth in Côte d’Ivoire [<xref ref-type="bibr" rid="B9">9</xref>][<xref ref-type="bibr" rid="B28">28</xref>]. However, this analysis does not determine an optimal generation mix or minimize total system costs, as TIMES, PyPSA, and regional optimization models generally do. Its purpose is to extend recent trends, quantify the possible scale of future needs and provide a practical basis for testing the robustness of investment decisions.</p>
      </sec>
    </sec>
    <sec id="sec6">
      <title>6. Planning Implications</title>
      <p>As summarized in <bold>Table 7</bold>, supply security requires more than new generation capacity. Immediate priorities should include rehabilitating aging units, improving maintenance coordination, securing fuel supplies and reducing transmission and distribution losses. System performance should be evaluated by considering the actual plant availability, forced outage rates, fuel constraints, and N-1 network loading, rather than nominal capacity alone.</p>
      <p>New generation units must also be coordinated with the modernization of transmission networks and substations to prevent congestion. At the distribution level, mapping technical and non-technical losses by substation and feeder would support targeted investments and increase both delivered energy and revenue. </p>
      <p>In the medium term, Côte d’Ivoire should develop a diversified portfolio combining adjustable generation, hydropower, solar power, storage and demand response where economically justified. Regional interconnections should remain a source of flexibility, but their availability must be tested under adverse conditions, while export commitments should ensure sufficient margins for domestic demand and reserves.</p>
      <p>Finally, access to hourly load profiles, unit-level outage records and network incident data would support more reliable assessments using probabilistic indicators such as LOLE and EENS.</p>
      <p><bold>Table 7</bold><bold>.</bold> Recommended planning priorities, monitoring ındicators, and expected outcomes.</p>
      <table-wrap id="tbl7">
        <label>Table 7</label>
        <table>
          <tbody>
            <tr>
              <td>Priority</td>
              <td>Proposed action</td>
              <td>Monitoring indicator</td>
              <td>Expected outcome</td>
            </tr>
            <tr>
              <td>Plant availibility</td>
              <td>Rehabilitate aging generation units and coordinate maintenance schedules</td>
              <td>Plant-level availability and forced-outage rate</td>
              <td>Rapid recovery of firm capacity</td>
            </tr>
            <tr>
              <td>Fuel supply</td>
              <td>Secure natural gas supplies and develop shortage scenarios</td>
              <td>Days of fuel inventory and capacity constrained by gas shortages</td>
              <td>Reduced fuel supply risk</td>
            </tr>
            <tr>
              <td>Transmission network</td>
              <td>Reinforce corridors and substations approaching their operating limits</td>
              <td>N − 1 loading and transformer load rate</td>
              <td>Reduced network congestion</td>
            </tr>
            <tr>
              <td>Distribution</td>
              <td>Identify and reduce technical and nontechnical losses</td>
              <td>Efficiency by substation and feeder</td>
              <td>More energy delivered and higher revenue</td>
            </tr>
            <tr>
              <td>Flexibility</td>
              <td>Improve forecasting, demand response, and targeted energy storage</td>
              <td>Reserve requirements, ramp rates, and avoided peak demand</td>
              <td>Greater solar integration</td>
            </tr>
            <tr>
              <td>Regional trade</td>
              <td>Test firm import availability under stress conditions</td>
              <td>Firm exchange capacity and simultaneous regional events</td>
              <td>More realistic assessment of regional supply security</td>
            </tr>
            <tr>
              <td>Data</td>
              <td>Publish anonymized hourly load profiles and unit-level outage data</td>
              <td>Data completeness and reporting frequency</td>
              <td>Reproducible LOLE and EENS calculations</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
    </sec>
    <sec id="sec7">
      <title>7. Limitations and Future Research</title>
      <p>This study has four main limitations. First, annual data do not capture hourly peaks, ramping requirements, or temporary network congestion. Second, total plant availability cannot replace unit-level outage rates. Third, annual electricity trade volumes provide no information on import capacity during critical periods. Finally, the scenarios assume constant growth rates without explicitly modeling macroeconomic factors.</p>
      <p>Future research should focus on developing an hourly dataset covering at least three to five years, including demand, unit level generation, reserves, outages, hydrological conditions, gas supply, and interconnection flows. Chronological Monte Carlo simulation could then be used to estimate LOLE, LOLH, and EENS values [<xref ref-type="bibr" rid="B26">26</xref>]. Capacity expansion models could also compare investment portfolios based on costs, emissions, resilience to drought, and fuel dependency, using tools such as MAED, TIMES, EnergyPLAN, or PyPSA [<xref ref-type="bibr" rid="B28">28</xref>]-[<xref ref-type="bibr" rid="B30">30</xref>]. Future analysis should also include N-1 network constraints and the location of new generation plants.</p>
    </sec>
    <sec id="sec8">
      <title>8. Conclusions</title>
      <p>Côte d’Ivoire’s power system expanded significantly between 2014 and 2025. Domestic generation, installed capacity, network infrastructure and the number of customers all increased, thereby promoting broader access to electricity, economic activity, and regional trade. However, available supply has not kept pace with rapidly rising demand.</p>
      <p>Domestic electricity consumption nearly doubled, from 7333 to 14,635 GWh, while generation grew more slowly. Despite the addition of almost 1000 MW since 2020, total plan availability fell to 79% in 2025. This confirms that installed capacity alone is not an adequate indicator of supply security.</p>
      <p>Regional trade shows a similar tightening. Imports reached a record of 708 GWh in 2025, reducing the net export balance to only 90 GWh. Interconnections have helped offset domestic constraints, but their availability cannot be guaranteed when neighboring countries face simultaneous shortages or peak demand. Network performance was also mixed: transmission efficiency reached 95%, while distribution losses remained high at 10.62%. Recent improvements in outage duration and frequency, as well as in energy not supplied, are encouraging but need to be confirmed over a longer period.</p>
      <p>By 2030, the three main scenarios project annual consumption between 18.7 and 21.5 TWh, with the high-growth sensitivity case reaching 23.6 TWh. Even the moderate trajectory requires more than 4 TWh of additional energy within five years. To meet this need, coordinated investments will be required in available generation capacity, fuel supply security, grid reinforcement, renewable energy, flexible reserves, demand response, storage where economically justified, and the reduction of distribution losses.</p>
      <p>However, this study has certain limitations, as it is based on annual data that do not capture hourly peaks, short outages, or seasonal constraints. Future work should use hourly demand, generation, outages, and electricity exchanges data to facilitate integrated planning and probabilistic assessments using indicators such as LOLE and EENS.</p>
      <p>In general, Côte d’Ivoire has strong assets, including a diversified generation fleet, regional export experience and a growing domestic market. Preserving these advantages will depend on converting installed capacity into reliable output, improving network efficiency, and anticipating future demand through coordinated, transparent, and regularly updated planning.</p>
    </sec>
    <sec id="sec9">
      <title>Author Contributions</title>
      <p>Kone Gbah: Conceptualization; methodology; validation; formal analysis; investigation; resources; data curation; writing; original draft; preparation; writing review and editing; vizualisation; supervision; N’Guetta Akpagni Rene: Investigation; resources; vizualisation; N’Guessan Konan Felix Renato: Investigation; resources; vizualisation.</p>
    </sec>
    <sec id="sec10">
      <title>Appendix</title>
      <p><bold>Table A1.</bold>Installed capacity (MW).</p>
      <table-wrap id="tbl8">
        <label>Table 8</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Power plants</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>hydropower</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                <bold>CIE hydropower</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Ayame 1</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
              <td>20</td>
            </tr>
            <tr>
              <td>Ayame 2</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
              <td>30</td>
            </tr>
            <tr>
              <td>Kossou</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
              <td>174</td>
            </tr>
            <tr>
              <td>Taabo</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
            </tr>
            <tr>
              <td>Buyo</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
              <td>165</td>
            </tr>
            <tr>
              <td>Faye</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
              <td>5</td>
            </tr>
            <tr>
              <td>
                <bold>Total CIE Hydropower</bold>
              </td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
            </tr>
            <tr>
              <td>Soubre</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
              <td>275</td>
            </tr>
            <tr>
              <td>Gribo popoli</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>112</td>
              <td>112</td>
            </tr>
            <tr>
              <td>
                <bold>Total Hydropower</bold>
              </td>
              <td>604</td>
              <td>604</td>
              <td>604</td>
              <td>879</td>
              <td>879</td>
              <td>879</td>
              <td>879</td>
              <td>879</td>
              <td>879</td>
              <td>879</td>
              <td>991</td>
              <td>991</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>45.5%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>12.7%</td>
              <td>0.0%</td>
            </tr>
            <tr>
              <td>
                <bold>Solar</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Boundiali solar</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>30</td>
              <td>30</td>
              <td>67</td>
            </tr>
            <tr>
              <td>
                <bold>Total solar</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>30</td>
              <td>30</td>
              <td>67</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>0.0%</td>
              <td>123.3%</td>
            </tr>
            <tr>
              <td>
                <bold>Thermal</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Vridi</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
            </tr>
            <tr>
              <td>Ciprel</td>
              <td>432</td>
              <td>432</td>
              <td>543</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
              <td>569</td>
            </tr>
            <tr>
              <td>Azito</td>
              <td>296</td>
              <td>436</td>
              <td>436</td>
              <td>441</td>
              <td>441</td>
              <td>441</td>
              <td>471</td>
              <td>471</td>
              <td>650</td>
              <td>724</td>
              <td>724</td>
              <td>724</td>
            </tr>
            <tr>
              <td>Aggreko</td>
              <td>200</td>
              <td>200</td>
              <td>200</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>210</td>
              <td>250</td>
              <td>250</td>
              <td>250</td>
              <td>250</td>
              <td>283</td>
            </tr>
            <tr>
              <td>Karpower</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
              <td>100</td>
            </tr>
            <tr>
              <td>Atinkou</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>255</td>
              <td>255</td>
