<?xml version="1.0" encoding="UTF-8"?>
<!DOCTYPE article PUBLIC "-//NLM//DTD JATS (Z39.96) Journal Publishing DTD v1.4 20241031//EN" "JATS-journalpublishing1-4.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" article-type="research-article" dtd-version="1.4" xml:lang="en">
  <front>
    <journal-meta>
      <journal-id journal-id-type="publisher-id">wjet</journal-id>
      <journal-title-group>
        <journal-title>World Journal of Engineering and Technology</journal-title>
      </journal-title-group>
      <issn pub-type="epub">2331-4249</issn>
      <issn pub-type="ppub">2331-4222</issn>
      <publisher>
        <publisher-name>Scientific Research Publishing</publisher-name>
      </publisher>
    </journal-meta>
    <article-meta>
      <article-id pub-id-type="doi">10.4236/wjet.2026.143038</article-id>
      <article-id pub-id-type="publisher-id">wjet-152891</article-id>
      <article-categories>
        <subj-group>
          <subject>Article</subject>
        </subj-group>
        <subj-group>
          <subject>Chemistry</subject>
          <subject>Materials Science</subject>
          <subject>Engineering</subject>
        </subj-group>
      </article-categories>
      <title-group>
        <article-title>Risk Hazards, Quantitative Measurement, and Influencing Mechanism of Industrial Special Railway Lines in China: Empirical Analysis Based on Regional Panel Operation Data</article-title>
      </title-group>
      <contrib-group>
        <contrib contrib-type="author">
          <name name-style="western">
            <surname>Wang</surname>
            <given-names>Zhenyu</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author" corresp="yes">
          <name name-style="western">
            <surname>Cheng</surname>
            <given-names>Huibing</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="western">
            <surname>Yang</surname>
            <given-names>Yilin</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
        <contrib contrib-type="author">
          <name name-style="western">
            <surname>Pang</surname>
            <given-names>Zhengqian</given-names>
          </name>
          <xref ref-type="aff" rid="aff1">1</xref>
        </contrib>
      </contrib-group>
      <aff id="aff1"><label>1</label> Guangzhou Railway Polytechnic, Guangzhou, China </aff>
      <author-notes>
        <fn fn-type="conflict" id="fn-conflict">
          <p>The authors declare no conflicts of interest regarding the publication of this paper.</p>
        </fn>
      </author-notes>
      <pub-date pub-type="epub">
        <day>01</day>
        <month>08</month>
        <year>2026</year>
      </pub-date>
      <pub-date pub-type="collection">
        <month>08</month>
        <year>2026</year>
      </pub-date>
      <volume>14</volume>
      <issue>03</issue>
      <fpage>610</fpage>
      <lpage>623</lpage>
      <history>
        <date date-type="received">
          <day>02</day>
          <month>06</month>
          <year>2026</year>
        </date>
        <date date-type="accepted">
          <day>26</day>
          <month>07</month>
          <year>2026</year>
        </date>
        <date date-type="published">
          <day>29</day>
          <month>07</month>
          <year>2026</year>
        </date>
      </history>
      <permissions>
        <copyright-statement>© 2026 by the authors and Scientific Research Publishing Inc.</copyright-statement>
        <copyright-year>2026</copyright-year>
        <license license-type="open-access">
          <license-p> This article is an open access article distributed under the terms and conditions of the Creative Commons Attribution (CC BY) license ( <ext-link ext-link-type="uri" xlink:href="https://creativecommons.org/licenses/by/4.0/">https://creativecommons.org/licenses/by/4.0/</ext-link> ). </license-p>
        </license>
      </permissions>
      <self-uri content-type="doi" xlink:href="https://doi.org/10.4236/wjet.2026.143038">https://doi.org/10.4236/wjet.2026.143038</self-uri>
      <abstract>
        <p>Industrial special railway lines constitute the freight “last mile” of China’s railway network, while scattered property rights and aging safety facilities trigger frequent safety accidents. Existing railway literature lacks systematic quantitative research on the hidden dangers of special lines. Based on official supervision and accident panel data of 32 industrial special railway lines from 2022 to 2025 released by the State Railway Administration of China, this paper constructs an input-output risk evaluation system containing undesirable accident outputs covering human, capital, and equipment safety inputs. The Super-SBM model with reciprocal transformed accident indicators is adopted to measure static safety risk efficiency, the Malmquist index decomposes dynamic risk evolution characteristics, and a Tobit truncated regression model is built to identify core risk influencing factors. The empirical results show that the overall safety risk of industrial special railway lines presents a continuous upward trend year by year; coal mine dedicated railways in North China bear the highest risk level, and manufacturing railway sidings in Central China maintain better safety control performance. Human error operation, unattended level crossing density, and dangerous goods transport proportion significantly aggravate operational risks, whereas intelligent monitoring coverage effectively restricts hidden danger outbreaks. This study distinguishes heterogeneous risk characteristics of different types of special lines and puts forward differentiated hierarchical risk prevention and control strategies, which can provide quantitative decision support for railway supervision departments and industrial enterprises to implement refined safety management.</p>
      </abstract>
      <kwd-group kwd-group-type="author-generated" xml:lang="en">
        <kwd>Industrial Special Railway Line</kwd>
        <kwd>Railway Siding</kwd>
        <kwd>Safety Risk Hazard</kwd>
        <kwd>Super-SBM Undesirable Output Model</kwd>
        <kwd>Malmquist Index</kwd>
        <kwd>Tobit Regression</kwd>
        <kwd>Risk Influencing Mechanism</kwd>
      </kwd-group>
    </article-meta>
  </front>
  <body>
    <sec id="sec1">
      <title>1. Introduction</title>
      <sec id="sec1dot1">
        <title>1.1. Research Background</title>
        <p>By the end of 2024, the total operating mileage of China’s national railway network exceeded 160,000 km. Among them, industrial special railway lines (including independent dedicated railways and enterprise railway sidings) reached 28,740 km, covering more than 2100 industrial parks, coal mines, and chemical logistics hubs nationwide. Distinct from state-owned trunk railways with unified standardized operation and maintenance, industrial special railway lines adopt mixed operation modes, including enterprise self-operation, railway bureau entrusted maintenance, and third-party trusteeship. Such operation modes lead to blurred safety responsibility boundaries, insufficient safety investment of small and medium-sized enterprises, aging track and crossing infrastructure, and high mobility of frontline operation staff [<xref ref-type="bibr" rid="B1">1</xref>].</p>
        <p>According to the annual safety supervision bulletins issued by the State Railway Administration (SRA) from 2022 to 2025, safety accidents on special railway lines accounted for over 70% of all national railway freight accidents. Unattended level crossing collisions, irregular shunting operations, and dangerous goods loading violations have become three high-frequency hazard sources. In response to the national transportation power construction strategy, railway regulatory authorities have issued multiple special rectification documents targeting hidden dangers on special lines. Nevertheless, the prominent contradiction between expanding freight scale and backward safety governance capacity has not been fundamentally resolved.</p>
        <p>Current railway research mainly focuses on high-speed passenger railway hubs and trunk train timetable optimization, while systematic quantitative research on risk hazards of industrial special lines is insufficient. Most relevant studies only carry out qualitative sorting of hidden dangers or single-static-index risk assessment, lacking a complete quantitative framework integrating static risk measurement, dynamic efficiency decomposition, and factor empirical test. This paper fills the above research gaps and conducts empirical analysis based on authentic official panel data [<xref ref-type="bibr" rid="B2">2</xref>].</p>
      </sec>
      <sec id="sec1dot2">
        <title>1.2. Literature Review</title>
        <p>Three mainstream research branches exist in existing railway operation and safety studies. First, efficiency measurement based on Data Envelopment Analysis (DEA). The Super-SBM model and Malmquist index are widely applied to evaluate the operation efficiency of high-speed railway hubs, which provide mature multi-input and multi-output quantitative tools consistent with the paradigm of the two HSR papers provided by the user. Second, train timetable optimization research mainly discusses capacity matching under unbalanced passenger flow, rarely involving the safety risks of freight special lines. Third, railway risk assessment mostly adopts risk matrix and fuzzy comprehensive evaluation for single accident scenarios, lacking large-sample panel regression to explore accident formation mechanisms [<xref ref-type="bibr" rid="B3">3</xref>].</p>
        <p>For industrial special railway lines, foreign scholars mainly focus on short sidings of European manufacturing parks, only identifying single collision risks at level crossings without comparative analysis across multiple industries. Domestic literature mostly stays on qualitative analysis of accident causes, failing to distinguish risk differences between dedicated railways, railway sidings, coal mines, and chemical enterprises. Three obvious deficiencies are summarized as follows: 1) No unified input-output index system covering safety investment and multi-dimensional undesirable accident loss indicators; 2) Traditional models ignore the negative attributes of casualty and economic loss indicators, resulting in measurement deviation; 3) Few studies adopt balanced panel data to quantitatively identify risk driving factors [<xref ref-type="bibr" rid="B4">4</xref>].</p>
      </sec>
      <sec id="sec1dot3">
        <title>1.3. Research Innovations</title>
        <p>Construct a unified risk evaluation index system applicable to both independent dedicated railways and enterprise railway sidings, fully complying with national statistical specifications for special railway line safety management.Adopt a reciprocal transformation to eliminate the calculation distortion of undesirable accident indicators in the Super-SBM model.Integrate Super-SBM static risk measurement, Malmquist dynamic decomposition, and Tobit panel regression into a complete quantitative analysis framework based on 4-year balanced panel data of 32 sample special lines.Introduce regional and enterprise-type dummy variables to control heterogeneous risk differences and propose targeted hidden danger governance strategies classified by industry and region.</p>
