<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article">
 <front>
  <journal-meta>
   <journal-id journal-id-type="publisher-id">
    ojapps
   </journal-id>
   <journal-title-group>
    <journal-title>
     Open Journal of Applied Sciences
    </journal-title>
   </journal-title-group>
   <issn pub-type="epub">
    2165-3917
   </issn>
   <issn publication-format="print">
    2165-3925
   </issn>
   <publisher>
    <publisher-name>
     Scientific Research Publishing
    </publisher-name>
   </publisher>
  </journal-meta>
  <article-meta>
   <article-id pub-id-type="doi">
    10.4236/ojapps.2025.151009
   </article-id>
   <article-id pub-id-type="publisher-id">
    ojapps-140005
   </article-id>
   <article-categories>
    <subj-group subj-group-type="heading">
     <subject>
      Articles
     </subject>
    </subj-group>
    <subj-group subj-group-type="Discipline-v2">
     <subject>
      Biomedical 
     </subject>
     <subject>
       Life Sciences, Chemistry 
     </subject>
     <subject>
       Materials Science, Computer Science 
     </subject>
     <subject>
       Communications, Engineering, Physics 
     </subject>
     <subject>
       Mathematics
     </subject>
    </subj-group>
   </article-categories>
   <title-group>
    Analysis of the Physical State and Operation of Hydraulic Infrastructure in the Konni Irrigated Area before Rehabilitation
   </title-group>
   <contrib-group>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Aboubacar Yerima Bako
      </surname>
      <given-names>
       Djibo
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff1"> 
      <sup>1</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Illa
      </surname>
      <given-names>
       Salifou
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff2"> 
      <sup>2</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Guero
      </surname>
      <given-names>
       Yadji
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff3"> 
      <sup>3</sup>
     </xref>
    </contrib>
   </contrib-group> 
   <aff id="aff1">
    <addr-line>
     aDepartment of Vegetal Production and Irrigation, University of Djibo Hamani of Tahoua, Tahoua, Niger
    </addr-line> 
   </aff> 
   <aff id="aff2">
    <addr-line>
     aRadio Isotopes Institute, Abdou Moumouni University, Niamey, Niger
    </addr-line> 
   </aff> 
   <aff id="aff3">
    <addr-line>
     aDepartment of Soil Dynamics, Abdou Moumouni University of Niamey, Niamey, Niger
    </addr-line> 
   </aff> 
   <pub-date pub-type="epub">
    <day>
     07
    </day> 
    <month>
     01
    </month>
    <year>
     2025
    </year>
   </pub-date> 
   <volume>
    15
   </volume> 
   <issue>
    01
   </issue>
   <fpage>
    127
   </fpage>
   <lpage>
    136
   </lpage>
   <history>
    <date date-type="received">
     <day>
      27,
     </day>
     <month>
      December
     </month>
     <year>
      2024
     </year>
    </date>
    <date date-type="published">
     <day>
      17,
     </day>
     <month>
      December
     </month>
     <year>
      2024
     </year> 
    </date> 
    <date date-type="accepted">
     <day>
      17,
     </day>
     <month>
      January
     </month>
     <year>
      2025
     </year> 
    </date>
   </history>
   <permissions>
    <copyright-statement>
     © Copyright 2014 by authors and Scientific Research Publishing Inc. 
    </copyright-statement>
    <copyright-year>
     2014
    </copyright-year>
    <license>
     <license-p>
      This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/
     </license-p>
    </license>
   </permissions>
   <abstract>
    In Niger, irrigated agriculture constitutes the main alternative for meeting family needs. It is within this framework that the state and its partners have adopted strategies to promote irrigated production sites. This study was carried out on the Konni irrigated perimeter, the objective of which is to analyze the physical state of hydraulic infrastructures and their operation before the rehabilitation of the said perimeter. The methodology adopted consisted, first of all, of documentary research focused on data relating to this scope and our theme to properly guide the collection of data in the field. The field phase was then followed with an observation of hydraulic infrastructures one by one in order to assess their condition. Thus, the collected data was processed and analyzed. The results of this study show a notable deterioration of hydraulic infrastructure which affected the operating yield of the study area, with the development of barely 700 ha out of 1226 ha planned by the basic study for off-season production (57%). Bathymetric measurements showed that the volume of sediment that accumulated in the Zongo Dam is 1.2 million m
    <sup>3</sup>, which reduces its initial capacity from 12 million m
    <sup>3</sup> to 10.8 million m
    <sup>3</sup> after 43 years of service. The expansion joints of the feed canal are all in poor condition. 90% of the total length of the tertiary canals are degraded, 82.32% of the panels of the main canal C are degraded and 17.68% are cracked. All crossing structures are blocked between the RN1 and the Zongo dam. Based on this critical situation, it would be essential to consider rehabilitation work on all infrastructure in order to restore the hydraulic and even agronomic performance of the Konni irrigated area.