              <td>390</td>
            </tr>
            <tr>
              <td>
                <bold>Total thermal</bold>
              </td>
              <td>1028</td>
              <td>1168</td>
              <td>1279</td>
              <td>1320</td>
              <td>1320</td>
              <td>1320</td>
              <td>1350</td>
              <td>1390</td>
              <td>1669</td>
              <td>1998</td>
              <td>1998</td>
              <td>2166</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>12%</td>
              <td>14%</td>
              <td>10%</td>
              <td>3%</td>
              <td>0%</td>
              <td>0%</td>
              <td>2%</td>
              <td>3%</td>
              <td>20%</td>
              <td>20%</td>
              <td>20%</td>
              <td>20%</td>
            </tr>
            <tr>
              <td>
                <bold>Total hydropower + solar + Thermal</bold>
              </td>
              <td>1632</td>
              <td>1772</td>
              <td>1883</td>
              <td>2199</td>
              <td>2199</td>
              <td>2199</td>
              <td>2229</td>
              <td>2269</td>
              <td>2548</td>
              <td>2907</td>
              <td>3019</td>
              <td>3224</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>7.3%</td>
              <td>8.6%</td>
              <td>6.3%</td>
              <td>16.8%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>1.4%</td>
              <td>1.8%</td>
              <td>12.3%</td>
              <td>14.1%</td>
              <td>3.9%</td>
              <td>6.8%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A2.</bold>Net generation trend (GWh).</p>
      <table-wrap id="tbl9">
        <label>Table 9</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Power plants</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>hydropower</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                <bold>CIE hydropower</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Ayame 1</td>
              <td>113</td>
              <td>63</td>
              <td>75</td>
              <td>73</td>
              <td>101</td>
              <td>117</td>
              <td>83</td>
              <td>72</td>
              <td>78</td>
              <td>84</td>
              <td>86</td>
              <td>58</td>
            </tr>
            <tr>
              <td>Ayame 2</td>
              <td>135</td>
              <td>99</td>
              <td>111</td>
              <td>102</td>
              <td>114</td>
              <td>110</td>
              <td>101</td>
              <td>91</td>
              <td>97</td>
              <td>44</td>
              <td>49</td>
              <td>2</td>
            </tr>
            <tr>
              <td>Kossou</td>
              <td>81</td>
              <td>47</td>
              <td>49</td>
              <td>77</td>
              <td>81</td>
              <td>194</td>
              <td>229</td>
              <td>114</td>
              <td>92</td>
              <td>157</td>
              <td>139</td>
              <td>196</td>
            </tr>
            <tr>
              <td>Taabo</td>
              <td>473</td>
              <td>388</td>
              <td>453</td>
              <td>404</td>
              <td>609</td>
              <td>779</td>
              <td>803</td>
              <td>590</td>
              <td>603</td>
              <td>836</td>
              <td>756</td>
              <td>799</td>
            </tr>
            <tr>
              <td>Buyo</td>
              <td>1093</td>
              <td>736</td>
              <td>822</td>
              <td>747</td>
              <td>727</td>
              <td>663</td>
              <td>671</td>
              <td>594</td>
              <td>617</td>
              <td>596</td>
              <td>655</td>
              <td>724</td>
            </tr>
            <tr>
              <td>Faye</td>
              <td>5</td>
              <td>7</td>
              <td>8</td>
              <td>1</td>
              <td>00</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>
                <bold>Total CIE Hydropower</bold>
              </td>
              <td>1901</td>
              <td>1340</td>
              <td>1517</td>
              <td>1404</td>
              <td>1633</td>
              <td>1863</td>
              <td>1886</td>
              <td>1461</td>
              <td>1488</td>
              <td>1717</td>
              <td>1685</td>
              <td>1779</td>
            </tr>
            <tr>
              <td>Soubre hydropower</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>MV</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>3</td>
              <td>28</td>
              <td>32</td>
              <td>39</td>
              <td>41</td>
              <td>41</td>
              <td>42</td>
              <td>24</td>
              <td>25</td>
            </tr>
            <tr>
              <td>HV</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>623</td>
              <td>1277</td>
              <td>1559</td>
              <td>1429</td>
              <td>1107</td>
              <td>1316</td>
              <td>1422</td>
              <td>1413</td>
              <td>1380</td>
            </tr>
            <tr>
              <td>Total Soubre hydropower</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>626</td>
              <td>1306</td>
              <td>1591</td>
              <td>1467</td>
              <td>1148</td>
              <td>1358</td>
              <td>1464</td>
              <td>1437</td>
              <td>1405</td>
            </tr>
            <tr>
              <td>Grobo-popoli hydropower</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Gribo-popoli</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>269</td>
              <td>631</td>
            </tr>
            <tr>
              <td>Total Gribo-popoli hydropoer</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>269</td>
              <td>631</td>
            </tr>
            <tr>
              <td>
                <bold>Total Hydropower</bold>
              </td>
              <td>1901</td>
              <td>1340</td>
              <td>1517</td>
              <td>2030</td>
              <td>2938</td>
              <td>3455</td>
              <td>3354</td>
              <td>2609</td>
              <td>2846</td>
              <td>3180</td>
              <td>3391</td>
              <td>3815</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>19.3%</td>
              <td>−29.5%</td>
              <td>13.2%</td>
              <td>33.9%</td>
              <td>44.7%</td>
              <td>17.6%</td>
              <td>−2.9%</td>
              <td>−22.2%</td>
              <td>9.1%</td>
              <td>11.8%</td>
              <td>6.6%</td>
              <td>12.5%</td>
            </tr>
            <tr>
              <td>
                <bold>Solar</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Boundiali solar</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>24</td>
              <td>50</td>
              <td>101</td>
            </tr>
            <tr>
              <td>
                <bold>Total solar</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>24</td>
              <td>50</td>
              <td>101</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>110.5%</td>
              <td>101.1%</td>
            </tr>
            <tr>
              <td>
                <bold>Thermal</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Vridi</td>
              <td>335</td>
              <td>295</td>
              <td>236</td>
              <td>184</td>
              <td>111</td>
              <td>80</td>
              <td>207</td>
              <td>403</td>
              <td>380</td>
              <td>264</td>
              <td>357</td>
              <td>407</td>
            </tr>
            <tr>
              <td>Ciprel</td>
              <td>2902</td>
              <td>2502</td>
              <td>3504</td>
              <td>3199</td>
              <td>2939</td>
              <td>3196</td>
              <td>3382</td>
              <td>3546</td>
              <td>3247</td>
              <td>3010</td>
              <td>3198</td>
              <td>2700</td>
            </tr>
            <tr>
              <td>Azito</td>
              <td>1382</td>
              <td>2696</td>
              <td>2994</td>
              <td>3069</td>
              <td>2833</td>
              <td>2744</td>
              <td>3140</td>
              <td>3261</td>
              <td>3738</td>
              <td>4003</td>
              <td>2882</td>
              <td>3819</td>
            </tr>
            <tr>
              <td>Aggreko</td>
              <td>1632</td>
              <td>1685</td>
              <td>1680</td>
              <td>1313</td>
              <td>1009</td>
              <td>959</td>
              <td>941</td>
              <td>1432</td>
              <td>1403</td>
              <td>1300</td>
              <td>1083</td>
              <td>1257</td>
            </tr>
            <tr>
              <td>Karpower</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>345</td>
              <td>637</td>
              <td>1030</td>
              <td>815</td>
            </tr>
            <tr>
              <td>Atinkou</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>730</td>
              <td>1740</td>
              <td>1637</td>
            </tr>
            <tr>
              <td>Biovea</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>7</td>
            </tr>
            <tr>
              <td>
                <bold>Total thermal</bold>
              </td>
              <td>6251</td>
              <td>7177</td>
              <td>8414</td>
              <td>7766</td>
              <td>6893</td>
              <td>9679</td>
              <td>7670</td>
              <td>8642</td>
              <td>9113</td>
              <td>9944</td>
              <td>10,290</td>
              <td>10,643</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>5.6%</td>
              <td>14.8%</td>
              <td>17.2%</td>
              <td>−7.7%</td>
              <td>−11.2%</td>
              <td>1.3%</td>
              <td>9.9%</td>
              <td>12.7%</td>
              <td>5.5%</td>
              <td>9.1%</td>
              <td>3.5%</td>
              <td>3.4%</td>
            </tr>
            <tr>
              <td>
                <bold>Self producers</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>SIR outpout</td>
              <td>0.6</td>
              <td>0.2</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>0.3</td>
              <td>0.3</td>
              <td>1.9</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>1.0</td>
            </tr>
            <tr>
              <td>
                <bold>Total self producers</bold>
              </td>
              <td>0.6</td>
              <td>0.2</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>0.3</td>
              <td>0.3</td>
              <td>1.9</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>1.0</td>
            </tr>
            <tr>
              <td>
                <bold>Total interconected grid</bold>
              </td>
              <td>8152</td>
              <td>8518</td>
              <td>9931</td>
              <td>9796</td>
              <td>9831</td>
              <td>10,434</td>
              <td>11,024</td>
              <td>11,252</td>
              <td>11,959</td>
              <td>13,149</td>
              <td>13,731</td>
              <td>14,560</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>8.4%</td>
              <td>4.5%</td>
              <td>16.6%</td>
              <td>−1.4%</td>
              <td>0.4%</td>
              <td>6.1%</td>
              <td>5.9%</td>
              <td>2.1%</td>
              <td>6.3%</td>
              <td>9.9%</td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                <bold>Isolated and automatic plants</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Conventional isolated plants</td>
              <td>0</td>
              <td>4</td>
              <td>2</td>
              <td>2</td>
              <td>2</td>
              <td>2</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Automatic isolated plants</td>
              <td>13</td>
              <td>7</td>
              <td>6</td>
              <td>5</td>
              <td>6</td>
              <td>6</td>
              <td>6</td>
              <td>5</td>
              <td>3</td>
              <td>2</td>
              <td>2</td>
              <td>3</td>
            </tr>
            <tr>
              <td>
                <bold>Total Isolated and Automatic Plants</bold>
              </td>
              <td>13</td>
              <td>11</td>
              <td>8</td>