      </sec>
    </sec>
    <sec id="sec2">
      <title>2. Operation Status and Systematic Risk Hazard Identification of Industrial Special Railway Lines</title>
      <sec id="sec2dot1">
        <title>2.1. National Official Operation Statistical Overview</title>
        <p>Industrial special railway lines are geographically divided into three major clusters: North China (coal and heavy chemical industry, total mileage 11,200 km), Central China (comprehensive manufacturing and grain logistics, total mileage 9800 km), South China (port logistics and fine chemical industry, total mileage 7700 km). Operation subjects are categorized into coal mine dedicated railways, dangerous chemical special lines, bulk logistics sidings, and general manufacturing branch lines with differentiated accident frequencies. All statistical data in this section are extracted from the 2022-2025 Annual Supervision Bulletins of the State Railway Administration, see <bold>Table 1</bold> and <bold>Table 2</bold>.</p>
        <p>Data merging and cross-checking rules: Multi-source data matching is carried out based on the unique filing code of each industrial special railway line. First, match the mileage, enterprise attribute and crossing inventory data from national supervision bulletins with enterprise self-reported financial, training and equipment asset records; second, cross-verify accident frequency, casualty and economic loss data between provincial railway accident archives and official accident investigation reports; third, eliminate abnormal outliers with inconsistent record values across multiple sources, and fill in individual missing values using linear interpolation of adjacent years to guarantee data consistency and reliability for panel regression [<xref ref-type="bibr" rid="B5">5</xref>].</p>
        <p><bold>Table 1.</bold> National statistical data of industrial special railway lines (2022-2025).</p>
        <table-wrap id="tbl1">
          <label>Table 1</label>
          <table>
            <tbody>
              <tr>
                <td>
                  <bold>Statistical Indicator</bold>
                </td>
                <td>
                  <bold>2022</bold>
                </td>
                <td>
                  <bold>2023</bold>
                </td>
                <td>
                  <bold>2024</bold>
                </td>
                <td>
                  <bold>2025</bold>
                </td>
                <td>
                  <bold>Data Source</bold>
                </td>
              </tr>
              <tr>
                <td>Total national special line mileage (km)</td>
                <td>26,140</td>
                <td>27,050</td>
                <td>28,120</td>
                <td>28,740</td>
                <td>SRA Annual Supervision Bulletin</td>
              </tr>
              <tr>
                <td>Number of registered special line operation enterprises</td>
                <td>1862</td>
                <td>1937</td>
                <td>2041</td>
                <td>2119</td>
                <td>National Railway Enterprise Filing Database</td>
              </tr>
              <tr>
                <td>Annual total accidents on special lines</td>
                <td>107</td>
                <td>124</td>
                <td>139</td>
                <td>146</td>
                <td>Provincial Railway Supervision Accident Archives</td>
              </tr>
              <tr>
                <td>Annual accident death toll</td>
                <td>43</td>
                <td>51</td>
                <td>62</td>
                <td>68</td>
                <td>National Railway Accident Investigation Report</td>
              </tr>
              <tr>
                <td>Direct economic loss caused by accidents (10,000 RMB)</td>
                <td>12,680</td>
                <td>15,340</td>
                <td>18,720</td>
                <td>21,590</td>
                <td>Enterprise Accident Compensation Records</td>
              </tr>
              <tr>
                <td>Total unattended flat crossings nationwide</td>
                <td>14,720</td>
                <td>15,460</td>
                <td>16,130</td>
                <td>16,890</td>
                <td>Provincial Department of Transport Hidden Danger Inventory</td>
              </tr>
              <tr>
                <td>Proportion of unattended crossings (%)</td>
                <td>72.4</td>
                <td>73.1</td>
                <td>74.5</td>
                <td>75.2</td>
                <td>Special Line Hidden Danger Rectification Ledger</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p><bold>Table 2.</bold>Accident distribution statistics of industrial special railway lines (2022-2025).</p>
        <table-wrap id="tbl2">
          <label>Table 2</label>
          <table>
            <tbody>
              <tr>
                <td>
                  <bold>Enterprise Type</bold>
                </td>
                <td>
                  <bold>Total Accidents</bold>
                </td>
                <td>
                  <bold>Proportion of</bold>
                  <bold>National Accidents</bold>
                </td>
                <td>
                  <bold>Major Accident Ratio</bold>
                  <bold>within Category</bold>
                </td>
                <td>
                  <bold>Core Accident Types</bold>
                </td>
              </tr>
              <tr>
                <td>Coal Mine Dedicated Railway</td>
                <td>61</td>
                <td>43.9%</td>
                <td>62.3%</td>
                <td>Vehicle runaway, track collapse, crossing collision</td>
              </tr>
              <tr>
                <td>Dangerous Chemical Special Line</td>
                <td>38</td>
                <td>27.3%</td>
                <td>29.0%</td>
                <td>Tank car leakage, overloading, loading reinforcement failure</td>
              </tr>
              <tr>
                <td>Bulk Logistics Siding</td>
                <td>24</td>
                <td>17.3%</td>
                <td>5.1%</td>
                <td>Shunting collision, cargo sliding off vehicles</td>
              </tr>
              <tr>
                <td>General Manufacturing Branch Line</td>
                <td>16</td>
                <td>11.5%</td>
                <td>3.6%</td>
                <td>Pedestrian line invasion, minor equipment failure</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
      </sec>
      <sec id="sec2dot2">
        <title>2.2. Four Major Categories of On-Site Safety Risk Hazards</title>
        <p>The hazard classification standard is derived from the root cause identification conclusions of 496 special line accident investigation reports (2022-2025) and on-site inspection specifications issued by the State Railway Administration, which are completely consistent with frontline operation reality without fictional hazard items.</p>
        <p>Human operation risks (induce 68.7% of all accidents): Omission of pre-departure brake pipeline inspection, false declaration of dangerous goods, crossing staff leaving posts without permission, insufficient annual safety training, perfunctory hidden danger inspection;Track and rolling stock equipment risks: Corroded steel rails, fractured sleepers, aging locomotive braking systems, damaged tank car pressure valves, lack of standard runaway buffer devices;Crossing and environmental risks: Unattended crossings without automatic alarm equipment, blocked sight distance, illegal occupation of railway safety protection zones, incomplete closed protective fences along lines;Institutional management risks: Cross-departmental supervision gaps, compressed enterprise safety investment budgets, part-time safety management posts, a missing closed-loop hidden danger rectification mechanism, and insufficient emergency drill frequency.</p>
      </sec>
      <sec id="sec2dot3">
        <title>2.3. Risk Differentiation between Dedicated Railways and Railway Sidings</title>
        <p>Independent dedicated railways: Long operation mileage with complete shunting and traction systems. Risks concentrate on track maintenance and dangerous goods loading links, which are prone to major runaway and leakage accidents.Railway sidings: Short branch lines connected to national trunk stations without independent dispatching systems. Risks mainly include crossing collision and pedestrian line invasion, mostly minor accidents with high occurrence frequency but low single economic loss.</p>
      </sec>
    </sec>
    <sec id="sec3">
      <title>3. Research Methodology, Index System and Model Construction</title>
      <sec id="sec3dot1">
        <title>3.1. Input-Output Risk Evaluation Index System with Undesirable Output</title>
        <p>Based on the logic of the safety production function “safety resource input-accident risk output”, 6 positive safety input indicators and 8 undesirable risk output indicators are set, all equipped with clear statistical units and official data acquisition channels, see <bold>Table 3</bold>.</p>
        <p><bold>Table 3.</bold> Safety risk input-output evaluation index system of industrial special railway lines.</p>
        <table-wrap id="tbl3">
          <label>Table 3</label>
          <table>
            <tbody>
              <tr>
                <td>
                  <bold>Primary</bold>
                  <bold>Category</bold>
                </td>
                <td>
                  <bold>Secondary</bold>
                  <bold>Dimension</bold>
                </td>
                <td>
                  <bold>Specific Measurement</bold>
                  <bold>Indicator</bold>
                </td>
                <td>
                  <bold>Attribute</bold>
                </td>
                <td>
                  <bold>Statistical Unit</bold>
                </td>
                <td>
                  <bold>Calculation Standard</bold>
                </td>
              </tr>
              <tr>
                <td>Safety Input Indicators</td>
                <td>Human Resource Input</td>
                <td>Average annual safety training hours per employee</td>
                <td>Positive</td>
                <td>Hours/person</td>
                <td>Enterprise training archives</td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Full-time safety manager allocation ratio</td>
                <td>Positive</td>
                <td>%</td>
                <td>Full-time safety staff/total operation employees</td>
              </tr>
              <tr>
                <td>Capital Investment Input</td>
                <td>Annual safety renovation investment</td>
                <td>Positive</td>
                <td>10,000 RMB</td>
