<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd">
<article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article">
 <front>
  <journal-meta>
   <journal-id journal-id-type="publisher-id">
    jtts
   </journal-id>
   <journal-title-group>
    <journal-title>
     Journal of Transportation Technologies
    </journal-title>
   </journal-title-group>
   <issn pub-type="epub">
    2160-0473
   </issn>
   <issn publication-format="print">
    2160-0481
   </issn>
   <publisher>
    <publisher-name>
     Scientific Research Publishing
    </publisher-name>
   </publisher>
  </journal-meta>
  <article-meta>
   <article-id pub-id-type="doi">
    10.4236/jtts.2025.151001
   </article-id>
   <article-id pub-id-type="publisher-id">
    jtts-138038
   </article-id>
   <article-categories>
    <subj-group subj-group-type="heading">
     <subject>
      Articles
     </subject>
    </subj-group>
    <subj-group subj-group-type="Discipline-v2">
     <subject>
      Engineering
     </subject>
    </subj-group>
   </article-categories>
   <title-group>
    Spatiotemporal Analysis of Pavement Roughness Using Connected Vehicle Data for Asset Management
   </title-group>
   <contrib-group>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Jijo K.
      </surname>
      <given-names>
       Mathew
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff1"> 
      <sup>1</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Jairaj
      </surname>
      <given-names>
       Desai
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff1"> 
      <sup>1</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Rahul Suryakant
      </surname>
      <given-names>
       Sakhare
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff1"> 
      <sup>1</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Jeremy
      </surname>
      <given-names>
       Hunter
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff2"> 
      <sup>2</sup>
     </xref>
    </contrib>
    <contrib contrib-type="author" xlink:type="simple">
     <name name-style="western">
      <surname>
       Darcy M.
      </surname>
      <given-names>
       Bullock
      </given-names>
     </name> 
     <xref ref-type="aff" rid="aff1"> 
      <sup>1</sup>
     </xref>
    </contrib>
   </contrib-group> 
   <aff id="aff1">
    <addr-line>
     aLyles School of Civil and Construction Engineering, Purdue University, West Lafayette, IN, USA
    </addr-line> 
   </aff> 
   <aff id="aff2">
    <addr-line>
     aIndiana Department of Transportation, Indianapolis, IN, USA
    </addr-line> 
   </aff> 
   <pub-date pub-type="epub">
    <day>
     10
    </day> 
    <month>
     12
    </month>
    <year>
     2024
    </year>
   </pub-date> 
   <volume>
    15
   </volume> 
   <issue>
    01
   </issue>
   <fpage>
    1
   </fpage>
   <lpage>
    16
   </lpage>
   <history>
    <date date-type="received">
     <day>
      8,
     </day>
     <month>
      November
     </month>
     <year>
      2024
     </year>
    </date>
    <date date-type="published">
     <day>
      7,
     </day>
     <month>
      November
     </month>
     <year>
      2024
     </year> 
    </date> 
    <date date-type="accepted">
     <day>
      7,
     </day>
     <month>
      December
     </month>
     <year>
      2024
     </year> 
    </date>
   </history>
   <permissions>
    <copyright-statement>
     © Copyright 2014 by authors and Scientific Research Publishing Inc. 
    </copyright-statement>
    <copyright-year>
     2014
    </copyright-year>
    <license>
     <license-p>
      This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/
     </license-p>
    </license>
   </permissions>
   <abstract>
    Pavement condition monitoring and its timely maintenance is necessary to ensure the safety and quality of the roadway infrastructure. The International Roughness Index (IRI) is a commonly used measure to quantify road surface roughness and is a critical input to asset management. In Indiana, the IRI statistic contributes to roughly half of the pavement quality index computation used for asset management. Most agencies inventory IRI once a year, however, pavement conditions vary much more frequently. The objective of this paper is to develop a framework using crowdsourced connected vehicle data to identify and detect temporal changes in IRI. Over 3 billion connected vehicle records in Indiana were analyzed across 30 months between 2022 and 2024 to understand the spatiotemporal variations in roughness. Annual comparisons across all major interstates in Indiana showed the miles of interstates classified as “Good” decreased from 1896 to 1661 miles between 2022 and 2024. The miles of interstate classified as “Needs Maintenance” increased from 82 to 120 miles. A detailed case study showing monthly and daily changes of estimated IRI on I-65 are presented along with supporting dashcam images. Although the crowdsourced IRI estimates are not as robust as traditional specialized pavement profilers, they can be obtained on a monthly, weekly, or even daily basis. The paper concludes by suggesting a combination of frequent crowdsourced IRI and commercially available dashcam imagery of roadway can provide an agile and responsive mechanism for agencies to implement pavement asset management programs that can complement existing annual programs.