              <td>7</td>
              <td>8</td>
              <td>8</td>
              <td>6</td>
              <td>5</td>
              <td>3</td>
              <td>2</td>
              <td>2</td>
              <td>3</td>
            </tr>
            <tr>
              <td>
                <bold>Total national grid</bold>
              </td>
              <td>8166</td>
              <td>8529</td>
              <td>9939</td>
              <td>9803</td>
              <td>9840</td>
              <td>10,442</td>
              <td>11,031</td>
              <td>11,257</td>
              <td>11,962</td>
              <td>13,150</td>
              <td>13,733</td>
              <td>14,563</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>8.4%</td>
              <td>4.4%</td>
              <td>16.5%</td>
              <td>−1.4%</td>
              <td>0.45</td>
              <td>6.1%</td>
              <td>5.6%</td>
              <td>2.1%</td>
              <td>6.3%</td>
              <td>9.9%</td>
              <td>4.4%</td>
              <td>6.0%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A3.</bold>Net generation mix.</p>
      <table-wrap id="tbl10">
        <label>Table 10</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Power plants</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>hydropower</bold>
              </td>
              <td>23%</td>
              <td>16%</td>
              <td>15%</td>
              <td>21%</td>
              <td>30%</td>
              <td>33%</td>
              <td>30%</td>
              <td>23%</td>
              <td>24%</td>
              <td>24%</td>
              <td>25%</td>
              <td>26%</td>
            </tr>
            <tr>
              <td>
                <bold>CIE hydropower</bold>
              </td>
              <td>23%</td>
              <td>16%</td>
              <td>15%</td>
              <td>14%</td>
              <td>17%</td>
              <td>18%</td>
              <td>17%</td>
              <td>13%</td>
              <td>12%</td>
              <td>13%</td>
              <td>12%</td>
              <td>12%</td>
            </tr>
            <tr>
              <td>Soubre</td>
              <td>0%</td>
              <td>0%</td>
              <td>0%</td>
              <td>6%</td>
              <td>13%</td>
              <td>15%</td>
              <td>13%</td>
              <td>10%</td>
              <td>11%</td>
              <td>11%</td>
              <td>10%</td>
              <td>10%</td>
            </tr>
            <tr>
              <td>Gribo popoli</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>2%</td>
              <td>4%</td>
            </tr>
            <tr>
              <td>
                <bold>Solar</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>0.2%</td>
              <td>0.4%</td>
              <td>0.7%</td>
            </tr>
            <tr>
              <td>Boundiali solar</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>0.2%</td>
              <td>0.4%</td>
              <td>0.7%</td>
            </tr>
            <tr>
              <td>
                <bold>Thermal</bold>
              </td>
              <td>77%</td>
              <td>84%</td>
              <td>85%</td>
              <td>79%</td>
              <td>70%</td>
              <td>67%</td>
              <td>70%</td>
              <td>77%</td>
              <td>76%</td>
              <td>76%</td>
              <td>75%</td>
              <td>73%</td>
            </tr>
            <tr>
              <td>Vridi</td>
              <td>4%</td>
              <td>3%</td>
              <td>2%</td>
              <td>2%</td>
              <td>1%</td>
              <td>1%</td>
              <td>2%</td>
              <td>4%</td>
              <td>3%</td>
              <td>2%</td>
              <td>3%</td>
              <td>3%</td>
            </tr>
            <tr>
              <td>Ciprel</td>
              <td>36%</td>
              <td>29%</td>
              <td>35%</td>
              <td>33%</td>
              <td>30%</td>
              <td>31%</td>
              <td>31%</td>
              <td>31%</td>
              <td>27%</td>
              <td>23%</td>
              <td>23%</td>
              <td>19%</td>
            </tr>
            <tr>
              <td>Azito</td>
              <td>17%</td>
              <td>32%</td>
              <td>30%</td>
              <td>31%</td>
              <td>29%</td>
              <td>26%</td>
              <td>28%</td>
              <td>29%</td>
              <td>31%</td>
              <td>30%</td>
              <td>21%</td>
              <td>26%</td>
            </tr>
            <tr>
              <td>Aggreko</td>
              <td>20%</td>
              <td>20%</td>
              <td>17%</td>
              <td>13%</td>
              <td>10%</td>
              <td>9%</td>
              <td>9%</td>
              <td>13%</td>
              <td>12%</td>
              <td>10%</td>
              <td>8%</td>
              <td>9%</td>
            </tr>
            <tr>
              <td>Karpower</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>3%</td>
              <td>5%</td>
              <td>7%</td>
              <td>6%</td>
            </tr>
            <tr>
              <td>Atinkou</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>6%</td>
              <td>13%</td>
              <td>11%</td>
            </tr>
            <tr>
              <td>
                <bold>Self-Producers</bold>
              </td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
            </tr>
            <tr>
              <td>
                <bold>Isolated and automatic plants</bold>
              </td>
              <td>0.2%</td>
              <td>0.1%</td>
              <td>0.1%</td>
              <td>0.1%</td>
              <td>0.1%</td>
              <td>0.1%</td>
              <td>0.1%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
              <td>0.0%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A4.</bold>Domestic electricity consumption (GWh).</p>
      <table-wrap id="tbl11">
        <label>Table 11</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>GROSS GENERATION (hydro + solar + thermal)</bold>
              </td>
              <td>8202</td>
              <td>8608</td>
              <td>10,072</td>
              <td>9941</td>
              <td>9990</td>
              <td>10,605</td>
              <td>11,204</td>
              <td>11,420</td>
              <td>12,145</td>
              <td>13,343</td>
              <td>13,917</td>
              <td>14,720</td>
            </tr>
            <tr>
              <td>
                <bold>SIR Output (HV)</bold>
              </td>
              <td>0.6</td>
              <td>0.2</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>0.3</td>
              <td>0.3</td>
              <td>1.9</td>
              <td>0.2</td>
              <td>0.3</td>
              <td>0.7</td>
              <td>1.0</td>
            </tr>
            <tr>
              <td>Imports from VRA/SONABEL/EDM/CLSG (Unscheduled and Emergency)</td>
              <td>20</td>
              <td>17</td>
              <td>7</td>
              <td>21</td>
              <td>78</td>
              <td>77</td>
              <td>149</td>
              <td>197</td>
              <td>267</td>
              <td>269</td>
              <td>382</td>
              <td>708</td>
            </tr>
            <tr>
              <td>Exports to VRA/CEB/SONABEL/EDM/LEC/CLSG</td>
              <td>902</td>
              <td>872</td>
              <td>1655</td>
              <td>1247</td>
              <td>1156</td>
              <td>1255</td>
              <td>1333</td>
              <td>887</td>
              <td>973</td>
              <td>1052</td>
              <td>730</td>
              <td>797</td>
            </tr>
            <tr>
              <td>Exports-Imports</td>
              <td>883</td>
              <td>855</td>
              <td>1648</td>
              <td>1225</td>
              <td>1078</td>
              <td>1179</td>
              <td>1184</td>
              <td>690</td>
              <td>706</td>
              <td>784</td>
              <td>349</td>
              <td>90</td>
            </tr>
            <tr>
              <td>
                <bold>Gross Domestic Consumption</bold>
                <bold>(Interconnected</bold>
                <bold>Grid)</bold>
              </td>
              <td>7319</td>
              <td>7753</td>
              <td>8424</td>
              <td>8716</td>
              <td>8913</td>
              <td>9427</td>
              <td>10,020</td>
              <td>10,732</td>
              <td>11,439</td>
              <td>12,559</td>
              <td>13,570</td>
              <td>14,631</td>
            </tr>
            <tr>
              <td>Change (%)</td>
              <td>8.0%</td>
              <td>5.9%</td>
              <td>8.7%</td>
              <td>3.5%</td>
              <td>2.3%</td>
              <td>5.8%</td>
              <td>6.3%</td>
              <td>7.1%</td>
              <td>6.6%</td>
              <td>9.8%</td>
              <td>8.0%</td>
              <td>7.8%</td>
            </tr>
            <tr>
              <td>Gross Generation-Isolated Plants</td>
              <td>13</td>
              <td>10</td>
              <td>8</td>
              <td>7</td>
              <td>7</td>
              <td>7</td>
              <td>6</td>
              <td>5</td>
              <td>3</td>
              <td>2</td>
              <td>2</td>
              <td>1</td>
            </tr>
            <tr>
              <td>Imports from NEDCo</td>
              <td>0</td>
              <td>6</td>
              <td>12</td>
              <td>14</td>
              <td>16</td>
              <td>17</td>
              <td>3</td>
              <td>1</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>Gross Domestic Consumption (Including Isolated Grids)</td>
              <td>7333</td>
              <td>7769</td>
              <td>8444</td>
              <td>8738</td>
              <td>8936</td>
              <td>9451</td>
              <td>10,029</td>
              <td>10,738</td>
              <td>11,442</td>
              <td>12,561</td>
              <td>13,572</td>
              <td>14,635</td>
            </tr>
            <tr>
              <td>Change (%)</td>
              <td>8.0%</td>
              <td>5.9%</td>
              <td>8.7%</td>
              <td>3.5%</td>
              <td>2.3%</td>
              <td>5.8%</td>
              <td>6.1%</td>
              <td>7.1%</td>
              <td>6.6%</td>
              <td>9.8%</td>
              <td>8.0%</td>
              <td>7.8%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A5.</bold> Cross-border electricity flows.</p>
      <table-wrap id="tbl12">
        <label>Table 12</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Exports (GWh)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                <bold>GRIDCo (VRA)</bold>
              </td>
              <td>52</td>
              <td>227</td>
              <td>575</td>
              <td>242</td>
              <td>141</td>
              <td>127</td>
              <td>58</td>
              <td>43</td>
              <td>36</td>
              <td>80</td>
              <td>57</td>
              <td>11</td>
            </tr>
            <tr>
              <td>CEB</td>
              <td>119</td>
              <td>13</td>
              <td>222</td>
              <td>73</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>SONABEL</td>
              <td>434</td>
              <td>382</td>
              <td>571</td>
              <td>583</td>
              <td>561</td>
              <td>506</td>
              <td>489</td>
              <td>412</td>
              <td>281</td>
              <td>297</td>
              <td>202</td>
              <td>338</td>
            </tr>
            <tr>
              <td>EDM HTB</td>
              <td>291</td>
              <td>244</td>
              <td>276</td>
              <td>333</td>
              <td>437</td>
              <td>602</td>
              <td>762</td>
              <td>403</td>
              <td>489</td>
              <td>256</td>
              <td>111</td>
              <td>102</td>
            </tr>
            <tr>
              <td>
                <bold>EDM HTA</bold>
              </td>
              <td>4</td>
              <td>4</td>
              <td>5</td>
              <td>6</td>
              <td>7</td>
              <td>7</td>
              <td>7</td>
              <td>7</td>
              <td>8</td>
              <td>9</td>
              <td>10</td>
              <td>11</td>
            </tr>
            <tr>
              <td>LEC</td>
              <td>2</td>
              <td>2</td>
              <td>7</td>
              <td>8</td>
              <td>10</td>
              <td>13</td>