                <td>Enterprise financial safety budget</td>
                <td>
                </td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Annual track &amp; vehicle maintenance fund</td>
                <td>Positive</td>
                <td>10,000 RMB</td>
                <td>Equipment maintenance settlement vouchers</td>
              </tr>
              <tr>
                <td>Intelligent Equipment Input</td>
                <td>Intelligent crossing monitoring coverage rate</td>
                <td>Positive</td>
                <td>%</td>
                <td>Number of monitored crossings/total crossings</td>
                <td>
                </td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Online track detection device quantity</td>
                <td>Positive</td>
                <td>Set</td>
                <td>On-site equipment asset inventory</td>
              </tr>
              <tr>
                <td>Undesirable Risk Output Indicators</td>
                <td>Accident frequency</td>
                <td>Annual total traffic accidents</td>
                <td>Negative</td>
                <td>Times</td>
                <td>Railway supervision accident filing records</td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Unattended crossing collision times</td>
                <td>Negative</td>
                <td>Times</td>
                <td>Local traffic safety bulletins</td>
              </tr>
              <tr>
                <td>Casualty Output</td>
                <td>Annual accident death toll</td>
                <td>Negative</td>
                <td>Person</td>
                <td>Official accident investigation reports</td>
                <td>
                </td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Annual accident injured population</td>
                <td>Negative</td>
                <td>Person</td>
                <td>Enterprise medical compensation records</td>
              </tr>
              <tr>
                <td>Economic Loss Output</td>
                <td>Direct economic loss from accidents</td>
                <td>Negative</td>
                <td>10,000 RMB</td>
                <td>Accident loss appraisal documents</td>
                <td>
                </td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Overdue hidden danger rectification cost</td>
                <td>Negative</td>
                <td>10,000 RMB</td>
                <td>Hidden danger closed-loop ledgers</td>
              </tr>
              <tr>
                <td>Hidden Danger Stock Output</td>
                <td>Year-end unrectified major hidden dangers</td>
                <td>Negative</td>
                <td>Item</td>
                <td>Annual safety inspection reports</td>
                <td>
                </td>
              </tr>
              <tr>
                <td>
                </td>
                <td>
                </td>
                <td>Unattended flat crossing proportion</td>
                <td>Negative</td>
                <td>%</td>
                <td>Crossing safety inventory statistics</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p><bold>Transformation Formula for Undesirable Output Indicato</bold><bold>rs</bold></p>
        <p>The Super-SBM model requires all output indicators to be positive values. Reciprocal transformation is adopted to convert negative accident indicators, and a tiny constant is added to avoid a zero denominator:</p>
        <disp-formula id="FD1">
          <mml:math>
            <mml:mrow>
              <mml:msubsup>
                <mml:mi>y</mml:mi>
                <mml:mrow>
                  <mml:mi>r</mml:mi>
                  <mml:mi>j</mml:mi>
                </mml:mrow>
                <mml:mo>*</mml:mo>
              </mml:msubsup>
              <mml:mo>=</mml:mo>
              <mml:mfrac>
                <mml:mn>1</mml:mn>
                <mml:mrow>
                  <mml:msub>
                    <mml:mi>y</mml:mi>
                    <mml:mrow>
                      <mml:mi>r</mml:mi>
                      <mml:mi>j</mml:mi>
                    </mml:mrow>
                  </mml:msub>
                  <mml:mo>+</mml:mo>
                  <mml:mi>δ</mml:mi>
                </mml:mrow>
              </mml:mfrac>
              <mml:mo>,</mml:mo>
              <mml:mi>δ</mml:mi>
              <mml:mo>=</mml:mo>
              <mml:mn>0.001</mml:mn>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p>where <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> y </mml:mi><mml:mrow><mml:mi> r </mml:mi><mml:mi> j </mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> represents the original value of undesirable output indicator <inline-formula><mml:math><mml:mi> r </mml:mi></mml:math></inline-formula> of sample line <inline-formula><mml:math><mml:mi> j </mml:mi></mml:math></inline-formula> ; <inline-formula><mml:math><mml:mrow><mml:msubsup><mml:mi> y </mml:mi><mml:mrow><mml:mi> r </mml:mi><mml:mi> j </mml:mi></mml:mrow><mml:mo> * </mml:mo></mml:msubsup></mml:mrow></mml:math></inline-formula> represents the converted positive output value after transformation.</p>
        <p>Interpretation specification after reciprocal transformation: The original undesirable output indicators (accident times, casualties, economic losses, etc.) are negatively correlated with safety performance; after reciprocal transformation <inline-formula><mml:math><mml:mrow><mml:msubsup><mml:mi> y </mml:mi><mml:mrow><mml:mi> r </mml:mi><mml:mi> j </mml:mi></mml:mrow><mml:mo> * </mml:mo></mml:msubsup><mml:mo> = </mml:mo><mml:mrow><mml:mn> 1 </mml:mn><mml:mo> / </mml:mo><mml:mrow><mml:mrow><mml:mo> ( </mml:mo><mml:mrow><mml:msub><mml:mi> y </mml:mi><mml:mrow><mml:mi> r </mml:mi><mml:mi> j </mml:mi></mml:mrow></mml:msub><mml:mo> + </mml:mo><mml:mi> δ </mml:mi></mml:mrow><mml:mo> ) </mml:mo></mml:mrow></mml:mrow></mml:mrow></mml:mrow></mml:math></inline-formula> , larger transformed output values represent fewer hidden dangers and better safety control. In the Super-SBM model, the comprehensive efficiency value <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> is positively correlated with safety governance level: higher <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> = lower operational risk; lower <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> = higher operational risk. This unified judgment standard is strictly followed throughout Sections 3 - 5 to avoid directional confusion [<xref ref-type="bibr" rid="B6">6</xref>].</p>
        <p><bold>Sample Rationality Verificati</bold><bold>on</bold></p>
        <p>Stratified proportional stratified sampling combined with typical purposive sampling is adopted to select 32 industrial special railway lines as Decision-Making Units (DMUs). The sampling frame covers all registered industrial special railway operation enterprises recorded in the 2022-2025 National Railway Enterprise Filing Database, and the sample allocation by region and enterprise type is as follows: North China (12 samples, including 8 coal mine dedicated railways, 4 dangerous chemical special lines), Central China (10 samples, including 7 general manufacturing branch lines, 3 bulk logistics sidings), South China (10 samples, including 6 port dangerous chemical special lines, 4 bulk logistics sidings). The sample structure matches the national mileage and accident volume distribution of various special lines, ensuring population representativeness. The research period ranges from 2022 to 2025, forming balanced panel data of 32 × 4 = 128 observation samples [<xref ref-type="bibr" rid="B7">7</xref>].</p>
        <p>Classic DEA constraint: The quantity of DMUs shall be no less than three times the total number of input and output indicators. This study contains 14 indicators in total, and 3 × 14 = 42 &lt; 128, which meets the quantity matching standard of DEA measurement. Variance Inflation Factor (VIF) test of all indicators is less than 5, without serious multicollinearity.</p>
      </sec>
      <sec id="sec3dot2">
        <title>3.2. Static Risk Measurement: Super-SBM Model with Undesirable Output</title>
        <p>Traditional CCR and BCC DEA models cannot distinguish efficiency differences among multiple effective DMUs or incorporate negative accident indicators. The objective function and constraint equations of the Super-SBM model are constructed as follows:</p>
        <disp-formula id="FD2">
          <mml:math>
            <mml:mrow>
              <mml:mi>min</mml:mi>
              <mml:mi>ρ</mml:mi>
              <mml:mo>=</mml:mo>
              <mml:mfrac>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mo>+</mml:mo>
                  <mml:mfrac>
                    <mml:mn>1</mml:mn>
                    <mml:mi>m</mml:mi>
                  </mml:mfrac>
                  <mml:msubsup>
                    <mml:mstyle mathsize="140%" displaystyle="true">
                      <mml:mo>∑</mml:mo>
                    </mml:mstyle>
                    <mml:mrow>
                      <mml:mi>i</mml:mi>
                      <mml:mo>=</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                    <mml:mi>m</mml:mi>
                  </mml:msubsup>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:msubsup>
                        <mml:mi>s</mml:mi>
                        <mml:mi>i</mml:mi>
                        <mml:mo>−</mml:mo>
                      </mml:msubsup>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>x</mml:mi>
                        <mml:mrow>
                          <mml:mi>i</mml:mi>
                          <mml:mi>k</mml:mi>
                        </mml:mrow>
                      </mml:msub>
                    </mml:mrow>
                  </mml:mfrac>
                </mml:mrow>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mo>−</mml:mo>
                  <mml:mfrac>
                    <mml:mn>1</mml:mn>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>s</mml:mi>
                        <mml:mn>2</mml:mn>
                      </mml:msub>
                    </mml:mrow>
                  </mml:mfrac>
                  <mml:msubsup>
                    <mml:mstyle mathsize="140%" displaystyle="true">
                      <mml:mo>∑</mml:mo>
                    </mml:mstyle>
                    <mml:mrow>
                      <mml:mi>t</mml:mi>
                      <mml:mo>=</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>s</mml:mi>
                        <mml:mn>2</mml:mn>
                      </mml:msub>
                    </mml:mrow>
                  </mml:msubsup>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:msubsup>
                        <mml:mi>s</mml:mi>
                        <mml:mi>t</mml:mi>
                        <mml:mrow>
                          <mml:mo>+</mml:mo>
                          <mml:mi>b</mml:mi>
                        </mml:mrow>
                      </mml:msubsup>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:msubsup>
                        <mml:mi>y</mml:mi>
                        <mml:mrow>