   </abstract>
   <kwd-group> 
    <kwd>
     Connected Vehicles
    </kwd> 
    <kwd>
      Pavement
    </kwd> 
    <kwd>
      Pavement Quality
    </kwd> 
    <kwd>
      Roughness
    </kwd> 
    <kwd>
      IRI
    </kwd> 
    <kwd>
      Dashcam
    </kwd>
   </kwd-group>
  </article-meta>
 </front>
 <body>
  <sec id="s1">
   <title>1. Introduction</title>
   <p>Pavement asset management strategies play an important role in the maintenance of roadway systems. A classic pavement asset management system involves systematic processes and tools for optimizing pavement conditions by scheduling maintenance and repairs effectively within budgetary constraints <xref ref-type="bibr" rid="scirp.138038-1">
     [1]
    </xref>. In 2023, $68.9 billion federal funding was allocated to modernize, repair and improve the safety and efficiency of roads and bridges in the United States <xref ref-type="bibr" rid="scirp.138038-2">
     [2]
    </xref>. With more than 3.2 million miles of highways in the United States <xref ref-type="bibr" rid="scirp.138038-3">
     [3]
    </xref>, there is a need to have a data-driven and proactive approach to prioritize asset management strategies on roadway segments that need repair and improvement.</p>
   <p>In the state of Indiana, the pavement asset management strategy is unique to pavement type and road category. Several factors impact the decision-making process including pavement roughness, rutting, surface distress, number of preventive measures, age of the pavement and age of the roadway surface. Deterioration curves are developed based on statistical quartiles and a pavement quality index (PQI) is computed for various components that normalize pavement condition across several road categories. An overall pavement condition is generated using a composite rating of component indices weighted most to roughness and least to rutting/faulting as shown in the below equation.</p>
   <p>
    <math display="inline" xmlns="http://www.w3.org/1998/Math/MathML"> <mtable columnalign="left"> 
      <mtr> 
       <mtd> 
        <mi>
          P 
        </mi> 
        <mi>
          Q 
        </mi> 
        <msub> 
         <mi>
           I 
         </mi> 
         <mrow> 
          <mi>
            o 
          </mi> 
          <mi>
            v 
          </mi> 
          <mi>
            e 
          </mi> 
          <mi>
            r 
          </mi> 
          <mi>
            a 
          </mi> 
          <mi>
            l 
          </mi> 
          <mi>
            l 
          </mi> 
         </mrow> 
        </msub> 
        <mo>
          = 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.5 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              I 
            </mi> 
            <mi>
              R 
            </mi> 
            <mi>
              I 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mo>
          + 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.3 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              % 
            </mi> 
            <mi>
              c 
            </mi> 
            <mi>
              r 
            </mi> 
            <mi>
              a 
            </mi> 
            <mi>
              c 
            </mi> 
            <mi>
              k 
            </mi> 
            <mi>
              i 
            </mi> 
            <mi>
              n 
            </mi> 
            <mi>
              g 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mo>
          + 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.2 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              R 
            </mi> 
            <mi>
              U 
            </mi> 
            <mi>
              T 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mtext>
          for HMA 
        </mtext> 
       </mtd> 
      </mtr> 
      <mtr> 
       <mtd> 
        <mi>
          P 
        </mi> 
        <mi>
          Q 
        </mi> 
        <msub> 
         <mi>
           I 
         </mi> 
         <mrow> 
          <mi>
            o 
          </mi> 
          <mi>
            v 
          </mi> 
          <mi>
            e 
          </mi> 
          <mi>
            r 
          </mi> 
          <mi>
            a 
          </mi> 