              <td>18</td>
              <td>21</td>
              <td>26</td>
              <td>28</td>
              <td>37</td>
              <td>37</td>
            </tr>
            <tr>
              <td>CLSG</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>1</td>
              <td>134</td>
              <td>383</td>
              <td>313</td>
              <td>299</td>
            </tr>
            <tr>
              <td>Total Exports</td>
              <td>902</td>
              <td>872</td>
              <td>1655</td>
              <td>1247</td>
              <td>1156</td>
              <td>1255</td>
              <td>1333</td>
              <td>887</td>
              <td>973</td>
              <td>1052</td>
              <td>730</td>
              <td>797</td>
            </tr>
            <tr>
              <td>Imports (GWh)</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                GRIDCo (VRA, GENSER
                <bold>)</bold>
              </td>
              <td>19.6</td>
              <td>17.2</td>
              <td>604</td>
              <td>21.2</td>
              <td>77.5</td>
              <td>76.4</td>
              <td>149.4</td>
              <td>197.0</td>
              <td>265.6</td>
              <td>264.7</td>
              <td>376.7</td>
              <td>691.3</td>
            </tr>
            <tr>
              <td>SONABEL</td>
              <td>0.0</td>
              <td>0.1</td>
              <td>0.0</td>
              <td>0.1</td>
              <td>0.1</td>
              <td>0.1</td>
              <td>0.0</td>
              <td>0.2</td>
              <td>1.1</td>
              <td>0.5</td>
              <td>1.1</td>
              <td>0.4</td>
            </tr>
            <tr>
              <td>EDM</td>
              <td>0.1</td>
              <td>0.1</td>
              <td>0.2</td>
              <td>0.1</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.9</td>
              <td>0.0</td>
              <td>0.0</td>
            </tr>
            <tr>
              <td>CLSG</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>0.0</td>
              <td>0.1</td>
              <td>2.4</td>
              <td>4.0</td>
              <td>16.0</td>
            </tr>
            <tr>
              <td>Total Imports</td>
              <td>20</td>
              <td>17</td>
              <td>7</td>
              <td>21</td>
              <td>78</td>
              <td>77</td>
              <td>149</td>
              <td>197</td>
              <td>267</td>
              <td>269</td>
              <td>382</td>
              <td>708</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A6.</bold> Cross-border electricity sales and purchases.</p>
      <table-wrap id="tbl13">
        <label>Table 13</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Cross-Border Electricity Sales (GWh)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>
                <bold>VRA</bold>
              </td>
              <td>46</td>
              <td>210</td>
              <td>568</td>
              <td>221</td>
              <td>63</td>
              <td>51</td>
              <td>0</td>
              <td>0</td>
              <td>36</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>CEB</td>
              <td>119</td>
              <td>13</td>
              <td>222</td>
              <td>73</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>SONABEL</td>
              <td>434</td>
              <td>382</td>
              <td>571</td>
              <td>583</td>
              <td>561</td>
              <td>505</td>
              <td>489</td>
              <td>412</td>
              <td>280</td>
              <td>296</td>
              <td>201</td>
              <td>338</td>
            </tr>
            <tr>
              <td>EDM HTB</td>
              <td>291</td>
              <td>244</td>
              <td>276</td>
              <td>333</td>
              <td>437</td>
              <td>602</td>
              <td>762</td>
              <td>403</td>
              <td>488</td>
              <td>255</td>
              <td>111</td>
              <td>102</td>
            </tr>
            <tr>
              <td>
                <bold>EDM HTA</bold>
              </td>
              <td>4.4</td>
              <td>4.4</td>
              <td>4.7</td>
              <td>6.3</td>
              <td>6.8</td>
              <td>7.5</td>
              <td>6.5</td>
              <td>8.4</td>
              <td>8.2</td>
              <td>9.3</td>
              <td>9.8</td>
              <td>10.6</td>
            </tr>
            <tr>
              <td>LEC</td>
              <td>1.8</td>
              <td>2.1</td>
              <td>6.5</td>
              <td>8.5</td>
              <td>10.2</td>
              <td>13.3</td>
              <td>18.0</td>
              <td>20.7</td>
              <td>25.7</td>
              <td>28.2</td>
              <td>36.8</td>
              <td>37.1</td>
            </tr>
            <tr>
              <td>CLSG</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>1.4</td>
              <td>133.6</td>
              <td>387.9</td>
              <td>311.4</td>
              <td>298.9</td>
            </tr>
            <tr>
              <td>Total Cross-Border Sales</td>
              <td>897</td>
              <td>855</td>
              <td>1648</td>
              <td>1225</td>
              <td>1078</td>
              <td>1179</td>
              <td>1275</td>
              <td>845</td>
              <td>971</td>
              <td>977</td>
              <td>670</td>
              <td>787</td>
            </tr>
            <tr>
              <td>Change (%)</td>
              <td>9.4%</td>
              <td>−4.6%</td>
              <td>92.8%</td>
              <td>−25.7%</td>
              <td>−12.0%</td>
              <td>9.3%</td>
              <td>8.2%</td>
              <td>−33.7%</td>
              <td>15.0%</td>
              <td>0.5%</td>
              <td>−31.4%</td>
              <td>17.4%</td>
            </tr>
            <tr>
              <td>Cross-Border Electricity Purchases (GWh)</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>VRA</td>
              <td>13.9</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>91.2</td>
              <td>153.7</td>
              <td>265.6</td>
              <td>245.4</td>
              <td>42.7</td>
              <td>75.3</td>
            </tr>
            <tr>
              <td>NEDCO</td>
              <td>0.0</td>
              <td>5.8</td>
              <td>12.2</td>
              <td>14.5</td>
              <td>16.0</td>
              <td>16.9</td>
              <td>2.6</td>
              <td>1.3</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
              <td>0.0</td>
            </tr>
            <tr>
              <td>GENSER</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>334.1</td>
              <td>615.2</td>
            </tr>
            <tr>
              <td>Total Cross-Border Purchases</td>
              <td>13.9</td>
              <td>5.8</td>
              <td>12.2</td>
              <td>14.5</td>
              <td>16.0</td>
              <td>16.9</td>
              <td>93.8</td>
              <td>154.9</td>
              <td>265.6</td>
              <td>245.4</td>
              <td>376.8</td>
              <td>690.5</td>
            </tr>
            <tr>
              <td>Change (%)</td>
              <td>−47.5%</td>
              <td>−58.2%</td>
              <td>110.0%</td>
              <td>18.3%</td>
              <td>10.7%</td>
              <td>5.5%</td>
              <td>454.4%</td>
              <td>65.1%</td>
              <td>71.4%</td>
              <td>−7.6%</td>
              <td>53.6%</td>
              <td>83.3%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A7.</bold> Grid efficiency.</p>
      <table-wrap id="tbl14">
        <label>Table 14</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Transmission Efficiency</bold>
              </td>
              <td>93.6%</td>
              <td>93.5%</td>
              <td>92.9%</td>
              <td>92.3%</td>
              <td>94.0%</td>
              <td>95.2%</td>
              <td>94.6%</td>
              <td>94.7%</td>
              <td>94.0%</td>
              <td>93.9%</td>
              <td>94.4%</td>
              <td>95.00%</td>
            </tr>
            <tr>
              <td>
                <bold>Distribution Efficiency</bold>
              </td>
              <td>82.4%</td>
              <td>83.3%</td>
              <td>84.9%</td>
              <td>84.7%</td>
              <td>85.0%</td>
              <td>87.0%</td>
              <td>87.0%</td>
              <td>89.1%</td>
              <td>91.3%</td>
              <td>91.1%</td>
              <td>90.3%</td>
              <td>89.38%</td>
            </tr>
            <tr>
              <td>
                <bold>Generation-to-Transmission</bold>
                <bold>Efficiency</bold>
              </td>
              <td>93.0%</td>
              <td>92.5%</td>
              <td>91.6%</td>
              <td>90.9%</td>
              <td>92.5%</td>
              <td>93.7%</td>
              <td>93.1%</td>
              <td>93.0%</td>
              <td>92.6%</td>
              <td>92.5%</td>
              <td>93.2%</td>
              <td>94.0%</td>
            </tr>
            <tr>
              <td>Transmission-to-DistributionEfficiency</td>
              <td>79.1%</td>
              <td>79.6%</td>
              <td>81.4%</td>
              <td>80.1%</td>
              <td>81.6%</td>
              <td>84.4%</td>
              <td>83.9%</td>
              <td>84.9%</td>
              <td>86.5%</td>
              <td>86.2%</td>
              <td>85.7%</td>
              <td>85.4%</td>
            </tr>
            <tr>
              <td>Overall Efficiency</td>
              <td>78.59%</td>
              <td>78.78%</td>
              <td>80.30%</td>
              <td>78.95%</td>
              <td>80.32%</td>
              <td>83.08%</td>
              <td>82.54%</td>
              <td>83.67%</td>
              <td>85.02%</td>
              <td>84.99%</td>
              <td>84.56%</td>
              <td>84.54%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A8.</bold>Quality of supply.</p>
      <table-wrap id="tbl15">
        <label>Table 15</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Energy Not Supplied (MWh)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>HV</td>
              <td>
              </td>
              <td>
              </td>
              <td>8153</td>
              <td>6594</td>
              <td>8029</td>
              <td>6800</td>
              <td>5732</td>
              <td>19,167</td>
              <td>15,619</td>
              <td>20,080</td>
              <td>13,656</td>
              <td>10,851</td>
            </tr>
            <tr>
              <td>MV</td>
              <td>
              </td>
              <td>
              </td>
              <td>13,571</td>
              <td>10,995</td>
              <td>90,078</td>
              <td>9569</td>
              <td>9683</td>
              <td>13,520</td>
              <td>12,253</td>
              <td>14,289</td>
              <td>15,265</td>
              <td>17,308</td>
            </tr>
            <tr>
              <td>Other</td>
              <td>
              </td>
              <td>
              </td>
              <td>2208</td>
              <td>3702</td>
              <td>3739</td>
              <td>2180</td>
              <td>1816</td>
              <td>9308</td>
              <td>6948</td>
              <td>4459</td>
              <td>8801</td>
              <td>1068</td>
            </tr>
            <tr>
              <td>
                <bold>Total Energy Not Supplied</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>23,932</td>
              <td>21,290</td>
              <td>20,847</td>
              <td>18,549</td>
              <td>17,231</td>
              <td>41,995</td>
              <td>34,820</td>
              <td>38,828</td>
              <td>37,723</td>
              <td>29,227</td>
            </tr>
            <tr>
              <td>
                <bold>Energy Not Supplied by Network Level (%)</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>HV</td>
              <td>
              </td>
              <td>
              </td>
              <td>34%</td>
              <td>31%</td>
              <td>39%</td>
              <td>37%</td>
              <td>33%</td>
              <td>46%</td>
              <td>45%</td>
              <td>52%</td>
              <td>36%</td>
              <td>37%</td>
            </tr>
            <tr>
              <td>MV</td>
              <td>
              </td>
              <td>
              </td>
              <td>57%</td>
              <td>52%</td>
              <td>44%</td>
              <td>52%</td>