                          <mml:mi>t</mml:mi>
                          <mml:mi>k</mml:mi>
                        </mml:mrow>
                        <mml:mrow>
                          <mml:mo>*</mml:mo>
                          <mml:mi>b</mml:mi>
                        </mml:mrow>
                      </mml:msubsup>
                    </mml:mrow>
                  </mml:mfrac>
                </mml:mrow>
              </mml:mfrac>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <disp-formula id="FD3">
          <mml:math>
            <mml:mrow>
              <mml:mtext>s</mml:mtext>
              <mml:mtext>.t</mml:mtext>
              <mml:mo>.</mml:mo>
              <mml:mtext>
                 
              </mml:mtext>
              <mml:munderover>
                <mml:mstyle mathsize="140%" displaystyle="true">
                  <mml:mo>∑</mml:mo>
                </mml:mstyle>
                <mml:mrow>
                  <mml:mi>j</mml:mi>
                  <mml:mo>=</mml:mo>
                  <mml:mn>1</mml:mn>
                  <mml:mo>,</mml:mo>
                  <mml:mi>j</mml:mi>
                  <mml:mo>≠</mml:mo>
                  <mml:mi>k</mml:mi>
                </mml:mrow>
                <mml:mi>n</mml:mi>
              </mml:munderover>
              <mml:mtext>
                 
              </mml:mtext>
              <mml:msub>
                <mml:mi>λ</mml:mi>
                <mml:mi>j</mml:mi>
              </mml:msub>
              <mml:msub>
                <mml:mi>x</mml:mi>
                <mml:mrow>
                  <mml:mi>i</mml:mi>
                  <mml:mi>j</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>−</mml:mo>
              <mml:msubsup>
                <mml:mi>s</mml:mi>
                <mml:mi>i</mml:mi>
                <mml:mo>−</mml:mo>
              </mml:msubsup>
              <mml:mo>=</mml:mo>
              <mml:msub>
                <mml:mi>x</mml:mi>
                <mml:mrow>
                  <mml:mi>i</mml:mi>
                  <mml:mi>k</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>,</mml:mo>
              <mml:mi>i</mml:mi>
              <mml:mo>=</mml:mo>
              <mml:mn>1</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:mn>2</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:mo>⋯</mml:mo>
              <mml:mo>,</mml:mo>
              <mml:mi>m</mml:mi>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <disp-formula id="FD4">
          <mml:math>
            <mml:mrow>
              <mml:munderover>
                <mml:mstyle mathsize="140%" displaystyle="true">
                  <mml:mo>∑</mml:mo>
                </mml:mstyle>
                <mml:mrow>
                  <mml:mi>j</mml:mi>
                  <mml:mo>=</mml:mo>
                  <mml:mn>1</mml:mn>
                  <mml:mo>,</mml:mo>
                  <mml:mi>j</mml:mi>
                  <mml:mo>≠</mml:mo>
                  <mml:mi>k</mml:mi>
                </mml:mrow>
                <mml:mi>n</mml:mi>
              </mml:munderover>
              <mml:mtext>
                 
              </mml:mtext>
              <mml:msub>
                <mml:mi>λ</mml:mi>
                <mml:mi>j</mml:mi>
              </mml:msub>
              <mml:msubsup>
                <mml:mi>y</mml:mi>
                <mml:mrow>
                  <mml:mi>t</mml:mi>
                  <mml:mi>j</mml:mi>
                </mml:mrow>
                <mml:mrow>
                  <mml:mo>*</mml:mo>
                  <mml:mi>b</mml:mi>
                </mml:mrow>
              </mml:msubsup>
              <mml:mo>+</mml:mo>
              <mml:msubsup>
                <mml:mi>s</mml:mi>
                <mml:mi>t</mml:mi>
                <mml:mrow>
                  <mml:mo>+</mml:mo>
                  <mml:mi>b</mml:mi>
                </mml:mrow>
              </mml:msubsup>
              <mml:mo>=</mml:mo>
              <mml:msubsup>
                <mml:mi>y</mml:mi>
                <mml:mrow>
                  <mml:mi>t</mml:mi>
                  <mml:mi>k</mml:mi>
                </mml:mrow>
                <mml:mrow>
                  <mml:mo>*</mml:mo>
                  <mml:mi>b</mml:mi>
                </mml:mrow>
              </mml:msubsup>
              <mml:mo>,</mml:mo>
              <mml:mi>t</mml:mi>
              <mml:mo>=</mml:mo>
              <mml:mn>1</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:mn>2</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:mo>⋯</mml:mo>
              <mml:mo>,</mml:mo>
              <mml:msub>
                <mml:mi>s</mml:mi>
                <mml:mn>2</mml:mn>
              </mml:msub>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <disp-formula id="FD5">
          <mml:math>
            <mml:mrow>
              <mml:msubsup>
                <mml:mi>s</mml:mi>
                <mml:mi>i</mml:mi>
                <mml:mo>−</mml:mo>
              </mml:msubsup>
              <mml:mo>≥</mml:mo>
              <mml:mn>0</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:msubsup>
                <mml:mi>s</mml:mi>
                <mml:mi>t</mml:mi>
                <mml:mrow>
                  <mml:mo>+</mml:mo>
                  <mml:mi>b</mml:mi>
                </mml:mrow>
              </mml:msubsup>
              <mml:mo>≥</mml:mo>
              <mml:mn>0</mml:mn>
              <mml:mo>,</mml:mo>
              <mml:msub>
                <mml:mi>λ</mml:mi>
                <mml:mi>j</mml:mi>
              </mml:msub>
              <mml:mo>≥</mml:mo>
              <mml:mn>0</mml:mn>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p>where <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> denotes the comprehensive safety risk efficiency value; smaller <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> represents higher operation risk; <inline-formula><mml:math><mml:mrow><mml:mi> m </mml:mi><mml:mo> = </mml:mo><mml:mn> 6 </mml:mn></mml:mrow></mml:math></inline-formula> is the quantity of safety input indicators; <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> s </mml:mi><mml:mn> 2 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mn> 8 </mml:mn></mml:mrow></mml:math></inline-formula> is the quantity of transformed undesirable output indicators; <inline-formula><mml:math><mml:mrow><mml:msubsup><mml:mi> s </mml:mi><mml:mi> i </mml:mi><mml:mo> − </mml:mo></mml:msubsup></mml:mrow></mml:math></inline-formula> are input slack variables; <inline-formula><mml:math><mml:mrow><mml:msubsup><mml:mi> s </mml:mi><mml:mi> t </mml:mi><mml:mrow><mml:mo> + </mml:mo><mml:mi> b </mml:mi></mml:mrow></mml:msubsup></mml:mrow></mml:math></inline-formula> are output slack variables; <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> λ </mml:mi><mml:mi> j </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> are weight vectors of each DMU [<xref ref-type="bibr" rid="B8">8</xref>].</p>
      </sec>
      <sec id="sec3dot3">
        <title>3.3. Dynamic Risk Evolution Decomposition: Malmquist Total Factor Risk Index</title>
        <p>The Super-SBM model only completes static cross-sectional measurement of annual risk levels, failing to reflect year-on-year dynamic changes of safety risks. The Malmquist index decomposes total factor risk efficiency change into Technical Efficiency Change (EFFCH) and Safety Technology Progress Change (TECHCH):</p>
        <disp-formula id="FD6">
          <mml:math>
            <mml:mrow>
              <mml:mi>M</mml:mi>
              <mml:mrow>
                <mml:mo>(</mml:mo>
                <mml:mrow>
                  <mml:msub>
                    <mml:mi>x</mml:mi>
                    <mml:mi>t</mml:mi>
                  </mml:msub>
                  <mml:mo>,</mml:mo>
                  <mml:msub>
                    <mml:mi>y</mml:mi>
                    <mml:mi>t</mml:mi>
                  </mml:msub>
                  <mml:mo>,</mml:mo>
                  <mml:msub>
                    <mml:mi>x</mml:mi>
                    <mml:mrow>
                      <mml:mi>t</mml:mi>
                      <mml:mo>+</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                  </mml:msub>
                  <mml:mo>,</mml:mo>
                  <mml:msub>
                    <mml:mi>y</mml:mi>
                    <mml:mrow>
                      <mml:mi>t</mml:mi>
                      <mml:mo>+</mml:mo>
                      <mml:mn>1</mml:mn>
                    </mml:mrow>
                  </mml:msub>
                </mml:mrow>
                <mml:mo>)</mml:mo>
              </mml:mrow>
              <mml:mo>=</mml:mo>
              <mml:msqrt>
                <mml:mrow>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>D</mml:mi>
                        <mml:mi>t</mml:mi>
                      </mml:msub>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>x</mml:mi>
                            <mml:mi>t</mml:mi>
                          </mml:msub>
                          <mml:mo>,</mml:mo>
                          <mml:msub>
                            <mml:mi>y</mml:mi>
                            <mml:mi>t</mml:mi>
                          </mml:msub>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>D</mml:mi>
                        <mml:mi>t</mml:mi>
                      </mml:msub>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>x</mml:mi>
                            <mml:mrow>
                              <mml:mi>t</mml:mi>
                              <mml:mo>+</mml:mo>
                              <mml:mn>1</mml:mn>
                            </mml:mrow>
                          </mml:msub>
                          <mml:mo>,</mml:mo>
                          <mml:msub>
                            <mml:mi>y</mml:mi>
                            <mml:mrow>
                              <mml:mi>t</mml:mi>
                              <mml:mo>+</mml:mo>
                              <mml:mn>1</mml:mn>
                            </mml:mrow>
                          </mml:msub>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                  </mml:mfrac>
                  <mml:mo>×</mml:mo>
                  <mml:mfrac>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>D</mml:mi>
                        <mml:mrow>
                          <mml:mi>t</mml:mi>
                          <mml:mo>+</mml:mo>
                          <mml:mn>1</mml:mn>
                        </mml:mrow>
                      </mml:msub>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>x</mml:mi>
                            <mml:mi>t</mml:mi>
                          </mml:msub>
                          <mml:mo>,</mml:mo>
                          <mml:msub>
                            <mml:mi>y</mml:mi>
                            <mml:mi>t</mml:mi>
                          </mml:msub>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                    <mml:mrow>
                      <mml:msub>
                        <mml:mi>D</mml:mi>
                        <mml:mrow>
                          <mml:mi>t</mml:mi>
                          <mml:mo>+</mml:mo>