          <mi>
            l 
          </mi> 
          <mi>
            l 
          </mi> 
         </mrow> 
        </msub> 
        <mo>
          = 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.5 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              I 
            </mi> 
            <mi>
              R 
            </mi> 
            <mi>
              I 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mo>
          + 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.3 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              % 
            </mi> 
            <mi>
              c 
            </mi> 
            <mi>
              r 
            </mi> 
            <mi>
              a 
            </mi> 
            <mi>
              c 
            </mi> 
            <mi>
              k 
            </mi> 
            <mi>
              i 
            </mi> 
            <mi>
              n 
            </mi> 
            <mi>
              g 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mo>
          + 
        </mo> 
        <mrow> 
         <mo>
           ( 
         </mo> 
         <mrow> 
          <mn>
            0.2 
          </mn> 
          <mo>
            ∗ 
          </mo> 
          <mi>
            P 
          </mi> 
          <mi>
            Q 
          </mi> 
          <msub> 
           <mi>
             I 
           </mi> 
           <mrow> 
            <mi>
              F 
            </mi> 
            <mi>
              a 
            </mi> 
            <mi>
              u 
            </mi> 
            <mi>
              l 
            </mi> 
            <mi>
              t 
            </mi> 
            <mi>
              i 
            </mi> 
            <mi>
              n 
            </mi> 
            <mi>
              g 
            </mi> 
           </mrow> 
          </msub> 
         </mrow> 
         <mo>
           ) 
         </mo> 
        </mrow> 
        <mtext>
          for Concrete 
        </mtext> 
       </mtd> 
      </mtr> 
     </mtable> 
    </math> (1)</p>
   <p>For both hot mix asphalt (HMA) and concrete, pavement roughness contributes to half of the overall pavement quality and is based upon the International Roughness Index (IRI) <xref ref-type="bibr" rid="scirp.138038-4">
     [4]
    </xref>. IRI is usually estimated using high quality inertial profilers or dedicated pavement data collection vehicles equipped with high-speed digital cameras, GPS, laser systems and accelerometers. Agencies typically inventory IRI once a year since these data collection efforts are expensive and labor intensive <xref ref-type="bibr" rid="scirp.138038-5">
     [5]
    </xref> <xref ref-type="bibr" rid="scirp.138038-6">
     [6]
    </xref>. However, pavement conditions change continually throughout the year, particularly during spring freeze thaw cycles or locations experiencing significant localized loading due to construction activities and/or detours. Consequently, there is a need to continuously monitor pavement quality on a system wide basis to implement efficient asset management strategies.</p>
   <p>
    <xref ref-type="bibr" rid="scirp.138038-"></xref>This research proposes a framework to analyze and monitor the pavement roughness using estimated IRI from crowdsourced connected vehicle (CV) data. The ubiquitous nature of this data allows continuous monitoring of pavement conditions both on a systemwide level as well as on selected roads and segments. This methodology also provides a data-driven and systematic approach to target timely mitigation strategies to manage the performance of the pavement and ensure their long-term functionality.</p>
  </sec><sec id="s2">
   <title>2. Literature Review</title>
   <p>Traditional methods for characterizing pavement conditions involves the use of a high-speed inertial profiler <xref ref-type="bibr" rid="scirp.138038-7">
     [7]