   </abstract>
   <kwd-group> 
    <kwd>
     Irrigated Area
    </kwd> 
    <kwd>
      Dams
    </kwd> 
    <kwd>
      Rehabilitation
    </kwd> 
    <kwd>
      Work Monitoring
    </kwd> 
    <kwd>
      Distribution Network
    </kwd> 
    <kwd>
      Konni
    </kwd>
   </kwd-group>
  </article-meta>
 </front>
 <body>
  <sec id="s1">
   <title>1. Introduction</title>
   <p>Niger is a Sahelian country located in West Africa, which is characterized by the most unfavorable climatic conditions, with low rainfall and very often poorly distributed in time and space. In Niger, as in other Sahelian countries in the West African sub-region, the population is repeatedly confronted with food crises. Rainfed agriculture is based on sandy soils, which are characterized by a natural poverty of organic matter, a low content of nutrients (notably phosphorus and nitrogen), and low water retention which is added to the water deficit, which can all influence soil productivity <xref ref-type="bibr" rid="scirp.140005-1">
     [1]
    </xref>. To fight against the famines that populations frequently face, the authorities of Niger have highlighted the development of irrigated crops in regions where water and land potential exist.</p>
   <p>This political will was manifested through the development of several types of irrigation systems, namely hydro-agricultural developments with total water control, off-season perimeters, private irrigation, collection of water from runoff, large and medium commercial irrigation <xref ref-type="bibr" rid="scirp.140005-2">
     [2]
    </xref>. In the area of total water control, this policy materialized through the development of approximately 13939.75 ha including 8408.05 ha of rice fields and 4696.75 ha of mixed farming <xref ref-type="bibr" rid="scirp.140005-3">
     [3]
    </xref>.</p>
   <p>
    <xref ref-type="bibr" rid="scirp.140005-"></xref>These areas are distributed between 67 perimeters between the regions of Tillabéry, Dosso, Tahoua, Maradi, Zinder, Agadez, Diffa as well as the urban community of Niamey. Hydro-agricultural developments which were built before the 1980s are in most cases in a dilapidated state.</p>
   <p>In Niger, as in most irrigated areas with total water control, the factors which influence the degradation of hydraulic infrastructures are among others: degradation of riders, breakage and/or cracking of panels, existence of cracks, lack of defective seals at the panel level, grassing of irrigation or drainage canals, silting, lack of upkeep and maintenance means for these infrastructures and finally the floods <xref ref-type="bibr" rid="scirp.140005-4">
     [4]
    </xref>. These factors of degradation of hydraulic infrastructure coupled with climate change lead to the problem of insufficient irrigation water in irrigated areas. We need to think about rational and sustainable water management. Water management refers to sustainable use of water resources in the field, through better management of the soil-water-plant system through optimized use of water sources: rainwater, irrigation water as well as reducing water losses <xref ref-type="bibr" rid="scirp.140005-5">
     [5]
    </xref>. Sustainable management of agricultural water is one of the principles that the water manager or the director of the area must take into account, especially in our areas where the deterioration of hydraulic infrastructure is increasing from year to year. If this degradation reaches a critical threshold, where the infrastructure is obsolete, the solution is the rehabilitation of the perimeter.</p>
   <p>This is the case of the Konni perimeter which is more than 40 years old and will be the subject of this study. The general objective is to make a diagnosis of the state of hydraulic infrastructures and their operation.</p>
  </sec><sec id="s2">
   <title>2. Material and Methods</title>
   <sec id="s2_1">
    <title>2.1. Material</title>
    <p>The materials that we used as part of this study are the study site, the data collection tools in the field and finally the tools for analyzing and processing this data.</p>
    <p>Konni irrigated perimeter</p>
    <p>The Konni perimeter is split into Konni 1 and Konni 2, each managed by a cooperative. The Konni 1 perimeter with an area of 1012 ha brings together 15 Mutualist Producer Groups (GMP). The perimeter of Konni 2 covers an area of 1440 ha and is made up of 19 Mutualist Producer Groups. The 34 GMP became 23 hydraulic sectors as part of the reform of cooperatives and ONAHA, which led to the creation of the Association of Irrigation Water Users (AUEI).</p>
    <p>The area is used by 3150 families from 12 villages and there are more than 4000 heads of families who operate this hydro-agricultural development in Konni. It is fed by the Maggia, a river which flows only in the rainy season, two earthen dams Zongo and Mozagué having respectively a capacity of 12 and 30 million m3 at creation. These two dams supply a buffer reservoir in Tcherassa via a 15 km long supply canal. <xref ref-type="fig" rid="fig1">