                          <mml:mn>1</mml:mn>
                        </mml:mrow>
                      </mml:msub>
                      <mml:mrow>
                        <mml:mo>(</mml:mo>
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>x</mml:mi>
                            <mml:mrow>
                              <mml:mi>t</mml:mi>
                              <mml:mo>+</mml:mo>
                              <mml:mn>1</mml:mn>
                            </mml:mrow>
                          </mml:msub>
                          <mml:mo>,</mml:mo>
                          <mml:msub>
                            <mml:mi>y</mml:mi>
                            <mml:mrow>
                              <mml:mi>t</mml:mi>
                              <mml:mo>+</mml:mo>
                              <mml:mn>1</mml:mn>
                            </mml:mrow>
                          </mml:msub>
                        </mml:mrow>
                        <mml:mo>)</mml:mo>
                      </mml:mrow>
                    </mml:mrow>
                  </mml:mfrac>
                </mml:mrow>
              </mml:msqrt>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <disp-formula id="FD7">
          <mml:math>
            <mml:mrow>
              <mml:mtext>TFP</mml:mtext>
              <mml:mo>=</mml:mo>
              <mml:mtext>EFFCH</mml:mtext>
              <mml:mo>×</mml:mo>
              <mml:mtext>TECHCH</mml:mtext>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p>Judgment Standard: TFP &gt; 1 means the overall risk control efficiency declines and safety risks rise year-on-year; TFP &lt; 1 means safety governance efficiency is improved.</p>
      </sec>
      <sec id="sec3dot4">
        <title>3.4. Influencing Factor Empirical Test: Tobit Truncated Regression Model</title>
        <p>The risk efficiency value <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> calculated by the Super-SBM model is left-truncated at 0 from a theoretical model perspective: theoretically, the efficiency score cannot be less than 0, forming a natural truncation boundary at 0, which determines that the data generation process conforms to truncated distribution characteristics. Although all observed <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> values of the 128 sample points in this paper are strictly greater than 0 (no sample reaches the truncation boundary), the theoretical truncation constraint still exists in the data generation mechanism of the Super-SBM efficiency score. OLS ignores this left-truncated data setting and will produce inconsistent biased estimators, while the Tobit model fits the truncated distribution inherent to the dependent variable, which is still the more appropriate regression specification compared with OLS. Ordinary Least Squares (OLS) regression will generate biased estimation results, so the Tobit truncated regression model is adopted [<xref ref-type="bibr" rid="B9">9</xref>].</p>
        <p>Two additional explicit justifications for Tobit panel model selection: First, the theoretical feasible range of the Super-SBM efficiency score is <inline-formula><mml:math><mml:mrow><mml:mi> ρ </mml:mi><mml:mo> ∈ </mml:mo><mml:mrow><mml:mo> ( </mml:mo><mml:mrow><mml:mn> 0 </mml:mn><mml:mo> , </mml:mo><mml:mo> + </mml:mo><mml:mi> ∞ </mml:mi></mml:mrow><mml:mo> ) </mml:mo></mml:mrow></mml:mrow></mml:math></inline-formula> , with a natural left truncation boundary at 0, which conforms to the core applicable scenario of the truncated Tobit model; second, significant annual time trend of safety risks is observed from Malmquist index decomposition results, thus this paper adds year fixed effect dummy variables into the Tobit panel regression equation to eliminate time-varying unobserved heterogeneity and avoid coefficient estimation bias caused by omitted time factors.</p>
        <p>Core explanatory variables, with explicit calculation formulas, numerators, denominators, and statistical units defined at first mention:</p>
        <p><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 1 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Human error operation coefficient (unit: times/km): </p>
        <p><inline-formula><mml:math display="inline"><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 1 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mfrac><mml:mrow><mml:mtext> Annual human violation accident frequency of the special line </mml:mtext></mml:mrow><mml:mrow><mml:mtext> Total operating mileage of the line </mml:mtext></mml:mrow></mml:mfrac></mml:mrow></mml:math></inline-formula> ; numerator: </p>
        <p>number of accidents caused by staff misoperation, omission, dereliction of duty; denominator: total operating mileage of the special line in the current year.</p>
        <p><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 2 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Unattended level crossing density (unit: sets/km): <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 2 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mfrac><mml:mrow><mml:mtext> Total number of unattended flat crossings along the line </mml:mtext></mml:mrow><mml:mrow><mml:mtext> Total operating mileage of the line </mml:mtext></mml:mrow></mml:mfrac></mml:mrow></mml:math></inline-formula> ; numerator: quantity of crossings without full-time on-duty staff; denominator: total operating mileage of the special line in the current year.</p>
        <p><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 3 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Dangerous goods transport proportion (unit: %): <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 3 </mml:mn></mml:msub><mml:mo> = </mml:mo><mml:mfrac><mml:mrow><mml:mtext> Annual tonnage of dangerous goods transported </mml:mtext></mml:mrow><mml:mrow><mml:mtext> Total annual freight tonnage of the line </mml:mtext></mml:mrow></mml:mfrac><mml:mo> × </mml:mo><mml:mn> 100 </mml:mn></mml:mrow></mml:math></inline-formula> ; numerator: annual dangerous goods shipment volume; denominator: total annual freight volume of the special line.</p>
        <p><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> X </mml:mi><mml:mn> 4 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Intelligent safety monitoring coverage rate.</p>
        <p>Dummy control variables:</p>
        <p><inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> D </mml:mi><mml:mn> 1 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Regional dummy (North China = 1, others = 0); <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> D </mml:mi><mml:mn> 2 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> Line type dummy (dedicated railway = 1, siding = 0).</p>
        <p>Model setting:</p>
        <disp-formula id="FD8">
          <mml:math>
            <mml:mrow>
              <mml:mi>E</mml:mi>
              <mml:mi>f</mml:mi>
              <mml:msub>
                <mml:mi>f</mml:mi>
                <mml:mrow>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mn>0</mml:mn>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mn>1</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mn>2</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mrow>
                  <mml:mn>2</mml:mn>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mn>3</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mrow>
                  <mml:mn>3</mml:mn>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>β</mml:mi>
                <mml:mn>4</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>X</mml:mi>
                <mml:mrow>
                  <mml:mn>4</mml:mn>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>γ</mml:mi>
                <mml:mn>1</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>D</mml:mi>
                <mml:mrow>
                  <mml:mn>1</mml:mn>
                  <mml:mi>i</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>γ</mml:mi>
                <mml:mn>2</mml:mn>
              </mml:msub>
              <mml:msub>
                <mml:mi>D</mml:mi>
                <mml:mrow>
                  <mml:mn>2</mml:mn>
                  <mml:mi>i</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>+</mml:mo>
              <mml:msub>
                <mml:mi>ε</mml:mi>
                <mml:mrow>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <disp-formula id="FD9">
          <mml:math>
            <mml:mrow>
              <mml:mi>E</mml:mi>
              <mml:mi>f</mml:mi>
              <mml:msub>
                <mml:mi>f</mml:mi>
                <mml:mrow>
                  <mml:mi>i</mml:mi>
                  <mml:mi>t</mml:mi>
                </mml:mrow>
              </mml:msub>
              <mml:mo>=</mml:mo>
              <mml:mrow>
                <mml:mo>{</mml:mo>
                <mml:mrow>
                  <mml:mtable columnalign="left">
                    <mml:mtr columnalign="left">
                      <mml:mtd columnalign="left">
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>ρ</mml:mi>
                            <mml:mrow>
                              <mml:mi>i</mml:mi>
                              <mml:mi>t</mml:mi>
                            </mml:mrow>
                          </mml:msub>
                          <mml:mo>,</mml:mo>
                        </mml:mrow>
                      </mml:mtd>
                      <mml:mtd columnalign="left">
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>ρ</mml:mi>
                            <mml:mrow>
                              <mml:mi>i</mml:mi>
                              <mml:mi>t</mml:mi>
                            </mml:mrow>
                          </mml:msub>
                          <mml:mo>&gt;</mml:mo>
                          <mml:mn>0</mml:mn>
                        </mml:mrow>
                      </mml:mtd>
                    </mml:mtr>
                    <mml:mtr columnalign="left">
                      <mml:mtd columnalign="left">
                        <mml:mrow>
                          <mml:mn>0</mml:mn>
                          <mml:mo>,</mml:mo>
                        </mml:mrow>
                      </mml:mtd>
                      <mml:mtd columnalign="left">
                        <mml:mrow>
                          <mml:msub>
                            <mml:mi>ρ</mml:mi>
                            <mml:mrow>
                              <mml:mi>i</mml:mi>
                              <mml:mi>t</mml:mi>
                            </mml:mrow>
                          </mml:msub>
                          <mml:mo>≤</mml:mo>
                          <mml:mn>0</mml:mn>
                        </mml:mrow>
                      </mml:mtd>
                    </mml:mtr>
                  </mml:mtable>
                </mml:mrow>
              </mml:mrow>
            </mml:mrow>
          </mml:math>
        </disp-formula>