              <td>56%</td>
              <td>32%</td>
              <td>35%</td>
              <td>37%</td>
              <td>40%</td>
              <td>59%</td>
            </tr>
            <tr>
              <td>Other</td>
              <td>
              </td>
              <td>
              </td>
              <td>9%</td>
              <td>17%</td>
              <td>18%</td>
              <td>12%</td>
              <td>11%</td>
              <td>22%</td>
              <td>20%</td>
              <td>11%</td>
              <td>23%</td>
              <td>4%</td>
            </tr>
            <tr>
              <td>Average Outage Duration (hours)</td>
              <td>40.0</td>
              <td>44.6</td>
              <td>27.7</td>
              <td>23.8</td>
              <td>22.3</td>
              <td>18.6</td>
              <td>16.4</td>
              <td>17.9</td>
              <td>29.9</td>
              <td>29.4</td>
              <td>26.2</td>
              <td>18.6</td>
            </tr>
            <tr>
              <td>System Average Interruption Duration Index (SAIDI), hour</td>
              <td>
              </td>
              <td>58.1</td>
              <td>14.6</td>
              <td>16.4</td>
              <td>14.7</td>
              <td>12.5</td>
              <td>10.8</td>
              <td>ND</td>
              <td>19.6</td>
              <td>19.5</td>
              <td>17.6</td>
              <td>10.0</td>
            </tr>
            <tr>
              <td>System Average Interruption Frequency Index (SAIFI)</td>
              <td>
              </td>
              <td>42</td>
              <td>24</td>
              <td>21</td>
              <td>18</td>
              <td>18</td>
              <td>20</td>
              <td>ND</td>
              <td>23</td>
              <td>22</td>
              <td>22</td>
              <td>18</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A9.</bold>Customer growth.</p>
      <table-wrap id="tbl16">
        <label>Table 16</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Number of</bold>
                <bold>Customers</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Low Voltage</bold>
              </td>
              <td>1,311,741</td>
              <td>1,428,317</td>
              <td>1,626,653</td>
              <td>1,892,711</td>
              <td>2,191,290</td>
              <td>2,532,418</td>
              <td>2,909,633</td>
              <td>3,248,556</td>
              <td>3,639,780</td>
              <td>4,040,965</td>
              <td>4,580,256</td>
              <td>5,271,162</td>
            </tr>
            <tr>
              <td>Including PEPT</td>
              <td>196</td>
              <td>31,808</td>
              <td>175,561</td>
              <td>359,508</td>
              <td>565,039</td>
              <td>768,030</td>
              <td>1,022,856</td>
              <td>1,225,646</td>
              <td>1,476,779</td>
              <td>1,738,457</td>
              <td>2,157,047</td>
              <td>2,118,649</td>
            </tr>
            <tr>
              <td>High Voltage</td>
              <td>4096</td>
              <td>4462</td>
              <td>4790</td>
              <td>5115</td>
              <td>5435</td>
              <td>5736</td>
              <td>6055</td>
              <td>6412</td>
              <td>6939</td>
              <td>7594</td>
              <td>7696</td>
              <td>8121</td>
            </tr>
            <tr>
              <td>National</td>
              <td>1,315,837</td>
              <td>1,432,779</td>
              <td>1,631,443</td>
              <td>1,897,826</td>
              <td>2,196,725</td>
              <td>2,538,154</td>
              <td>2,915,688</td>
              <td>3,254,968</td>
              <td>3,646,619</td>
              <td>4,048,259</td>
              <td>4,587,952</td>
              <td>5,282,283</td>
            </tr>
            <tr>
              <td>
                <bold>Change (%)</bold>
              </td>
              <td>7.5%</td>
              <td>8.9%</td>
              <td>13.9%</td>
              <td>16.3%</td>
              <td>157%</td>
              <td>15.5%</td>
              <td>14.9%</td>
              <td>11.6%</td>
              <td>12.0%</td>
              <td>11.0%</td>
              <td>13.3%</td>
              <td>15.1%</td>
            </tr>
            <tr>
              <td>
                <bold>PEPT</bold>
                <bold>Contribution to Growth in</bold>
                <bold>the Number of Low-Voltage</bold>
                <bold>Customers (%)</bold>
              </td>
              <td>
              </td>
              <td>2.4%</td>
              <td>10.1%</td>
              <td>11.3%</td>
              <td>10.9%</td>
              <td>9.3%</td>
              <td>10.1%</td>
              <td>7.0%</td>
              <td>7.7%</td>
              <td>7.2%</td>
              <td>10.4%</td>
              <td>12.3%</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A10.</bold> Number of customers by tariff category.</p>
      <table-wrap id="tbl17">
        <label>Table 17</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Low Voltage</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Social Residential</td>
              <td>519,146</td>
              <td>543,926</td>
              <td>592,189</td>
              <td>714,685</td>
              <td>833,744</td>
              <td>1,060,860</td>
              <td>1,285,308</td>
              <td>1,539,531</td>
              <td>1,857,410</td>
              <td>2,058,971</td>
              <td>2475,655</td>
              <td>3,040,093</td>
            </tr>
            <tr>
              <td>General Residential 5A</td>
              <td>363,513</td>
              <td>414,647</td>
              <td>475,543</td>
              <td>516,513</td>
              <td>553,560</td>
              <td>586,998</td>
              <td>617,603</td>
              <td>604,040</td>
              <td>581,166</td>
              <td>55,644</td>
              <td>521,222</td>
              <td>467,479</td>
            </tr>
            <tr>
              <td>General Residential</td>
              <td>276,528</td>
              <td>306,661</td>
              <td>389,766</td>
              <td>482,621</td>
              <td>609,665</td>
              <td>682,826</td>
              <td>781,102</td>
              <td>866,854</td>
              <td>962,282</td>
              <td>1,181,846</td>
              <td>1,329,831</td>
              <td>1,503,878</td>
            </tr>
            <tr>
              <td>General Business</td>
              <td>138,083</td>
              <td>147,500</td>
              <td>152,777</td>
              <td>161,897</td>
              <td>176,528</td>
              <td>182,564</td>
              <td>205,181</td>
              <td>212,401</td>
              <td>215,351</td>
              <td>218,730</td>
              <td>226,952</td>
              <td>234,283</td>
            </tr>
            <tr>
              <td>Contract Tariff</td>
              <td>5062</td>
              <td>5386</td>
              <td>5506</td>
              <td>5654</td>
              <td>5820</td>
              <td>5965</td>
              <td>6865</td>
              <td>5973</td>
              <td>6025</td>
              <td>6136</td>
              <td>6296</td>
              <td>6442</td>
            </tr>
            <tr>
              <td>Public Lighting</td>
              <td>8104</td>
              <td>8822</td>
              <td>9446</td>
              <td>9807</td>
              <td>10,369</td>
              <td>11,557</td>
              <td>12,787</td>
              <td>14,044</td>
              <td>15,831</td>
              <td>17,158</td>
              <td>18,621</td>
              <td>20,200</td>
            </tr>
            <tr>
              <td>Free Service</td>
              <td>1306</td>
              <td>1375</td>
              <td>1426</td>
              <td>1434</td>
              <td>1604</td>
              <td>1648</td>
              <td>787</td>
              <td>1713</td>
              <td>1715</td>
              <td>1680</td>
              <td>1679</td>
              <td>1787</td>
            </tr>
            <tr>
              <td>
                <bold>Total Low</bold>
                <bold>Voltage</bold>
              </td>
              <td>1,311,741</td>
              <td>1,428,317</td>
              <td>1,626,653</td>
              <td>1,892,711</td>
              <td>2,191,290</td>
              <td>2,532,418</td>
              <td>2,909,633</td>
              <td>3,248,556</td>
              <td>3,639,780</td>
              <td>4,040,965</td>
              <td>4,580,256</td>
              <td>5,274,262</td>
            </tr>
            <tr>
              <td>
                <bold>High Voltage</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>Short Use</td>
              <td>62</td>
              <td>67</td>
              <td>66</td>
              <td>61</td>
              <td>58</td>
              <td>60</td>
              <td>59</td>
              <td>57</td>
              <td>62</td>
              <td>57</td>
              <td>52</td>
              <td>54</td>
            </tr>
            <tr>
              <td>General Use</td>
              <td>3780</td>
              <td>4138</td>
              <td>4458</td>
              <td>4788</td>
              <td>5110</td>
              <td>5346</td>
              <td>5644</td>
              <td>5992</td>
              <td>6402</td>
              <td>6861</td>
              <td>7260</td>
              <td>7684</td>
            </tr>
            <tr>
              <td>Long Use</td>
              <td>199</td>
              <td>206</td>
              <td>214</td>
              <td>208</td>
              <td>207</td>
              <td>268</td>
              <td>293</td>
              <td>300</td>
              <td>310</td>
              <td>309</td>
              <td>312</td>
              <td>312</td>
            </tr>
            <tr>
              <td>Free Service</td>
              <td>48</td>
              <td>49</td>
              <td>49</td>
              <td>56</td>
              <td>58</td>
              <td>59</td>
              <td>55</td>
              <td>59</td>
              <td>61</td>
              <td>61</td>
              <td>65</td>
              <td>64</td>
            </tr>
            <tr>
              <td>High Voltage</td>
              <td>2</td>
              <td>2</td>
              <td>2</td>
              <td>2</td>
              <td>2</td>
              <td>3</td>
              <td>4</td>
              <td>4</td>
              <td>4</td>
              <td>6</td>
              <td>7</td>
              <td>7</td>
            </tr>
            <tr>
              <td>Special Textile Complex</td>
              <td>5</td>
              <td>0</td>
              <td>1</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
              <td>0</td>
            </tr>
            <tr>
              <td>
                <bold>Total High</bold>
                <bold>Voltage</bold>
              </td>
              <td>4096</td>
              <td>4462</td>
              <td>4790</td>
              <td>5115</td>
              <td>5435</td>
              <td>5736</td>
              <td>6055</td>
              <td>6412</td>
              <td>6839</td>
              <td>7294</td>
              <td>7696</td>
              <td>8121</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
      <p><bold>Table A11.</bold>Number of customers by regional directorate (RD).</p>
      <table-wrap id="tbl18">
        <label>Table 18</label>
        <table>
          <tbody>
            <tr>
              <td>
                <bold>Items</bold>
              </td>
              <td>2014</td>
              <td>2015</td>
              <td>2016</td>
              <td>2017</td>
              <td>2018</td>
              <td>2019</td>
              <td>2020</td>
              <td>2021</td>
              <td>2022</td>
              <td>2023</td>
              <td>2024</td>
              <td>2025</td>
            </tr>
            <tr>
              <td>
                <bold>Abidjan</bold>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>DRAS</td>
              <td>122,349</td>
              <td>128,571</td>
              <td>175,918</td>
              <td>248,901</td>
              <td>306,538</td>
              <td>333,820</td>
              <td>347,491</td>
              <td>359,893</td>
              <td>375,152</td>
              <td>393,902</td>
              <td>409,709</td>
              <td>420,660</td>
            </tr>
            <tr>
              <td>DRYOP</td>
              <td>182,898</td>
              <td>197,959</td>
              <td>232,361</td>
              <td>276,302</td>
              <td>329,484</td>