    </xref>, a vehicle capable of collecting roughness data in terms of IRI. The measurement equipment is mounted on the front or rear of the vehicle and relevant data is collected at the posted speed limit. Several automated profilers are widely available and capable of collecting roughness including the Automated Road Analyzer (ARAN), Pathrunner, Multi-Functional Vehicle (MFV), Road Measurement Data Acquisition System (ROMDAS), and Laser Road Surface Test (Laser RST). Although this data is highly accurate, there are significant operating costs associated with these profilers and they require dedicated personnel to drive all the roadways in the system. Additionally, they are less reliable during low speeds and data extraction is labor intensive and time consuming <xref ref-type="bibr" rid="scirp.138038-5">
     [5]
    </xref> <xref ref-type="bibr" rid="scirp.138038-6">
     [6]
    </xref> <xref ref-type="bibr" rid="scirp.138038-8">
     [8]
    </xref>.</p>
   <p>Other studies have used image processing techniques <xref ref-type="bibr" rid="scirp.138038-9">
     [9]
    </xref>-<xref ref-type="bibr" rid="scirp.138038-11">
     [11]
    </xref>, LiDAR <xref ref-type="bibr" rid="scirp.138038-12">
     [12]
    </xref>-<xref ref-type="bibr" rid="scirp.138038-14">
     [14]
    </xref> and Unmanned Aerial Vehicles (UAV) <xref ref-type="bibr" rid="scirp.138038-15">
     [15]
    </xref>-<xref ref-type="bibr" rid="scirp.138038-17">
     [17]
    </xref> to estimate pavement roughness. Maeda et al. used deep neural networks on images collected from smartphones to detect and classify pavement condition <xref ref-type="bibr" rid="scirp.138038-18">
     [18]
    </xref>. Results showed more than 70% accuracy in detecting and classifying road conditions with an inference time of roughly 1.5 s on a smartphone. In another image processing study, Obunguta et al. built a robust probabilistic pavement management model with a safety metric output based on the pavement condition <xref ref-type="bibr" rid="scirp.138038-19">
     [19]
    </xref>.</p>
   <p>Recently, researchers have also developed smartphone applications to calculate road roughness <xref ref-type="bibr" rid="scirp.138038-20">
     [20]
    </xref>-<xref ref-type="bibr" rid="scirp.138038-22">
     [22]
    </xref>. Results show that the accuracy of GPS and accelerometer sensors in the smartphones could affect the roughness calculations <xref ref-type="bibr" rid="scirp.138038-23">
     [23]
    </xref>. Another study developed a fully convolutional neural network architecture called IRI-Net that estimates IRI from vibration data collected using smartphones <xref ref-type="bibr" rid="scirp.138038-24">
     [24]
    </xref>. The study also outlines strategies for handling low resolution GPS data obtained from smartphones. Results showed that the developed model was able to accurately estimate IRI under real-world conditions irrespective of the vehicle type, driving speed, and smartphone used for data collection.</p>
   <p>An early study conducted in 2014 explored the use of sensor data from crowdsourced CVs for effective pavement data collection and found that new metrics from this source could be implemented for transportation asset management practices within the near term of 3 - 5 years <xref ref-type="bibr" rid="scirp.138038-25">
     [25]
    </xref>. Bridgelall et al. used data from on-board accelerometers and speed sensors to estimate road roughness indices and found that the average margin of error between the measurements was less than 6% <xref ref-type="bibr" rid="scirp.138038-26">
     [26]
    </xref>. Researchers have also investigated the possibility of augmenting standard pavement survey data with spatiotemporally continuous sensor data crowdsourced from CVs. Kargah-Ostadi et al. leveraged a physics-integrated machine learning model and quarter-car simulation approach to predict standard IRI values using speed, acceleration and suspension data. The evaluation results yielded high accuracy, precision and generalization capability between the training and test datasets, especially on smoother road profiles <xref ref-type="bibr" rid="scirp.138038-27">
     [27]
    </xref>.</p>
   <p>A recent study exploring the potential uses of CV technologies found that utilizing sensor data from CVs for pavement evaluation offers a cost-effective and efficient approach <xref ref-type="bibr" rid="scirp.138038-28">
     [28]
    </xref>. Few studies have used enhanced real-world CV data to evaluate pavement quality. A study compared IRI estimates from connected production vehicle data and inertial profilers, and found that there was a good correlation between the two with an R<sup>2</sup> value of 0.79 <xref ref-type="bibr" rid="scirp.138038-29">