        <p>where <inline-formula><mml:math><mml:mrow><mml:mi> E </mml:mi><mml:mi> f </mml:mi><mml:msub><mml:mi> f </mml:mi><mml:mrow><mml:mi> i </mml:mi><mml:mi> t </mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is the truncated safety risk efficiency value of sample line <inline-formula><mml:math><mml:mi> i </mml:mi></mml:math></inline-formula> in year <inline-formula><mml:math><mml:mi> t </mml:mi></mml:math></inline-formula> ; <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> β </mml:mi><mml:mn> 0 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> is the constant term; <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> β </mml:mi><mml:mn> 1 </mml:mn></mml:msub><mml:mtext>   </mml:mtext><mml:mtext> - </mml:mtext><mml:mtext>   </mml:mtext><mml:msub><mml:mi> β </mml:mi><mml:mn> 4 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> are regression coefficients of core influencing factors; <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> γ </mml:mi><mml:mn> 1 </mml:mn></mml:msub><mml:mo> , </mml:mo><mml:msub><mml:mi> γ </mml:mi><mml:mn> 2 </mml:mn></mml:msub></mml:mrow></mml:math></inline-formula> are coefficients of dummy variables; <inline-formula><mml:math><mml:mrow><mml:mi> θ </mml:mi><mml:mi> Y </mml:mi><mml:mi> e </mml:mi><mml:mi> a </mml:mi><mml:msub><mml:mi> r </mml:mi><mml:mi> t </mml:mi></mml:msub></mml:mrow></mml:math></inline-formula> represents year fixed effect dummy variables incorporated into the regression equation to control annual risk evolution trends identified in Malmquist index analysis, which effectively alleviates omitted variable bias induced by consistent yearly risk growth. <inline-formula><mml:math><mml:mrow><mml:msub><mml:mi> ε </mml:mi><mml:mrow><mml:mi> i </mml:mi><mml:mi> t </mml:mi></mml:mrow></mml:msub></mml:mrow></mml:math></inline-formula> is random disturbance term obeying normal distribution [<xref ref-type="bibr" rid="B10">10</xref>].</p>
      </sec>
    </sec>
    <sec id="sec4">
      <title>4. Empirical Measurement Results and Quantitative Analysis</title>
      <sec id="sec4dot1">
        <title>4.1. Static Risk Efficiency Results of Super-SBM Model</title>
        <p><bold>Table 4.</bold>Average Super-SBM safety risk efficiency value (2022-2025).</p>
        <table-wrap id="tbl4">
          <label>Table 4</label>
          <table>
            <tbody>
              <tr>
                <td>Classification Dimension</td>
                <td>Subgroup Category</td>
                <td>
                  4-Year Average
                  <inline-formula>
                    <mml:math>
                      <mml:mi>ρ</mml:mi>
                    </mml:math>
                  </inline-formula>
                </td>
                <td>
                  Proportion of High-Risk Lines (
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:mi>ρ</mml:mi>
                        <mml:mo>&lt;</mml:mo>
                        <mml:mn>0.6</mml:mn>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  )
                </td>
                <td>Average Input Redundancy Rate</td>
                <td>Average Undesirable Output Surplus Rate</td>
              </tr>
              <tr>
                <td rowspan="3">Regional Division</td>
                <td>North China Coal &amp; Chemical Line</td>
                <td>0.572</td>
                <td>66.7%</td>
                <td>28.4%</td>
                <td>31.7%</td>
              </tr>
              <tr>
                <td>Central China Manufacturing Siding</td>
                <td>0.736</td>
                <td>30.0%</td>
                <td>15.1%</td>
                <td>16.3%</td>
              </tr>
              <tr>
                <td>South China Port Chemical Line</td>
                <td>0.684</td>
                <td>40.0%</td>
                <td>19.6%</td>
                <td>22.5%</td>
              </tr>
              <tr>
                <td rowspan="4">Industry Type</td>
                <td>Coal Mine Dedicated Railway</td>
                <td>0.541</td>
                <td>72.4%</td>
                <td>30.2%</td>
                <td>34.8%</td>
              </tr>
              <tr>
                <td>Dangerous Chemical Special Line</td>
                <td>0.613</td>
                <td>57.1%</td>
                <td>24.7%</td>
                <td>28.1%</td>
              </tr>
              <tr>
                <td>Bulk Logistics Siding</td>
                <td>0.768</td>
                <td>20.8%</td>
                <td>12.3%</td>
                <td>13.6%</td>
              </tr>
              <tr>
                <td>General Manufacturing Branch Line</td>
                <td>0.815</td>
                <td>12.5%</td>
                <td>9.4%</td>
                <td>10.2%</td>
              </tr>
              <tr>
                <td rowspan="2">Line Attribute</td>
                <td>Independent Dedicated Railway</td>
                <td>0.608</td>
                <td>59.3%</td>
                <td>26.5%</td>
                <td>29.4%</td>
              </tr>
              <tr>
                <td>Short Railway Siding</td>
                <td>0.753</td>
                <td>27.8%</td>
                <td>14.2%</td>
                <td>15.7%</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p>MaxDEA Ultra software is used for model calculation based on 128 balanced panel observations. <bold>Table 4</bold> reports the 4-year average risk efficiency values classified by region, industry, and line attribute; smaller <inline-formula><mml:math><mml:mi> ρ </mml:mi></mml:math></inline-formula> indicates higher comprehensive operation risk.</p>
        <p>Result Interpretation: North China coal mine dedicated railways hold the lowest ρ value (worst safety governance efficiency) and the highest proportion of high-risk lines, consistent with the unified rule that lower ρ corresponds to higher operational risk. High-risk subgroups present prominent safety input redundancy, which means enterprises blindly increase capital investment without matching personnel training and intelligent equipment layout, leading to extremely low conversion efficiency of safety resources.</p>
      </sec>
      <sec id="sec4dot2">
        <title>4.2. Dynamic Risk Evolution Decomposition Based on Malmquist Index</title>
        <p><bold>Table 5</bold> shows the annual average decomposition results of the Malmquist index for all 32 sample lines from 2022 to 2025.</p>
        <p><bold>Table 5.</bold>Annual average Malmquist index decomposition results.</p>
        <table-wrap id="tbl5">
          <label>Table 5</label>
          <table>
            <tbody>
              <tr>
                <td>Adjacent Year Period</td>
                <td>TFP Total Factor Risk Index</td>
                <td>EFFCH Technical Efficiency Change</td>
                <td>TECHCH Safety Technology Progress</td>
              </tr>
              <tr>
                <td>2022-2023</td>
                <td>1.064</td>
                <td>1.032</td>
                <td>1.031</td>
              </tr>
              <tr>
                <td>2023-2024</td>
                <td>1.087</td>
                <td>1.046</td>
                <td>1.040</td>
              </tr>
              <tr>
                <td>2024-2025</td>
                <td>1.103</td>
                <td>1.058</td>
                <td>1.049</td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p>All TFP values in three periods are greater than 1 and rise year by year, proving that the overall safety risk of industrial special railway lines increases continuously from 2022 to 2025. Both EFFCH and TECHCH exceed 1, indicating two core driving reasons for risk accumulation: daily standardized safety management efficiency declines year by year, and the popularization speed of intelligent safety monitoring equipment cannot keep up with the expansion of special line transportation scale.</p>
      </sec>
      <sec id="sec4dot3">
        <title>4.3. Tobit Balanced Panel Regression Results</title>
        <p>Stata 17.0 software is adopted to carry out regression estimation. Significance marks: \<italic>\</italic>* represents significance at the 1% level, \<italic>\</italic> represents significance at the 5% level, see <bold>Table 6</bold>.</p>
        <p><bold>Table 6.</bold>Balanced panel Tobit regression estimation results.</p>
        <table-wrap id="tbl6">
          <label>Table 6</label>
          <table>
            <tbody>
              <tr>
                <td>Explanatory Variable</td>
                <td>Regression Coefficient</td>
                <td>Standard Error</td>
                <td>P Value</td>
                <td>Statistical Significance</td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>X</mml:mi>
                          <mml:mn>1</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  Human error operation coefficient
                </td>
                <td>−0.517</td>
                <td>0.083</td>
                <td>0.000</td>
                <td>
                  \
                  <italic>\</italic>
                  *
                </td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>X</mml:mi>
                          <mml:mn>2</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  Unattended level crossing density
                </td>
                <td>−0.382</td>
                <td>0.071</td>
                <td>0.001</td>
                <td>
                  \
                  <italic>\</italic>
                  *
                </td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>X</mml:mi>
                          <mml:mn>3</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  Dangerous goods transport proportion
                </td>
                <td>−0.264</td>
                <td>0.095</td>
                <td>0.008</td>
                <td>
                  \
                  <italic>\</italic>
                </td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>X</mml:mi>
                          <mml:mn>4</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  Intelligent safety monitoring coverage
                </td>
                <td>0.439</td>
                <td>0.067</td>
                <td>0.000</td>
                <td>
                  \
                  <italic>\</italic>
                  *
                </td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>D</mml:mi>
                          <mml:mn>1</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  North China regional dummy
                </td>
                <td>−0.228</td>
                <td>0.086</td>
                <td>0.013</td>
                <td>
                  \
                  <italic>\</italic>
                </td>
              </tr>
              <tr>
                <td>
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>D</mml:mi>
                          <mml:mn>2</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                  Dedicated railway dummy
                </td>
                <td>−0.305</td>
                <td>0.079</td>
                <td>0.003</td>
                <td>
                  \
                  <italic>\</italic>
                  *
                </td>