              <td>367,765</td>
              <td>383,579</td>
              <td>402,878</td>
              <td>422,508</td>
              <td>442,869</td>
              <td>458,916</td>
              <td>480,564</td>
            </tr>
            <tr>
              <td>DRAN</td>
              <td>166,305</td>
              <td>182,620</td>
              <td>223,667</td>
              <td>251,780</td>
              <td>288,683</td>
              <td>327,797</td>
              <td>348,360</td>
              <td>374,490</td>
              <td>404,258</td>
              <td>434,480</td>
              <td>466,121</td>
              <td>495,218</td>
            </tr>
            <tr>
              <td>DRABO</td>
              <td>118,021</td>
              <td>153,666</td>
              <td>173,956</td>
              <td>203,360</td>
              <td>235,829</td>
              <td>290,470</td>
              <td>314,831</td>
              <td>345,343</td>
              <td>373,824</td>
              <td>406,237</td>
              <td>434,231</td>
              <td>470,861</td>
            </tr>
            <tr>
              <td>
                <bold>Total</bold>
                <bold>Abidjan</bold>
              </td>
              <td>589,573</td>
              <td>662,816</td>
              <td>805,902</td>
              <td>980,343</td>
              <td>1,160,354</td>
              <td>1,319,852</td>
              <td>1,394,261</td>
              <td>1,482,604</td>
              <td>1,575,742</td>
              <td>1,677,488</td>
              <td>1,768,977</td>
              <td>1,867,303</td>
            </tr>
            <tr>
              <td>Inland Regions</td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
              <td>
              </td>
            </tr>
            <tr>
              <td>DRE</td>
              <td>84,455</td>
              <td>95,736</td>
              <td>102,306</td>
              <td>115,774</td>
              <td>129,995</td>
              <td>153,570</td>
              <td>193,311</td>
              <td>212,381</td>
              <td>233,399</td>
              <td>256,932</td>
              <td>295,552</td>
              <td>356,014</td>
            </tr>
            <tr>
              <td>DRSO</td>
              <td>130,489</td>
              <td>140,587</td>
              <td>116,624</td>
              <td>128,794</td>
              <td>140,699</td>
              <td>161,432</td>
              <td>196,948</td>
              <td>237,353</td>
              <td>280,788</td>
              <td>312,193</td>
              <td>362,828</td>
              <td>431,788</td>
            </tr>
            <tr>
              <td>DRLO</td>
              <td>
              </td>
              <td>
              </td>
              <td>33,951</td>
              <td>36,906</td>
              <td>39,691</td>
              <td>57,259</td>
              <td>85,928</td>
              <td>104,590</td>
              <td>117,426</td>
              <td>156,950</td>
              <td>161,946</td>
              <td>205,438</td>
            </tr>
            <tr>
              <td>DRBC</td>
              <td>84,597</td>
              <td>64,278</td>
              <td>67,069</td>
              <td>69,980</td>
              <td>81,089</td>
              <td>91,799</td>
              <td>113,766</td>
              <td>124,237</td>
              <td>136,819</td>
              <td>186,703</td>
              <td>195,538</td>
              <td>234,306</td>
            </tr>
            <tr>
              <td>DRSE</td>
              <td>59,763</td>
              <td>64,002</td>
              <td>68,965</td>
              <td>74,196</td>
              <td>82,317</td>
              <td>95,789</td>
              <td>120,543</td>
              <td>138,491</td>
              <td>162,462</td>
              <td>133,178</td>
              <td>217,182</td>
              <td>251,986</td>
            </tr>
            <tr>
              <td>DRC</td>
              <td>80,142</td>
              <td>87,909</td>
              <td>90,202</td>
              <td>98,091</td>
              <td>105,493</td>
              <td>120,690</td>
              <td>158,271</td>
              <td>189,284</td>
              <td>22,921</td>
              <td>256,428</td>
              <td>302,519</td>
              <td>357,376</td>
            </tr>
            <tr>
              <td>DRCO</td>
              <td>76,601</td>
              <td>84,670</td>
              <td>94,562</td>
              <td>104,916</td>
              <td>114,750</td>
              <td>130,819</td>
              <td>161,085</td>
              <td>204,004</td>
              <td>254,409</td>
              <td>290,941</td>
              <td>342,360</td>
              <td>415,699</td>
            </tr>
            <tr>
              <td>DRN</td>
              <td>69,562</td>
              <td>76,094</td>
              <td>81,543</td>
              <td>98,525</td>
              <td>121,661</td>
              <td>151,475</td>
              <td>187,494</td>
              <td>218,321</td>
              <td>260,445</td>
              <td>307,740</td>
              <td>373,157</td>
              <td>457,263</td>
            </tr>
            <tr>
              <td>DRO</td>
              <td>58,518</td>
              <td>64,075</td>
              <td>67,525</td>
              <td>75,636</td>
              <td>86,733</td>
              <td>99,866</td>
              <td>113,834</td>
              <td>139,110</td>
              <td>180,654</td>
              <td>211,977</td>
              <td>258,059</td>
              <td>340,974</td>
            </tr>
            <tr>
              <td>DRCS</td>
              <td>82,518</td>
              <td>92,612</td>
              <td>102,794</td>
              <td>114,665</td>
              <td>133,763</td>
              <td>155,603</td>
              <td>190,347</td>
              <td>204,593</td>
              <td>221,554</td>
              <td>257,729</td>
              <td>309,834</td>
              <td>364,136</td>
            </tr>
            <tr>
              <td>
                <bold>Total Inland Regions</bold>
              </td>
              <td>726,264</td>
              <td>769,963</td>
              <td>825,541</td>
              <td>917,483</td>
              <td>1,036,191</td>
              <td>1,218,302</td>
              <td>1,521,427</td>
              <td>1,772,364</td>
              <td>2,070,877</td>
              <td>2,370,771</td>
              <td>2,818,975</td>
              <td>3,414,980</td>
            </tr>
            <tr>
              <td>
                <bold>National</bold>
              </td>
              <td>1,315,837</td>
              <td>1,432,779</td>
              <td>1,631,443</td>
              <td>1,897,826</td>
              <td>2,196,725</td>
              <td>2,538,154</td>
              <td>2,915,688</td>
              <td>3,254,968</td>
              <td>3,646,619</td>
              <td>4,048,259</td>
              <td>4,587,952</td>
              <td>5,282,283</td>
            </tr>
          </tbody>
        </table>
      </table-wrap>
    </sec>
  </body>
  <back>
    <ref-list>
      <title>References</title>
      <ref id="B1">
        <label>1.</label>
        <citation-alternatives>
          <mixed-citation publication-type="web">International Energy Agency (2025) Electricity 2025: Analysis and Forecast to 2027. IEA. https://www.iea.org/reports/electricity-2025</mixed-citation>
          <element-citation publication-type="web">
            <year>2025</year>
            <article-title>Electricity 2025: Analysis and Forecast to 2027</article-title>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B2">
        <label>2.</label>
        <citation-alternatives>
          <mixed-citation publication-type="web">Direction Générale du Trésor (2025) Situation économique et financière de la Côte d’Ivoire. Ministère de l’Économie, des Finances et de la Souveraineté industrielle et numérique. https://www.tresor.economie.gouv.fr/Pays/CI/situation-economique-et-financiere</mixed-citation>
          <element-citation publication-type="web">
            <year>2025</year>
            <article-title>Situation économique et financière de la Côte d’Ivoire</article-title>
            <source>Ministère de l’Économie</source>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B3">
        <label>3.</label>
        <citation-alternatives>
          <mixed-citation publication-type="web">West African Power Pool (2019) ECOWAS Master Plan for the Development of Regional Power Generation and Transmission Infrastructure 2019-2033: Synthesis. WAPP. https://www.ecowapp.org/sites/default/files/volume_0.pdf</mixed-citation>
          <element-citation publication-type="web">
            <year>2019</year>
            <article-title>ECOWAS Master Plan for the Development of Regional Power Generation and Transmission Infrastructure 2019-2033: Synthesis</article-title>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B4">
        <label>4.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Elabbas, M.A.E., de Vries, L. and Correljé, A. (2023) African Power Pools and Regional Electricity Market Design: Taking Stock of Regional Integration in Energy Sectors. <italic>Energy Research &amp; Social Science</italic>, 105, Article ID: 103291. https://doi.org/10.1016/j.erss.2023.103291 <pub-id pub-id-type="doi">10.1016/j.erss.2023.103291</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.erss.2023.103291">https://doi.org/10.1016/j.erss.2023.103291</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Elabbas, M.A.E.</string-name>
              <string-name>Vries, L.</string-name>
            </person-group>
            <year>2023</year>
            <article-title>African Power Pools and Regional Electricity Market Design: Taking Stock of Regional Integration in Energy Sectors</article-title>
            <source>Energy Research &amp; Social Science</source>
            <volume>105</volume>
            <fpage>103291</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.erss.2023.103291</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B5">
        <label>5.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Bissiri, M., Moura, P., Perez, R.C., Figueiredo, N.C. and da Silva, P.P. (2024) Generation Capacity Expansion Planning with Spatially-Resolved Electricity Demand and Increasing Variable Renewable Energy Supply: Perspectives from Power Pooling in West Africa. <italic>Applied Energy</italic>, 364, Article ID: 123115. https://doi.org/10.1016/j.apenergy.2024.123115 <pub-id pub-id-type="doi">10.1016/j.apenergy.2024.123115</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.apenergy.2024.123115">https://doi.org/10.1016/j.apenergy.2024.123115</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Bissiri, M.</string-name>
              <string-name>Moura, P.</string-name>
              <string-name>Perez, R.C.</string-name>
              <string-name>Figueiredo, N.C.</string-name>
              <string-name>Silva, P.P.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Generation Capacity Expansion Planning with Spatially-Resolved Electricity Demand and Increasing Variable Renewable Energy Supply: Perspectives from Power Pooling in West Africa</article-title>
            <source>Applied Energy</source>
            <volume>364</volume>
            <fpage>123115</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.apenergy.2024.123115</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B6">
        <label>6.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Correa-Posada, C.M. and Sanchez-Martin, P. (2014) Security-Constrained Optimal Power and Natural-Gas Flow. <italic>IEEE Transactions on Power Systems</italic>, 29, 1780-1787. https://doi.org/10.1109/tpwrs.2014.2299714 <pub-id pub-id-type="doi">10.1109/tpwrs.2014.2299714</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1109/tpwrs.2014.2299714">https://doi.org/10.1109/tpwrs.2014.2299714</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Correa-Posada, C.M.</string-name>
              <string-name>Sanchez-Martin, P.</string-name>
            </person-group>
            <year>2014</year>
            <article-title>Security-Constrained Optimal Power and Natural-Gas Flow</article-title>
            <source>IEEE Transactions on Power Systems</source>
            <volume>29</volume>
            <pub-id pub-id-type="doi">10.1109/tpwrs.2014.2299714</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B7">
        <label>7.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Falchetta, G., Gernaat, D.E.H.J., Hunt, J. and Sterl, S. (2019) Hydropower Dependency and Climate Change in Sub-Saharan Africa: A Nexus Framework and Evidence-Based Review. <italic>Journal of Cleaner Production</italic>, 231, 1399-1417. https://doi.org/10.1016/j.jclepro.2019.05.263 <pub-id pub-id-type="doi">10.1016/j.jclepro.2019.05.263</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.jclepro.2019.05.263">https://doi.org/10.1016/j.jclepro.2019.05.263</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Falchetta, G.</string-name>