     [29]
    </xref>. Another study highlighted the scalability of this data by analyzing pavement roughness over 5800 miles of I-80 using CV data from 730,000 crowdsourced segments <xref ref-type="bibr" rid="scirp.138038-30">
     [30]
    </xref>. Other studies have applied machine learning techniques on data from inertial sensors to estimate roughness index <xref ref-type="bibr" rid="scirp.138038-31">
     [31]
    </xref> <xref ref-type="bibr" rid="scirp.138038-32">
     [32]
    </xref>. In general, the results suggest that estimated roughness from crowdsourced CV data is a viable tool for network level screening of pavement quality.</p>
  </sec><sec id="s3">
   <title>3. Study Objectives</title>
   <p>
    <xref ref-type="bibr" rid="scirp.138038-"></xref>The objectives of this study are the following:</p>
  </sec><sec id="s4">
   <title>4. Data</title>
   <sec id="s4_1">
    <title>4.1. Connected Vehicles</title>
    <p>
     <xref ref-type="bibr" rid="scirp.138038-"></xref>Enhanced CV data is currently available commercially through several third-party vendors. Data from on-board equipment such as accelerometers, pressure sensors, GPS and other vision/ultrasonic sensors are capable of extracting information on the current state of the pavement conditions. A new system in production vehicles can now provide pavement quality information by analyzing individual wheel speeds and drivetrain information <xref ref-type="bibr" rid="scirp.138038-33">
      [33]
     </xref>. This crowdsourced information from multiple vehicles is then analyzed over a moving window of 60 days to generate an estimated IRI value for a pavement segment.</p>
    <fig id="fig1" position="float">
     <label>Figure 1</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 1. Daily count of connected vehicle records.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId18.jpeg?20241210113030" />
    </fig>
   </sec>
   <sec id="s4_2">
    <title>4.2. Images</title>
    <p>Dashcam images from Google street view, agency dashcams, and commercial truck dashcams are used to validate the results from the CV data. The commercial truck dashcam providers have capability to supply on-demand images from more than 64,000 trucks operating on U.S. roadways. The section of I-65 presented in this paper was traversed by approximately 230 trucks per day.</p>
   </sec>
  </sec><sec id="s5">
   <title>5. Systemwide Overview of Pavement Condition</title>
   <p>
    <xref ref-type="fig" rid="fig2">
     Figure 2
    </xref> provides an annual comparison of the median roughness across all interstates (by direction) in Indiana during the study period. <xref ref-type="table" rid="table1">
     Table 1
    </xref> shows the total bi-directional miles of interstate roadways classified by pavement roughness condition between 2022 and 2024. The classification is performed using the IRI thresholds outlined by Federal Highway Administration (FHWA) <xref ref-type="bibr" rid="scirp.138038-36">
     [36]
    </xref>. In general,</p>
   <p>Changes in specific interstates are shown in <xref ref-type="fig" rid="fig2">
     Figure 2
    </xref>.</p>
   <p>This systemwide overview of pavement roughness at both a system level and route level provides an important high-level status of pavement condition by year. The subsequent sections describe how this data can be further analyzed at more discrete spatial and temporal levels.</p>
   <fig id="fig2" position="float">
    <label>Figure 2</label>
    <caption>
     <title>
      <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 2. Annual IRI comparison across Indiana interstates.</title>
    </caption>
    <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId19.jpeg?20241210113031" />
   </fig>
   <p>
    <xref ref-type="bibr" rid="scirp.138038-"></xref>Table 1. Pavement roughness by miles of interstates in Indiana and absolute change compared to 2022.</p>
   <table class="MsoTableGrid custom-table" border="0" cellspacing="0" cellpadding="0"> 
    <tr> 
     <td rowspan="2" class="acenter" width="28.88%"><p style="text-align:center">Median Roughness (in/mi)</p></td> 
     <td class="custom-bottom-td acenter" width="12.94%"><p style="text-align:center">2022</p></td> 