      Figure 1
     </xref> illustrates the geographical location of the Konni perimeter with its related infrastructure.</p>
    <fig id="fig1" position="float">
     <label>Figure 1</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.140005-"></xref>Figure 1. Overview of Konni 1 and 2 Irrigated areas, Zongo and Mozagué dams <xref ref-type="bibr" rid="scirp.140005-6">
        [6]
       </xref>. On the left and below, we have Konni 2 Irrigated area (yellow) and Konni 1 Irrigated area (green). On the right, bottom, Zongo dam (light blue) and Mozagué dam (dark).</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/2312930-rId14.jpeg?20250120032943" />
    </fig>
   </sec>
   <sec id="s2_2">
    <title>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>2.2. Methods</title>
    <p>The methodology that we adopted is summarized in two steps (2):</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>Good management of an irrigated area requires a diagnostic approach. With some differences, the same methodological approach is applied to all the sites selected for this diagnosis. It is based on the “Participatory Diagnosis and Planning of actions to improve the performance of irrigated areas (DPRP)” method developed by IWMI and ARID <xref ref-type="bibr" rid="scirp.140005-7">
      [7]
     </xref>. It is an approach which seeks, in collaboration with farmers, to analyze the performance of their irrigated system. It makes it possible to diagnose the main constraints and then produce an action plan with a view to improving the system. In this study, we used the DPRP method in half for all stakeholders, that is to say we only carried out a diagnosis of hydraulic infrastructure.</p>
    <p>To achieve the objectives set for this study, it is essential to adopt an appropriate methodology. The methodology adopted is presented in three (3) essential stages which are: site visit, documentary research, field work.</p>
    <p>Step 1: Visit the site</p>
    <p>The visit is organized for reconnaissance of the site, contacting irrigators, technicians and informing them of our upcoming visits. This first phase aims to justify our visit and obtain general information on the area.</p>
    <p>Step 2: Documentary research</p>
    <p>As knowledge can never be based on a single source and the information is scattered and sometimes contradictory, it is imperative for us to consult the documents relating to the Konni irrigated area from the competent institution which is the ONAHA (National Office for Hydro-Agricultural Developments) documentaries.</p>
    <p>Step 3: This is a set of semi-directives, qualitative interviews with the cooperative, the Director of the perimeter and the operators to collect information on the physical state of the Hydraulic infrastructures at the level of the study perimeter;</p>
    <p>In terms of the data collection method, taking into account the different groups of stakeholders involved, the following tools were used:</p>
    <p>Step 4: Field work</p>
    <p>Physical observation consisted of exploring the perimeter to note the physical state of the plots and hydraulic infrastructures. At the end of this observation, a comparison of ideas is made with the aim of correcting certain erroneous information that was given during the interviews.</p>
    <p>An interview guide adapted to each type of actor has been developed. The idea is not to fill a questionnaire, but to let the interlocutor express themselves freely, starting with a historical overview, while subsequently asking for clarification on certain points.</p>
   </sec>
  </sec><sec id="s3">
   <title>3. Results and Discussion</title>
   <sec id="s3_1">
    <title>3.1. Results</title>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>a) Dam of Mozagué</p>
    <p>Bathymetric measurements showed that the volume of sediment that accumulated in the Mozagué dam reservoir is 9.77 million m3, which reduces its initial capacity from 30 million m3 to 20.2 million m3 after 35 years of service.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>b) Dam of Zongo</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>Bathymetric measurements showed that the volume of sediment that accumulated in the Zongo Dam reservoir is 1.2 million m3, which reduces its initial capacity from 12 million m3 to 10.8 million m3 after 41 years of service.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>c) Tcherassa reservoir</p>
    <p>Initially, in its normal filled state, the Buffer reservoir has a useful volume of 1.2 million m3. Bathymetric and topographical surveys carried out by <xref ref-type="bibr" rid="scirp.140005-7">
      [7]