              <string-name>Gernaat, D.E.H.J.</string-name>
              <string-name>Hunt, J.</string-name>
              <string-name>Sterl, S.</string-name>
            </person-group>
            <year>2019</year>
            <article-title>Hydropower Dependency and Climate Change in Sub-Saharan Africa: A Nexus Framework and Evidence-Based Review</article-title>
            <source>Journal of Cleaner Production</source>
            <volume>231</volume>
            <pub-id pub-id-type="doi">10.1016/j.jclepro.2019.05.263</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B8">
        <label>8.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Kanyako, F., Lamontagne, J., Baker, E., Turner, S. and Wild, T. (2023) Seasonality and Trade in Hydro-Heavy Electricity Markets: A Case Study with the West Africa Power Pool (WAPP). <italic>Applied Energy</italic>, 329, Article ID: 120214. https://doi.org/10.1016/j.apenergy.2022.120214 <pub-id pub-id-type="doi">10.1016/j.apenergy.2022.120214</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.apenergy.2022.120214">https://doi.org/10.1016/j.apenergy.2022.120214</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Kanyako, F.</string-name>
              <string-name>Lamontagne, J.</string-name>
              <string-name>Baker, E.</string-name>
              <string-name>Turner, S.</string-name>
              <string-name>Wild, T.</string-name>
            </person-group>
            <year>2023</year>
            <article-title>Seasonality and Trade in Hydro-Heavy Electricity Markets: A Case Study with the West Africa Power Pool (WAPP)</article-title>
            <source>Applied Energy</source>
            <volume>329</volume>
            <fpage>120214</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.apenergy.2022.120214</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B9">
        <label>9.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Assoumou, E. and McIsaac, F. (2022) Côte D’ivoire’s Electricity Challenge in 2050: Reconciling Economic Development and Climate Commitments. <italic>Energy Policy</italic>, 160, Article ID: 112681. https://doi.org/10.1016/j.enpol.2021.112681 <pub-id pub-id-type="doi">10.1016/j.enpol.2021.112681</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.enpol.2021.112681">https://doi.org/10.1016/j.enpol.2021.112681</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Assoumou, E.</string-name>
              <string-name>McIsaac, F.</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Côte D’ivoire’s Electricity Challenge in 2050: Reconciling Economic Development and Climate Commitments</article-title>
            <source>Energy Policy</source>
            <volume>160</volume>
            <fpage>112681</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.enpol.2021.112681</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B10">
        <label>10.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Yeo, W.M. (2024) A Political Economy Analysis of the Electricity Sector in Côte d’Ivoire. <italic>Energy Research &amp; Social Science</italic>, 118, Article ID: 103833. https://doi.org/10.1016/j.erss.2024.103833 <pub-id pub-id-type="doi">10.1016/j.erss.2024.103833</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.erss.2024.103833">https://doi.org/10.1016/j.erss.2024.103833</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Yeo, W.M.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>A Political Economy Analysis of the Electricity Sector in Côte d’Ivoire</article-title>
            <source>Energy Research &amp; Social Science</source>
            <volume>118</volume>
            <fpage>103833</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.erss.2024.103833</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B11">
        <label>11.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Koranteng Nkansah, H., Suleman, S., Ackah, I., Amarh, B.A., Eduah, D. and Jinapor, J.A. (2022) Determinants of Electricity Demand in Cote d’Ivoire, Ghana, Nigeria and Senegal. <italic>Energies</italic>, 15, Article No. 4998. https://doi.org/10.3390/en15144998 <pub-id pub-id-type="doi">10.3390/en15144998</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3390/en15144998">https://doi.org/10.3390/en15144998</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Nkansah, H.</string-name>
              <string-name>Suleman, S.</string-name>
              <string-name>Ackah, I.</string-name>
              <string-name>Amarh, B.A.</string-name>
              <string-name>Eduah, D.</string-name>
              <string-name>Jinapor, J.A.</string-name>
              <string-name>Ivoire, G</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Determinants of Electricity Demand in Cote d’Ivoire, Ghana, Nigeria and Senegal</article-title>
            <source>Energies</source>
            <volume>15</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.3390/en15144998</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B12">
        <label>12.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Asantewaa, A., Jamasb, T. and Llorca, M. (2022) Electricity Sector Reform Performance in Sub-Saharan Africa: A Parametric Distance Function Approach. <italic>Energies</italic>, 15, Article No. 2047. https://doi.org/10.3390/en15062047 <pub-id pub-id-type="doi">10.3390/en15062047</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3390/en15062047">https://doi.org/10.3390/en15062047</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Asantewaa, A.</string-name>
              <string-name>Jamasb, T.</string-name>
              <string-name>Llorca, M.</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Electricity Sector Reform Performance in Sub-Saharan Africa: A Parametric Distance Function Approach</article-title>
            <source>Energies</source>
            <volume>15</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.3390/en15062047</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B13">
        <label>13.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Bissiri, M., Moura, P., Figueiredo, N.C. and Silva, P.P. (2020) Towards a Renewables-Based Future for West African States: A Review of Power Systems Planning Approaches. <italic>Renewable and Sustainable Energy Reviews</italic>, 134, Article ID: 110019. https://doi.org/10.1016/j.rser.2020.110019 <pub-id pub-id-type="doi">10.1016/j.rser.2020.110019</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.rser.2020.110019">https://doi.org/10.1016/j.rser.2020.110019</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Bissiri, M.</string-name>
              <string-name>Moura, P.</string-name>
              <string-name>Figueiredo, N.C.</string-name>
              <string-name>Silva, P.P.</string-name>
            </person-group>
            <year>2020</year>
            <article-title>Towards a Renewables-Based Future for West African States: A Review of Power Systems Planning Approaches</article-title>
            <source>Renewable and Sustainable Energy Reviews</source>
            <volume>134</volume>
            <fpage>110019</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.rser.2020.110019</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B14">
        <label>14.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Carvallo, J.P., Zhang, N., Leibowicz, B.D., Carr, T., Baik, S. and Larsen, P.H. (2023) A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions. Lawrence Berkeley National Laboratory.</mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Carvallo, J.P.</string-name>
              <string-name>Zhang, N.</string-name>
              <string-name>Leibowicz, B.D.</string-name>
              <string-name>Carr, T.</string-name>
              <string-name>Baik, S.</string-name>
              <string-name>Larsen, P.H.</string-name>
            </person-group>
            <year>2023</year>
            <article-title>A Guide for Improved Resource Adequacy Assessments in Evolving Power Systems: Institutional and Technical Dimensions</article-title>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B15">
        <label>15.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Mantegna, G., Huang, Z., Van Caelenberg, G., Frew, B., Lynch, M. and O’Malley, M. (2026) Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning. <italic>IE</italic><italic>EE Transactions on Energy Markets</italic>, <italic>Policy and Regulation</italic>, 4, 1-9. https://doi.org/10.1109/tempr.2025.3640116 <pub-id pub-id-type="doi">10.1109/tempr.2025.3640116</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1109/tempr.2025.3640116">https://doi.org/10.1109/tempr.2025.3640116</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Mantegna, G.</string-name>
              <string-name>Huang, Z.</string-name>
              <string-name>Caelenberg, G.</string-name>
              <string-name>Frew, B.</string-name>
              <string-name>Lynch, M.</string-name>
              <string-name>Malley, M.</string-name>
              <string-name>Markets, P</string-name>
            </person-group>
            <year>2026</year>
            <article-title>Electric Grid Reliability in an Era of Unprecedented Uncertainty: A Review of Advances in Electric Sector Resource Adequacy Assessment and Planning</article-title>
            <source>IEEE Transactions on Energy Markets</source>
            <volume>4</volume>
            <pub-id pub-id-type="doi">10.1109/tempr.2025.3640116</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B16">
        <label>16.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Dagnachew, A.G., Choi, S. and Falchetta, G. (2023) Energy Planning in Sub-Saharan African Countries Needs to Explicitly Consider Productive Uses of Electricity. <italic>Scientific Reports</italic>, 13, Article No. 13007. https://doi.org/10.1038/s41598-023-40021-y <pub-id pub-id-type="doi">10.1038/s41598-023-40021-y</pub-id><pub-id pub-id-type="pmid">37563234</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1038/s41598-023-40021-y">https://doi.org/10.1038/s41598-023-40021-y</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Dagnachew, A.G.</string-name>
              <string-name>Choi, S.</string-name>
              <string-name>Falchetta, G.</string-name>
            </person-group>
            <year>2023</year>
            <article-title>Energy Planning in Sub-Saharan African Countries Needs to Explicitly Consider Productive Uses of Electricity</article-title>
            <source>Scientific Reports</source>
            <volume>13</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.1038/s41598-023-40021-y</pub-id>
            <pub-id pub-id-type="pmid">37563234</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B17">
        <label>17.</label>
        <citation-alternatives>
          <mixed-citation publication-type="web">International Finance Corporation (2023) IFC Invests in PEPT’s First Securitization to Support Access to Electricity in Côte d’Ivoire. https://www.ifc.org/en/pressroom/2023/ifc-invests-in-pepts-first-securitization-to-support-access-to-e</mixed-citation>
          <element-citation publication-type="web">
            <year>2023</year>
            <article-title>IFC Invests in PEPT’s First Securitization to Support Access to Electricity in Côte d’Ivoire</article-title>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B18">
        <label>18.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">McCluskey, A., Strzepek, K.M. and Rose, A. (2022) Electricity Trade Impacts on Regional Power Pools in Sub-Saharan Africa. <italic>Renewable Energy Focus</italic>, 41, 33-54. https://doi.org/10.1016/j.ref.2022.01.001 <pub-id pub-id-type="doi">10.1016/j.ref.2022.01.001</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.ref.2022.01.001">https://doi.org/10.1016/j.ref.2022.01.001</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>McCluskey, A.</string-name>
              <string-name>Strzepek, K.M.</string-name>
              <string-name>Rose, A.</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Electricity Trade Impacts on Regional Power Pools in Sub-Saharan Africa</article-title>
            <source>Renewable Energy Focus</source>
            <volume>41</volume>
            <pub-id pub-id-type="doi">10.1016/j.ref.2022.01.001</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B19">
        <label>19.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Bissiri, M., Pereira da Silva, P., Moura, P. and Figueiredo, N.C. (2024) Are West Africa’s Policy, Planning, and Regulatory Frameworks Missing the Harmonization Piece of the Power Pooling-Renewable Energy Puzzle? <italic>Energy Policy</italic>, 190, Article ID: 114161. https://doi.org/10.1016/j.enpol.2024.114161 <pub-id pub-id-type="doi">10.1016/j.enpol.2024.114161</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.enpol.2024.114161">https://doi.org/10.1016/j.enpol.2024.114161</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Bissiri, M.</string-name>