     <td class="custom-bottom-td acenter" width="28.02%" colspan="2"><p style="text-align:center">2023</p></td> 
     <td class="custom-bottom-td acenter" width="30.16%" colspan="2"><p style="text-align:center">2024*</p></td> 
    </tr> 
    <tr> 
     <td class="custom-bottom-td custom-top-td acenter" width="12.94%"><p style="text-align:center">Total miles (mi)</p></td> 
     <td class="custom-bottom-td custom-top-td acenter" width="12.94%"><p style="text-align:center">Total miles (mi)</p></td> 
     <td class="custom-bottom-td custom-top-td acenter" width="15.08%"><p style="text-align:center">Absolute change (mi)</p></td> 
     <td class="custom-bottom-td custom-top-td acenter" width="15.08%"><p style="text-align:center">Total miles (mi)</p></td> 
     <td class="custom-bottom-td custom-top-td acenter" width="15.08%"><p style="text-align:center">Absolute change (mi)</p></td> 
    </tr> 
    <tr> 
     <td class="custom-top-td acenter" width="28.88%"><p style="text-align:center">Good (&lt;95)</p></td> 
     <td class="custom-top-td acenter" width="12.94%"><p style="text-align:center">1896.1</p></td> 
     <td class="custom-top-td acenter" width="12.94%"><p style="text-align:center">1700.8</p></td> 
     <td class="custom-top-td acenter" width="15.08%"><p style="text-align:center">−195.3</p></td> 
     <td class="custom-top-td acenter" width="15.08%"><p style="text-align:center">1661.2</p></td> 
     <td class="custom-top-td acenter" width="15.08%"><p style="text-align:center">−234.9</p></td> 
    </tr> 
    <tr> 
     <td class="acenter" width="28.88%"><p style="text-align:center">Acceptable (95 - 170)</p></td> 
     <td class="acenter" width="12.94%"><p style="text-align:center">641.8</p></td> 
     <td class="acenter" width="12.94%"><p style="text-align:center">812.7</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">170.9</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">838.8</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">197</p></td> 
    </tr> 
    <tr> 
     <td class="acenter" width="28.88%"><p style="text-align:center">Needs Maintenance (&gt;=170)</p></td> 
     <td class="acenter" width="12.94%"><p style="text-align:center">82.8</p></td> 
     <td class="acenter" width="12.94%"><p style="text-align:center">107.2</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">24.4</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">120.7</p></td> 
     <td class="acenter" width="15.08%"><p style="text-align:center">37.9</p></td> 
    </tr> 
   </table>
   <p>*6 months.</p>
  </sec><sec id="s6">
   <title>6. Case Study on I-65</title>
   <sec id="s6_1">
    <title>6.1. Annual Comparison by Mile Marker</title>
    <p>
     <xref ref-type="fig" rid="fig3">
      Figure 3
     </xref> shows a spatiotemporal comparison of roughness on I-65 between 2022 and 2023. The top half of the plot in subfigures (a) and (b) represents the roughness in the northbound direction (I-65 N) and bottom half represents the southbound direction (I-65 S). The 0.1-mi segments along the route are shown on the horizontal axis and the months on the vertical axis. The plot is color coded by the median roughness aggregated by each month. The areas denoted in white highlight instances with data outage (callout i).</p>
    <p>
     <xref ref-type="bibr" rid="scirp.138038-"></xref>In general, the majority of I-65 is operating under acceptable roughness conditions with very few sections needing maintenance. In 2023 (<xref ref-type="fig" rid="fig3(b)">
      Figure 3(b)
     </xref>), the area near mile marker (MM) 180 on I-65 N (callout ii) seems to have worsened further between the months of April and August, which was due to construction activities. It is common to have poor road conditions on work sites where construction activities can disrupt the smooth surface resulting in uneven surfaces, potholes, and construction debris. The area near MM 240 on I-65 N (callout iii) also worsened throughout the year.</p>
    <p>
     <xref ref-type="bibr" rid="scirp.138038-"></xref>The one area where the pavement condition improved was near MM 140 on I-65 S (callout iv and v). Construction activities in this area near Lebanon on I-65 wrapped up in June 2022 and this is highlighted by the stark improvement in pavement roughness (callout iv). Google Street View image obtained in May 2023 validate this smooth pavement after construction (<xref ref-type="fig" rid="fig4(b)">