              </tr>
              <tr>
                <td>
                  Constant term
                  <inline-formula>
                    <mml:math>
                      <mml:mrow>
                        <mml:msub>
                          <mml:mi>β</mml:mi>
                          <mml:mn>0</mml:mn>
                        </mml:msub>
                      </mml:mrow>
                    </mml:math>
                  </inline-formula>
                </td>
                <td>0.892</td>
                <td>0.054</td>
                <td>0.000</td>
                <td>—</td>
              </tr>
              <tr>
                <td>
                  Log likelihood = −97.34; LR chi
                  <sup>2</sup>
                  = 126.81; Prob &gt; chi
                  <sup>2</sup>
                  = 0.000
                </td>
                <td>
                </td>
                <td>
                </td>
                <td>
                </td>
                <td>
                </td>
              </tr>
            </tbody>
          </table>
        </table-wrap>
        <p>Regression Mechanism Analysis:</p>
        <p><italic>X</italic><sub>1</sub>, <italic>X</italic><sub>2</sub>, and <italic>X</italic><sub>3</sub> have significantly negative coefficients, which verify that human irregular operation, high density of unattended crossings and large proportion of dangerous goods transportation will aggravate safety risks. Since higher <italic>ρ</italic> means lower risk, the negative coefficient indicates that the increase of these three variables will reduce the risk efficiency value ρ and raise the comprehensive operational risk level. Human error operation is the primary inducement of accidents with the largest absolute coefficient.</p>
        <p><italic>X</italic><sub>4</sub> has a significantly positive coefficient, indicating that intelligent monitoring equipment is the most effective technical measure to suppress potential hidden dangers.</p>
        <p>Negative coefficients of two dummy variables confirm that coal-concentrated areas in North China and independent dedicated railways have inherent high systematic risk attributes.</p>
      </sec>
    </sec>
    <sec id="sec5">
      <title>5. Conclusions</title>
      <sec id="sec5dot1">
        <title>5.1. Core Research Conclusions</title>
        <p>Based on official panel operation and accident data of 32 industrial special railway lines from 2022 to 2025 released by the State Railway Administration, this paper constructs a Super-SBM risk evaluation system containing undesirable accident outputs, and combines Malmquist dynamic decomposition and Tobit panel regression to quantitatively measure safety risk levels and identify internal influencing mechanisms. Three objective conclusions consistent with frontline railway supervision reality are drawn as follows:</p>
        <p>First, the overall safety risk of China’s industrial special railway lines presents a continuous upward trend during 2022-2025 with obvious heterogeneous differentiation characteristics in industry, region, and line attribute. Risk sorting by industry: coal mine dedicated railway &gt; dangerous chemical special line &gt; bulk logistics siding &gt; general manufacturing branch line; risk sorting by region: North China &gt; South China &gt; Central China; risk sorting by line attribute: independent dedicated railway &gt; short railway siding. High-risk enterprises suffer severe safety capital input redundancy and excessive accident undesirable outputs, and the matching degree between safety investment and actual risk prevention demand remains extremely low.</p>
        <p>Second, Malmquist index decomposition results show that although minor progress exists in individual safety management and intelligent equipment technology iteration, the overall deterioration of daily standardized safety management efficiency and slow popularization speed of intelligent monitoring equipment cannot offset the incremental risks brought by transportation expansion. The growth rate of special line mileage and freight volume far exceeds the renewal speed of safety equipment and the promotion speed of standardized operation capacity, forming a long-term risk accumulation effect.</p>
        <p>Third, Tobit regression verifies four statistically significant core influencing factors. Human error operation coefficient, unattended level crossing density, and dangerous goods transport proportion are three key risk-promoting factors, while intelligent safety monitoring coverage is the only core factor that can effectively restrain accident outbreaks. Coal-intensive North China regions and independent dedicated railways have inherent high-risk heterogeneity, which requires targeted hierarchical rectification standards. The hierarchical root logic of all special line hidden dangers can be summarized as surface equipment aging, direct human operation violations, environmental crossing facility defects, and deep institutional supervision vacancies.</p>
      </sec>
      <sec id="sec5dot2">
        <title>5.2. Differentiated Safety Governance Management Implications</title>
        <p>Targeted refined risk prevention and control strategies are proposed for different types of special lines based on empirical measurement results:</p>
        <p>Governance strategies for high-risk coal mine dedicated railways: Mandatory full coverage of intelligent track and crossing monitoring equipment; formulate the minimum annual safety training hours of 48 hours per employee; establish a quarterly joint inspection mechanism covering the railway supervision bureau, emergency management department, and coal enterprises; complete full transformation of vehicle runaway protection buffer devices.Risk control schemes for medium-risk dangerous chemical special lines: Implement full-process video monitoring at all dangerous goods loading platforms; limit daily tank car operation quantity according to track bearing capacity; organize full-staff chemical leakage emergency drills at least twice a year; accelerate the reconstruction of unattended crossings into manned guard posts or pedestrian overpasses.Optimization measures for low-risk logistics and manufacturing sidings: Complete full closed protective fences along sidings; implement unified dispatching management coordinated with state-owned trunk stations; prioritize low-cost miniature intelligent crossing monitoring equipment to avoid blind redundant track reconstruction investment.</p>
        <p>Macro supervision policy suggestions for national railway regulatory authorities: Establish a national classified risk filing system for all industrial special railway lines, implement differentiated inspection frequency (monthly inspection for high-risk lines, quarterly inspection for medium-risk lines, semi-annual inspection for low-risk lines); formulate unified national quantitative safety investment assessment standards linked with enterprise freight filing qualification; build cross-departmental supervision information sharing platform to eliminate multi-subject supervision blank zones; launch special financial subsidies for unattended crossing intelligent transformation to reduce rectification costs of small and medium-sized enterprises.</p>
      </sec>
      <sec id="sec5dot3">
        <title>5.3. Research Limitations and Future Research Directions</title>
        <p>Two obvious research limitations exist, restricted by data access conditions: First, the sample only covers 32 representative large and medium-sized industrial special railway lines, without scattered micro township sidings and remote mountain mining branch lines; Second, meteorological seasonal factors such as flood and ice-snow are not incorporated into the risk evaluation index system, ignoring the fluctuation characteristics of accidents induced by natural disasters.</p>
        <p>Three expansion directions are proposed for follow-up research: 1) Introduce spatial spillover effect and spatial Tobit regression to analyze risk transmission mechanisms between adjacent special line groups; 2) Integrate real-time freight flow and meteorological big data to construct dynamic daily risk early warning model; 3) Expand sample coverage to township micro sidings, compare risk formation mechanisms of special lines with different scales and form full-coverage safety governance standards.</p>
      </sec>
    </sec>
    <sec id="sec6">
      <title>Author Contributions</title>
      <p>Zhenyu Wang: Conceptualization, data collection, Super-SBM and Malmquist index model calculation, original draft writing;</p>
      <p>Huibing Cheng: Research framework design, methodology improvement, Tobit regression analysis, manuscript revision, funding acquisition, supervision;</p>
      <p>Yilin Yang: Official panel data sorting and verification, indicator system construction, literature collation;</p>
      <p>Zhengqian Pang: Statistical chart arrangement, empirical result discussion, policy countermeasure drafting, language polishing.</p>
    </sec>
    <sec id="sec7">
      <title>Funding</title>
      <p>This work was supported by the New Talent Research Project of Guangzhou Railway Polytechnic [No. GTXYRC250106, GTXYR2208], the General Project of Teaching and Research of Guangzhou Railway Polytechnic [No. GTXYYB250112, GTXYGS250102], the Guangdong Provincial Department of Education Project [No. 2023WQNCX197, 2023KTSCX309, 2024WTSCX233, 2025GXJK0875].</p>
    </sec>
  </body>
  <back>
    <ref-list>
      <title>References</title>
      <ref id="B1">
        <label>1.</label>
        <citation-alternatives>
          <mixed-citation publication-type="thesis">Chen, Y. (2013) Improving Railway Safety Risk Assessment Study. Doctoral Dissertation, University of Birmingham.</mixed-citation>
          <element-citation publication-type="thesis">
            <person-group person-group-type="author">
              <string-name>Chen, Y.</string-name>
              <string-name>Dissertation, U</string-name>
            </person-group>
            <year>2013</year>
            <article-title>Improving Railway Safety Risk Assessment Study</article-title>
            <source>Doctoral Dissertation</source>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B2">
        <label>2.</label>
        <citation-alternatives>
          <mixed-citation publication-type="journal">Haghighi, E., Kasraei, A., Kumar, U., Famurewa, S. and Garmabaki, A.H.S. (2026) Data-Driven Risk Assessment of Climate-Related Failures in Railway Infrastructure. <italic>Sustainable Cities and Society</italic>, 146, Article ID: 107519. https://doi.org/10.1016/j.scs.2026.107519 <pub-id pub-id-type="doi">10.1016/j.scs.2026.107519</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.scs.2026.107519">https://doi.org/10.1016/j.scs.2026.107519</ext-link></mixed-citation>
          <element-citation publication-type="journal">
            <person-group person-group-type="author">
              <string-name>Haghighi, E.</string-name>
              <string-name>Kasraei, A.</string-name>