              <string-name>Silva, P.</string-name>
              <string-name>Moura, P.</string-name>
              <string-name>Figueiredo, N.C.</string-name>
              <string-name>Policy, P</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Are West Africa’s Policy, Planning, and Regulatory Frameworks Missing the Harmonization Piece of the Power Pooling-Renewable Energy Puzzle? Energy Policy, 190, Article ID: 114161</article-title>
            <fpage>114161</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.enpol.2024.114161</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B20">
        <label>20.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Odetayo, B. and Walsh, M. (2021) A Policy Perspective for an Integrated Regional Power Pool within the Africa Continental Free Trade Area. <italic>Energy Policy</italic>, 156, Article ID: 112436. https://doi.org/10.1016/j.enpol.2021.112436 <pub-id pub-id-type="doi">10.1016/j.enpol.2021.112436</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.enpol.2021.112436">https://doi.org/10.1016/j.enpol.2021.112436</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Odetayo, B.</string-name>
              <string-name>Walsh, M.</string-name>
            </person-group>
            <year>2021</year>
            <article-title>A Policy Perspective for an Integrated Regional Power Pool within the Africa Continental Free Trade Area</article-title>
            <source>Energy Policy</source>
            <volume>156</volume>
            <fpage>112436</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.enpol.2021.112436</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B21">
        <label>21.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Amorim, R. and Villarini, G. (2024) Assessing the Performance of Parametric and Non-Parametric Tests for Trend Detection in Partial Duration Time Series. <italic>Journal of Flood</italic><italic>Risk</italic><italic>Management</italic>, 17, e12957. https://doi.org/10.1111/jfr3.12957 <pub-id pub-id-type="doi">10.1111/jfr3.12957</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1111/jfr3.12957">https://doi.org/10.1111/jfr3.12957</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Amorim, R.</string-name>
              <string-name>Villarini, G.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Assessing the Performance of Parametric and Non-Parametric Tests for Trend Detection in Partial Duration Time Series</article-title>
            <source>Journal of Flood Risk Management</source>
            <volume>17</volume>
            <pub-id pub-id-type="doi">10.1111/jfr3.12957</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B22">
        <label>22.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Zhou, J., Deitch, M.J., Grunwald, S. and Screaton, E. (2023) Do the Mann-Kendall Test and Theil-Sen Slope Fail to Inform Trend Significance and Magnitude in Hydrology? <italic>Hydrological Sciences Journal</italic>, 68, 1241-1249. https://doi.org/10.1080/02626667.2023.2212166 <pub-id pub-id-type="doi">10.1080/02626667.2023.2212166</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1080/02626667.2023.2212166">https://doi.org/10.1080/02626667.2023.2212166</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Zhou, J.</string-name>
              <string-name>Deitch, M.J.</string-name>
              <string-name>Grunwald, S.</string-name>
              <string-name>Screaton, E.</string-name>
            </person-group>
            <year>2023</year>
            <article-title>Do the Mann-Kendall Test and Theil-Sen Slope Fail to Inform Trend Significance and Magnitude in Hydrology? Hydrological Sciences Journal, 68, 1241-1249</article-title>
            <pub-id pub-id-type="doi">10.1080/02626667.2023.2212166</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B23">
        <label>23.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Frimpong, B.F., Koranteng, A. and Molkenthin, F. (2022) Analysis of Temperature Variability Utilising Mann-Kendall and Sen’s Slope Estimator Tests in the Accra and Kumasi Metropolises in Ghana. <italic>Environmental Systems Research</italic>, 11, Article No. 24. https://doi.org/10.1186/s40068-022-00269-1 <pub-id pub-id-type="doi">10.1186/s40068-022-00269-1</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1186/s40068-022-00269-1">https://doi.org/10.1186/s40068-022-00269-1</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Frimpong, B.F.</string-name>
              <string-name>Koranteng, A.</string-name>
              <string-name>Molkenthin, F.</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Analysis of Temperature Variability Utilising Mann-Kendall and Sen’s Slope Estimator Tests in the Accra and Kumasi Metropolises in Ghana</article-title>
            <source>Environmental Systems Research</source>
            <volume>11</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.1186/s40068-022-00269-1</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B24">
        <label>24.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Nafil, A., Bouzi, M., Anoune, K. and Ettalabi, N. (2020) Comparative Study of Forecasting Methods for Energy Demand in Morocco. <italic>Energy Reports</italic>, 6, 523-536. https://doi.org/10.1016/j.egyr.2020.09.030 <pub-id pub-id-type="doi">10.1016/j.egyr.2020.09.030</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.egyr.2020.09.030">https://doi.org/10.1016/j.egyr.2020.09.030</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Nafil, A.</string-name>
              <string-name>Bouzi, M.</string-name>
              <string-name>Anoune, K.</string-name>
              <string-name>Ettalabi, N.</string-name>
            </person-group>
            <year>2020</year>
            <article-title>Comparative Study of Forecasting Methods for Energy Demand in Morocco</article-title>
            <source>Energy Reports</source>
            <volume>6</volume>
            <pub-id pub-id-type="doi">10.1016/j.egyr.2020.09.030</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B25">
        <label>25.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Petropoulos, F., Apiletti, D., Assimakopoulos, V., Babai, M.Z., Barrow, D.K., Ben Taieb, S., <italic>et al</italic>. (2022) Forecasting: Theory and Practice. <italic>International Journa</italic><italic>l of Forecasting</italic>, 38, 705-871. https://doi.org/10.1016/j.ijforecast.2021.11.001 <pub-id pub-id-type="doi">10.1016/j.ijforecast.2021.11.001</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.ijforecast.2021.11.001">https://doi.org/10.1016/j.ijforecast.2021.11.001</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Petropoulos, F.</string-name>
              <string-name>Apiletti, D.</string-name>
              <string-name>Assimakopoulos, V.</string-name>
              <string-name>Babai, M.Z.</string-name>
              <string-name>Barrow, D.K.</string-name>
              <string-name>Taieb, S.</string-name>
            </person-group>
            <year>2022</year>
            <article-title>Forecasting: Theory and Practice</article-title>
            <source>International Journal of Forecasting</source>
            <volume>38</volume>
            <pub-id pub-id-type="doi">10.1016/j.ijforecast.2021.11.001</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B26">
        <label>26.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Tillmanns, M., Schöttler, J. and Praktiknjo, A. (2026) A Review of Probabilistic Resource Adequacy Assessments in Power Systems: Methods, Applications, and Future Challenges. <italic>Energy Policy</italic>, 209, Article ID: 114924. https://doi.org/10.1016/j.enpol.2025.114924 <pub-id pub-id-type="doi">10.1016/j.enpol.2025.114924</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.enpol.2025.114924">https://doi.org/10.1016/j.enpol.2025.114924</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Tillmanns, M.</string-name>
              <string-name>Praktiknjo, A.</string-name>
              <string-name>Methods, A</string-name>
            </person-group>
            <year>2026</year>
            <article-title>A Review of Probabilistic Resource Adequacy Assessments in Power Systems: Methods, Applications, and Future Challenges</article-title>
            <source>Energy Policy</source>
            <volume>209</volume>
            <fpage>114924</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.enpol.2025.114924</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B27">
        <label>27.</label>
        <citation-alternatives>
          <mixed-citation publication-type="report">IEEE Std 1366-2022 (2022) IEEE Guide for Electric Power Distribution Reliability Indices. Technical Report, IEEE.</mixed-citation>
          <element-citation publication-type="report">
            <person-group person-group-type="author">
              <string-name>Report, I</string-name>
            </person-group>
            <year>2022</year>
            <article-title>IEEE Guide for Electric Power Distribution Reliability Indices</article-title>
            <source>Technical Report</source>
            <volume>2022</volume>
            <issue>2022</issue>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B28">
        <label>28.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Toukam, D.O., Meyer, J., Adam, M. and Alsmeyer, F. (2026) Scenario Modelling of Sustainable Electricity Pathways in Côte d’Ivoire: An Open-Source System Framework. <italic>International Journal of Sustainable Energy Planning and Management</italic>, 48, 107-123. https://doi.org/10.54337/ijsepm.11265 <pub-id pub-id-type="doi">10.54337/ijsepm.11265</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.54337/ijsepm.11265">https://doi.org/10.54337/ijsepm.11265</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Toukam, D.O.</string-name>
              <string-name>Meyer, J.</string-name>
              <string-name>Adam, M.</string-name>
              <string-name>Alsmeyer, F.</string-name>
            </person-group>
            <year>2026</year>
            <article-title>Scenario Modelling of Sustainable Electricity Pathways in Côte d’Ivoire: An Open-Source System Framework</article-title>
            <source>International Journal of Sustainable Energy Planning and Management</source>
            <volume>48</volume>
            <pub-id pub-id-type="doi">10.54337/ijsepm.11265</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B29">
        <label>29.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Akpahou, R., Mensah, L.D., Quansah, D.A. and Kemausuor, F. (2024) Energy Planning and Modeling Tools for Sustainable Development: A Systematic Literature Review. <italic>Energy Reports</italic>, 11, 830-845. https://doi.org/10.1016/j.egyr.2023.11.043 <pub-id pub-id-type="doi">10.1016/j.egyr.2023.11.043</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.egyr.2023.11.043">https://doi.org/10.1016/j.egyr.2023.11.043</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Akpahou, R.</string-name>
              <string-name>Mensah, L.D.</string-name>
              <string-name>Quansah, D.A.</string-name>
              <string-name>Kemausuor, F.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Energy Planning and Modeling Tools for Sustainable Development: A Systematic Literature Review</article-title>
            <source>Energy Reports</source>
            <volume>11</volume>
            <pub-id pub-id-type="doi">10.1016/j.egyr.2023.11.043</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B30">
        <label>30.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Fields, N., Collier, W., Kiley, F., Caulker, D., Blyth, W., Howells, M., <italic>et al</italic>. (2024) Long-Term Forecasting: A MAED Application for Sierra Leone’s Electricity Demand (2023-2050). <italic>Energies</italic>, 17, Article No. 2878. https://doi.org/10.3390/en17122878 <pub-id pub-id-type="doi">10.3390/en17122878</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3390/en17122878">https://doi.org/10.3390/en17122878</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Fields, N.</string-name>
              <string-name>Collier, W.</string-name>
              <string-name>Kiley, F.</string-name>
              <string-name>Caulker, D.</string-name>
              <string-name>Blyth, W.</string-name>
              <string-name>Howells, M.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Long-Term Forecasting: A MAED Application for Sierra Leone’s Electricity Demand (2023-2050)</article-title>
            <source>Energies</source>
            <volume>17</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.3390/en17122878</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
    </ref-list>
  </back>
</article>