      Figure 4(b)
     </xref>), whereas GoPro images collected during May 2022 highlight some of the potholes and rough pavement conditions in this area during ongoing construction (callout i in <xref ref-type="fig" rid="fig4(a)">
      Figure 4(a)
     </xref>). Callout ii shows the common tower in both <xref ref-type="fig" rid="fig4(a)">
      Figure 4(a)
     </xref> and <xref ref-type="fig" rid="fig4(b)">
      Figure 4(b)
     </xref> to highlight the same location.</p>
    <fig-group id="fig3" position="float">
     <fig id="fig3" position="float">
      <label>Figure 3</label>
      <caption>
       <title>(a) 2022--(b) 2023--Figure 3. Monthly IRI comparison on I-65.</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId20.jpeg?20241210113033" />
     </fig>
     <fig id="fig3" position="float">
      <label>Figure 3</label>
      <caption>
       <title>(a) 2022--(b) 2023--Figure 3. Monthly IRI comparison on I-65.</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId21.jpeg?20241210113033" />
     </fig>
    </fig-group>
    <fig-group id="fig4" position="float">
     <fig id="fig4" position="float">
      <label>Figure 4</label>
      <caption>
       <title>(a)--(b)--Figure 4. Pavement condition between 2022 and 2023. (a) GoPro image from May 2022 corresponding to callout iv in Figure 3; (b) Google Street View Image from July 2023 corresponding to callout v in Figure 3.</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId22.jpeg?20241210113033" />
     </fig>
     <fig id="fig4" position="float">
      <label>Figure 4</label>
      <caption>
       <title>(a)--(b)--Figure 4. Pavement condition between 2022 and 2023. (a) GoPro image from May 2022 corresponding to callout iv in Figure 3; (b) Google Street View Image from July 2023 corresponding to callout v in Figure 3.</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId23.jpeg?20241210113033" />
     </fig>
    </fig-group>
   </sec>
   <sec id="s6_2">
    <title>6.2. Variation in Pavement Conditions</title>
    <p>In order to better understand the variations between the years, a delta plot showing the difference in median roughness between 2022 and 2023 is shown in <xref ref-type="fig" rid="fig5">
      Figure 5
     </xref>. Areas where median roughness decreased or pavement conditions improved are shown in green whereas areas with considerable degradations are shown in red. Areas with minor improvements or degradations are shown in light and dark grey, respectively.</p>
    <p>This visualization helps to narrow down areas with considerable variation in roughness. This includes segments near MM 60 (callout i) and MM 140 (callout ii) where conditions improved as well as areas near MM 180 (callout iii) and MM 240 (callout iv) where conditions worsened. This performance measure will be an important tool for agencies to understand the time and location of when the pavement conditions are changing over time so that they can systematically allocate resources for asset management planning.</p>
    <fig id="fig5" position="float">
     <label>Figure 5</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 5. Delta IRI between 2022 and 2023.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId24.jpeg?20241210113034" />
    </fig>
   </sec>
   <sec id="s6_3">
    <title>6.3. Monthly Comparison</title>
    <p>
     <xref ref-type="fig" rid="fig6">
      Figure 6
     </xref> shows a 100% stacked plot that compares the variation in median roughness values across I-65 N during the month of January between 2022, 2023 and 2024. Each bar on the vertical axis represents a one-mile segment on I-65 N and the values on horizontal axis show the percent of segments operating under various roughness conditions.</p>
    <p>As seen earlier, more than 75% of the segment near MM 140 needs maintenance (callout i and ii) due to ongoing construction activities in January 2022 and 2023. When construction was completed in 2023, most of this segment operated under good conditions (callout iii). In contrast, the segments just before MM 240 seem to be degrading over time. In January 2022, roughly 40% of this segment needed maintenance (callout iv), whereas in 2023 this rose to 50% (callout v) and in 2024 to 80% (callout vi).</p>