     </xref> show that the current useful volume is 1.05 million m<sup>3</sup>, i.e. a reduction in its capacity of around 150 thousand m<sup>3</sup> compared to the initial state. The total volume of siltation corresponds to the volume of the dead section to which we add the current siltation, i.e. a volume of 0.42 million m<sup>3</sup>.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>a) Feed channel</p>
    <p>Water is conducted from the Zongo dam spillway to the irrigated area by a 15 km long intake canal. The investigation carried out during the first phase of the study showed that the cracked panels of the intake channel have one or more cracks. These cracked panels represent significant water leak points even if the length and thickness of the crack is minimal. The expansion joints are all in poor condition. Their complete replacement is necessary. Panel cracks.</p>
    <p>b) Dead Head Channel</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>The canal has horizontal and vertical cracks along its entire length apart from a few panels. All joints are in poor condition. The panels of average length of 2m are either cracked or grassed. 40 panels have a continuous horizontal crack demonstrating a general subsidence of this section. The berms are bare. This channel must be completely rebuilt in reinforced concrete.</p>
    <p>The greatest stress observed on all channels is the presence of longitudinal and transverse cracks in the covering panels. Also, it was noted that all the channels are unreinforced and cast in place.</p>
    <p>Generally speaking, these structures present visible structural disorders and in particular:</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>a) Primary Channel A</p>
    <p>This canal extends over a length of 11,500 ml distributed over three sections:</p>
    <p>The results of the diagnosis give: 2843 degraded panels (i.e. 96%), only 14 panels have repairable cracks and the rest (175 panels) are in good condition.</p>
    <p>The diagnosis identified 39% of cracked panels, 3.6% of panels in good condition and 57.4% of degraded panels.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>b) Primary Channel B</p>
    <p>This channel extends over a length of 7,275 ml. In its part located between the PA and the RN1, this canal is in poor condition.</p>
    <p>The summary status of the diagnosis of the entire PB channel gives:</p>
    <p>c) Primary Channel D</p>
    <p>The diagnostic result gives:</p>
    <p>d) Canal Principal C</p>
    <p>The PC canal with a length of 2990 m presents the following failures over its entire length:</p>
    <p>Plates in good condition concern plates 1m long. As soon as the length of the plates exceeds 2 m, cracks are apparent in the majority of the plates and the degradation of the plates intensifies. Photo 1 shows the condition of the secondary canals before the rehabilitation activities (<xref ref-type="fig" rid="fig2">
      Figure 2
     </xref>).</p>
    <fig id="fig2" position="float">
     <label>Figure 2</label>
     <caption>
      <title>Figure 2. Very degraded secondary channels <xref ref-type="bibr" rid="scirp.140005-8">
        [8]
       </xref>.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/2312930-rId15.jpeg?20250120032943" />
    </fig>
    <p>The diagnosis of the tertiary canal network gave the following results:</p>
    <p>Sprinklers</p>
    <p>The diagnosis of the watering channels of the second phase shows that these channels, executed in compacted fill, have disappeared. They were replaced by channels maintained by farmers. These channels are grassy, with degraded banks, many termite mounds are found in the area of these channels and also trees and shrubs.</p>
    <p>At the end of each sprinkler there is a discharge facility into the nearest colature. These masonry structures are all degraded and broken and are no longer functional.</p>
    <p>The diagnosis of this equipment shows a large number of mask modules presenting a sealing problem with often significant water leaks.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>Work of Dalot Crossed by a Kori</p>
    <p>All structures are blocked between the RN1 and the Zongo dam. This is due to the lack of maintenance and cleaning of these structures. Due to the difficulty of access and the growth of thorny trees and shrubs around these structures, these hydraulic structures do not work well.</p>
    <p>Inverted Siphon</p>
    <p>The structure of the Civil Engineering parts of this work is in a stable state. No protection device is installed at the entrance to the siphon (grid), which encourages the accumulation of large waste at the entrance to the structure and thus blocks the flow. This sometimes encourages water to overflow upstream of the structure.</p>
    <p>The secondary and primary colatures have a total length of 56751m. There are 7 primary colatures (A, B, C, D, J, K and L). The general condition of the colatures is:</p>