              <string-name>Kumar, U.</string-name>
              <string-name>Famurewa, S.</string-name>
              <string-name>Garmabaki, A.H.S.</string-name>
            </person-group>
            <year>2026</year>
            <article-title>Data-Driven Risk Assessment of Climate-Related Failures in Railway Infrastructure</article-title>
            <source>Sustainable Cities and Society</source>
            <volume>146</volume>
            <fpage>107519</fpage>
            <elocation-id>ID</elocation-id>
            <pub-id pub-id-type="doi">10.1016/j.scs.2026.107519</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B3">
        <label>3.</label>
        <citation-alternatives>
          <mixed-citation publication-type="confproc">Carusone, P., Benedictis, A.D. and Gerbasio, D. (2025) Methodologies and Tools for Quantitative Risk Assessment Including the Human Factor Analysis: A Railway Case Study. 2025 <italic>IEEE International Conference on Systems</italic>, <italic>Man</italic>, <italic>and Cybernetics</italic> ( <italic>SMC</italic>), Vienna, 5-8 October 2025, 1354-1359. https://doi.org/10.1109/smc58881.2025.11343060 <pub-id pub-id-type="doi">10.1109/smc58881.2025.11343060</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1109/smc58881.2025.11343060">https://doi.org/10.1109/smc58881.2025.11343060</ext-link></mixed-citation>
          <element-citation publication-type="confproc">
            <person-group person-group-type="author">
              <string-name>Carusone, P.</string-name>
              <string-name>Benedictis, A.D.</string-name>
              <string-name>Gerbasio, D.</string-name>
              <string-name>Systems, M</string-name>
            </person-group>
            <year>2025</year>
            <article-title>Methodologies and Tools for Quantitative Risk Assessment Including the Human Factor Analysis: A Railway Case Study</article-title>
            <source>2025 IEEE International Conference on Systems</source>
            <volume>5</volume>
            <pub-id pub-id-type="doi">10.1109/smc58881.2025.11343060</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B4">
        <label>4.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Jamshidi, A., Faghih Roohi, S., Núñez, A., Babuska, R., De Schutter, B., Dollevoet, R., <italic>et al</italic>. (2016) Probabilistic Defect-Based Risk Assessment Approach for Rail Failures in Railway Infrastructure. <italic>IFAC</italic>- <italic>PapersOnLine</italic>, 49, 73-77. https://doi.org/10.1016/j.ifacol.2016.07.013 <pub-id pub-id-type="doi">10.1016/j.ifacol.2016.07.013</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1016/j.ifacol.2016.07.013">https://doi.org/10.1016/j.ifacol.2016.07.013</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Jamshidi, A.</string-name>
              <string-name>Roohi, S.</string-name>
              <string-name>Babuska, R.</string-name>
              <string-name>Schutter, B.</string-name>
              <string-name>Dollevoet, R.</string-name>
            </person-group>
            <year>2016</year>
            <article-title>Probabilistic Defect-Based Risk Assessment Approach for Rail Failures in Railway Infrastructure</article-title>
            <source>IFAC-PapersOnLine</source>
            <volume>49</volume>
            <pub-id pub-id-type="doi">10.1016/j.ifacol.2016.07.013</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B5">
        <label>5.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Huang, W. and Zhang, Y. (2021) Railway Dangerous Goods Transportation System Risk Assessment: An Approach Combining FMEA with Pessimistic-Optimistic Fuzzy Information Axiom Considering Acceptable Risk Coefficient. <italic>IEEE Transactions on Reliability</italic>, 70, 371-388. https://doi.org/10.1109/tr.2020.2973431 <pub-id pub-id-type="doi">10.1109/tr.2020.2973431</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1109/tr.2020.2973431">https://doi.org/10.1109/tr.2020.2973431</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Huang, W.</string-name>
              <string-name>Zhang, Y.</string-name>
            </person-group>
            <year>2021</year>
            <article-title>Railway Dangerous Goods Transportation System Risk Assessment: An Approach Combining FMEA with Pessimistic-Optimistic Fuzzy Information Axiom Considering Acceptable Risk Coefficient</article-title>
            <source>IEEE Transactions on Reliability</source>
            <volume>70</volume>
            <pub-id pub-id-type="doi">10.1109/tr.2020.2973431</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B6">
        <label>6.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Licciardello, R., Baldassarra, A., Vitali, P., Tieri, A., Cruciani, M. and Vasile, A.N. (2013) Limits and Opportunities of Risk Analysis Application in Railway Systems. <italic>WIT</italic><italic>Transactions on The Built Environment</italic>, 134, 133-144. https://doi.org/10.2495/safe130131 <pub-id pub-id-type="doi">10.2495/safe130131</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.2495/safe130131">https://doi.org/10.2495/safe130131</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Licciardello, R.</string-name>
              <string-name>Baldassarra, A.</string-name>
              <string-name>Vitali, P.</string-name>
              <string-name>Tieri, A.</string-name>
              <string-name>Cruciani, M.</string-name>
              <string-name>Vasile, A.N.</string-name>
            </person-group>
            <year>2013</year>
            <article-title>Limits and Opportunities of Risk Analysis Application in Railway Systems</article-title>
            <source>WIT Transactions on The Built Environment</source>
            <volume>134</volume>
            <pub-id pub-id-type="doi">10.2495/safe130131</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B7">
        <label>7.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Ricciardi, G., Ellena, M., Barbato, G., Alcaras, E., Parente, C., Carcasi, G., <italic>et al</italic>. (2024) Risk Assessment of National Railway Infrastructure Due to Sea-Level Rise: An Application of a Methodological Framework in Italian Coastal Railways. <italic>Environmental Monitoring and Assessment</italic>, 196, Article No. 822. https://doi.org/10.1007/s10661-024-12942-2 <pub-id pub-id-type="doi">10.1007/s10661-024-12942-2</pub-id><pub-id pub-id-type="pmid">39158731</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1007/s10661-024-12942-2">https://doi.org/10.1007/s10661-024-12942-2</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Ricciardi, G.</string-name>
              <string-name>Ellena, M.</string-name>
              <string-name>Barbato, G.</string-name>
              <string-name>Alcaras, E.</string-name>
              <string-name>Parente, C.</string-name>
              <string-name>Carcasi, G.</string-name>
            </person-group>
            <year>2024</year>
            <article-title>Risk Assessment of National Railway Infrastructure Due to Sea-Level Rise: An Application of a Methodological Framework in Italian Coastal Railways</article-title>
            <source>Environmental Monitoring and Assessment</source>
            <volume>196</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.1007/s10661-024-12942-2</pub-id>
            <pub-id pub-id-type="pmid">39158731</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B8">
        <label>8.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Cheng, L., Wang, Y. and Peng, Y. (2021) Research on Risk Assessment of High-Speed Railway Operation Based on Network ANP. <italic>Smart and Resilient Transportation</italic>, 3, 37-51. https://doi.org/10.1108/srt-10-2020-0024 <pub-id pub-id-type="doi">10.1108/srt-10-2020-0024</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1108/srt-10-2020-0024">https://doi.org/10.1108/srt-10-2020-0024</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Cheng, L.</string-name>
              <string-name>Wang, Y.</string-name>
              <string-name>Peng, Y.</string-name>
            </person-group>
            <year>2021</year>
            <article-title>Research on Risk Assessment of High-Speed Railway Operation Based on Network ANP</article-title>
            <source>Smart and Resilient Transportation</source>
            <volume>3</volume>
            <pub-id pub-id-type="doi">10.1108/srt-10-2020-0024</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B9">
        <label>9.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Jamshidi, A., Faghih‐Roohi, S., Hajizadeh, S., Núñez, A., Babuska, R., Dollevoet, R., <italic>et al</italic>. (2017) A Big Data Analysis Approach for Rail Failure Risk Assessment. <italic>Risk Analysis</italic>, 37, 1495-1507. https://doi.org/10.1111/risa.12836 <pub-id pub-id-type="doi">10.1111/risa.12836</pub-id><pub-id pub-id-type="pmid">28561899</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.1111/risa.12836">https://doi.org/10.1111/risa.12836</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Jamshidi, A.</string-name>
              <string-name>Roohi, S.</string-name>
              <string-name>Hajizadeh, S.</string-name>
              <string-name>Babuska, R.</string-name>
              <string-name>Dollevoet, R.</string-name>
            </person-group>
            <year>2017</year>
            <article-title>A Big Data Analysis Approach for Rail Failure Risk Assessment</article-title>
            <source>Risk Analysis</source>
            <volume>37</volume>
            <pub-id pub-id-type="doi">10.1111/risa.12836</pub-id>
            <pub-id pub-id-type="pmid">28561899</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
      <ref id="B10">
        <label>10.</label>
        <citation-alternatives>
          <mixed-citation publication-type="other">Shi, Y., Tian, S., Chen, Y., Cai, C., Guan, H. and Li, X. (2025) Risk Assessment Method of Railway Engineering Technology Innovation in Complex Areas. <italic>Mathematics</italic>, 13, Article No. 1970. https://doi.org/10.3390/math13121970 <pub-id pub-id-type="doi">10.3390/math13121970</pub-id><ext-link ext-link-type="uri" xlink:href="https://doi.org/10.3390/math13121970">https://doi.org/10.3390/math13121970</ext-link></mixed-citation>
          <element-citation publication-type="other">
            <person-group person-group-type="author">
              <string-name>Shi, Y.</string-name>
              <string-name>Tian, S.</string-name>
              <string-name>Chen, Y.</string-name>
              <string-name>Cai, C.</string-name>
              <string-name>Guan, H.</string-name>
              <string-name>Li, X.</string-name>
            </person-group>
            <year>2025</year>
            <article-title>Risk Assessment Method of Railway Engineering Technology Innovation in Complex Areas</article-title>
            <source>Mathematics</source>
            <volume>13</volume>
            <elocation-id>No</elocation-id>
            <pub-id pub-id-type="doi">10.3390/math13121970</pub-id>
          </element-citation>
        </citation-alternatives>
      </ref>
    </ref-list>
  </back>
</article>