    <p>The lack of maintenance of these colatures has made their operation impossible in some places. Rainwater follows the tracks all around and favors the gullying of the tracks and the banks of the colatures.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.140005-"></xref>The diagnosis carried out during the first phase of the study shows the following state of the dikes:</p>
   </sec>
   <sec id="s3_2">
    <title>3.2. Discussion</title>
    <p>The results of this study show that before the rehabilitation activities, the water mobilization works of the Mozagué and Zongo dams, the Tcherassa buffer reserve are faced with the problems of silting, aging of the basic materials and the lack of maintenance which reduced the operation of the perimeter and the performance of the irrigation system. These results are consistent with those obtained by <xref ref-type="bibr" rid="scirp.140005-9">
      [9]
     </xref> who affirms that the reduction in performance of the Konni irrigated area would probably be due on the one hand to the siltation of the two dams (Zongo and Mozagué) and the Tampon de Tcherassa reserve and on the other hand, the reduction in the number of irrigation could come from the significant infiltration at the Zongo dam which caused the significant infiltration at the basin level of the said dam and that the Mozagué dam was created. Concerning water transport and distribution structures, we note an advanced deterioration of hydraulic structures presenting enormous cracks on almost all of these structures. The same goes for the transport network and the irrigation canals which are in a poor structural state, visible and often widespread, with longitudinal and transverse cracks. This leads to leaks due to lack of maintenance and especially the aging of these structures. These results are consistent with the work of <xref ref-type="bibr" rid="scirp.140005-10">
      [10]
     </xref> on the irrigated area of Galmi, who stated that the degradation of the hydraulic infrastructure of this development is due to the lack of maintenance and their dilapidation. These results are also not far from those obtained by <xref ref-type="bibr" rid="scirp.140005-11">
      [11]
     </xref> on the Daibery perimeter where he showed that the main channels are cracked, invaded by plants, damaged jumpers and defective seals due to the aging of this arrangement. But the cracking observed and the defective seals are the most recurring problems on the main channels. Our results are consistent with those obtained here also by <xref ref-type="bibr" rid="scirp.140005-12">
      [12]
     </xref> who pointed out that the degradation of primary and secondary canals derives from the main problem of aging of hydraulic structures. Thus, as reported by <xref ref-type="bibr" rid="scirp.140005-13">
      [13]
     </xref> in his diagnostic study of hydraulic structures in an irrigated area of Djirataoua which revealed that the water transport and distribution structures are in a state of aging with a high level of degradation. This could be due to the age of the hydraulic infrastructure.</p>
    <p>Indeed, when the perimeter is created, a significant volume of water supplies all of the plots. Based on the observation of the current seriously degraded state of the hydraulic works in the area of Djirataoua, there is undoubtedly a real problem of maintenance or even renewal of these works. However, the observation is the same as <xref ref-type="bibr" rid="scirp.140005-14">
      [14]
     </xref>, who noted that all of the structures are in a state of aging with a high level of degradation. Indeed, although these areas do not have the same characteristics of the irrigation system, we encounter the same constraints there.</p>
   </sec>
  </sec><sec id="s4">
   <title>4. Conclusion</title>
   <p>In view of all the above, we can say that the Konni perimeter faces many problems, namely the deterioration of infrastructure due to lack of maintenance and their aging. These problems include, among others, the silting/silting of the dams and the buffer reservoir, the deterioration of the irrigation network (several panels of the main canal are broken or shifted, and the secondary canals must be taken over a good length), the rupture protection and closure dikes and the exploitation of colatures and drains by operators. It is estimated that only 700 ha are irrigable out of the entire 3000 ha perimeter.</p>
  </sec>
 </body><back>
  <ref-list>
   <title>References</title>
   <ref id="scirp.140005-ref1">
    <label>1</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Addam Kiari, S., Ichaou, A. and Habsatou, B. (2013) Essai de complément minéral foliaire sur riz et légumes. Institut National de la Recherche Agronomique du Niger (INRAN).
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref2">
    <label>2</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Mondiale, B. (2008) Développement de l’irrigation au Niger: Diagnostic et options stratégiques. Revue sectorielle de l’irrigation, Agriculture et développement rural, AFTAR. Région Afrique, département pays AFCF2, 150.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref3">
    <label>3</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     ONAHA (2016) Diagnostic du périmètre hydro-agricole de Konni.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref4">
    <label>4</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Djafarou, J.A. (2022) Identification of Factors of Degradation and Poor Functioning of a Public Irrigated Area: Case of Galmi area (Tahoua-Niger). Bachelor’s Thesis, Djibo Hamani University of Tahoua.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref5">
    <label>5</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     GIZ (2017) Etude sur la rentabilité des bonnes pratiques économes en eau et formation des format-rices/eurs. Rapport d’étude.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref6">
    <label>6</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Habiboulaye, I.B. (2022) État des ouvrages Hydrauliques et suivi des travaux de réhabilitation du périmètre irrigué de Konni (Tahoua Niger). Rapport de Stage pour l’Obtention de Diplôme de Licence ès Sciences Agronomiques. Faculté des Sciences Agronomiques-Université Djibo Hamani de Tahoua-Niger.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref7">
    <label>7</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Studi International (2020) Réalisation des études d’avant projet détaillé (APD), d’impact environnemental et social (EIES) avec option pour la supervision des travaux pour la réhabilitation du périmètre irrigué de Konni.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref8">
    <label>8</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     ANID (2009) Diagnostic Participatif Rapide et Planification des Actions du Périmètre de Daïberi(Tillabéri-Niger).
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref9">
    <label>9</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Siradjé, L.S. (2019) Gestion de l’esu d’irrigation dans le perimtre irrigué de Konni (Tahoua-Niger). 
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref10">
    <label>10</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Mossi, M.I. (2010) Une évaluation des associations d’usagers de l’eau dans les systèmes irrigués du Niger: Constitution, objectifs, fonctions, viabilité financière et autres paramètres de performance. Rapport provisoire. International Water Management Institute, 54.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref11">
    <label>11</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Sabra, A. (2010) Analyse des contraintes hydrauliques du perimtre irrigué de Daibery (Niger). Ph.D. Thesis, International Institute of Water and Environmental.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref12">
    <label>12</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Illiassou, M.M. (2017) Diagnostic participatif rapide: Évaluation du fonctionnement des périmètres irrigués de Daibéry et de Galmi au Niger. Journal of Animal&amp;Plant Sciences, 34, 5467-5481.
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref13">
    <label>13</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Tassiou Makao Adamou, M. (2018) Diagnostic des ouvrages hydrauliques dans un périmètre irrigué public: Cas de périmètre de Djirataoua Mémoire de Licence ès Sciences Agronomiques. Université de Tahoua Faculté des Sciences Agronomiques. 
    </mixed-citation>
   </ref>
   <ref id="scirp.140005-ref14">
    <label>14</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Hachimou, A.N. (2019) Identification des facteurs de degradations physiques et institutionnelles du perimetreirrigué de Konni (Tahoua-Niger).
    </mixed-citation>
   </ref>
  </ref-list>
 </back>
</article>