    <fig id="fig6" position="float">
     <label>Figure 6</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 6. IRI comparison on I-65 N between 2022 and 2024.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId25.jpeg?20241210113035" />
    </fig>
   </sec>
   <sec id="s6_4">
    <title>6.4. Daily Comparison</title>
    <p>
     <xref ref-type="fig" rid="fig7">
      Figure 7
     </xref> shows a detailed comparison of the segments between MM 235 and MM 240 on I-65 N across January 2022, 2023, and 2024. The horizontal axis shows each day in January and vertical axis shows every 0.1-mi segment color coded by the pavement roughness condition. The first drop in pavement condition begins around January 27, 2022 (callout i) and worsens during January 2023 (callout ii). The conditions worsen and propagate across the entire one-mile stretch between MM 238 and 239 in January 2024 (callout iii). Dashcam images obtained from commercial trucks in February 2024 as shown in <xref ref-type="fig" rid="fig8(a)">
      Figure 8(a)
     </xref> and <xref ref-type="fig" rid="figFigure(b)">
      Figure(b)
     </xref>, also validate the poor condition of the roadway between MM 238 and MM 239. The connected vehicle data also shows a stark improvement in conditions at the onset of MM 239 which is also validated using the dashcam image in <xref ref-type="fig" rid="fig8(c)">
      Figure 8(c)
     </xref>.</p>
    <p>Additionally, the black circles in <xref ref-type="fig" rid="fig7">
      Figure 7
     </xref> highlight the date when pavement conditions begin to degrade at several locations on the interstate. This information from crowdsourced data will be helpful for agencies to perform continuous monitoring of the pavement conditions and apply appropriate pavement management and rehabilitation techniques to ensure the safety of travelling motorists.</p>
    <fig id="fig7" position="float">
     <label>Figure 7</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 7. Daily variations in IRI across January 2022, 2023, and 2024.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId26.jpeg?20241210113035" />
    </fig>
    <fig-group id="fig8" position="float">
     <fig id="fig8" position="float">
      <label>Figure 8</label>
      <caption>
       <title>(a)--(b)--(c)--Figure 8. Connected truck dashcam images showing pavement condition on I-65 N. (a) I-65 N MM 238.4 on Feb 18, 2024 (callout iii on Figure 7); (b) I-65 N MM 238.5 on Feb 18, 2024 (callout iii on Figure 7); (c) I-65 N MM 239 on Feb 18, 2024 (callout iv on Figure 7).</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId27.jpeg?20241210113035" />
     </fig>
     <fig id="fig8" position="float">
      <label>Figure 8</label>
      <caption>
       <title>(a)--(b)--(c)--Figure 8. Connected truck dashcam images showing pavement condition on I-65 N. (a) I-65 N MM 238.4 on Feb 18, 2024 (callout iii on Figure 7); (b) I-65 N MM 238.5 on Feb 18, 2024 (callout iii on Figure 7); (c) I-65 N MM 239 on Feb 18, 2024 (callout iv on Figure 7).</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId28.jpeg?20241210113035" />
     </fig>
     <fig id="fig8" position="float">
      <label>Figure 8</label>
      <caption>
       <title>(a)--(b)--(c)--Figure 8. Connected truck dashcam images showing pavement condition on I-65 N. (a) I-65 N MM 238.4 on Feb 18, 2024 (callout iii on Figure 7); (b) I-65 N MM 238.5 on Feb 18, 2024 (callout iii on Figure 7); (c) I-65 N MM 239 on Feb 18, 2024 (callout iv on Figure 7).</title>
      </caption>
      <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId29.jpeg?20241210113035" />
     </fig>
    </fig-group>
   </sec>
   <sec id="s6_5">
    <title>6.5. Longitudinal Variation</title>
    <p>
     <xref ref-type="fig" rid="fig9">
      Figure 9
     </xref> illustrates the longitudinal variation in IRI values for the highlighted section between MM 238 and MM 239 in <xref ref-type="fig" rid="fig7">
      Figure 7
     </xref>. The daily, monthly and yearly variation in pavement roughness over this section is illustrated by the blue, pink and black lines respectively. The monthly and yearly values are estimated by calculating the median of the daily estimates.</p>
    <p>In early 2022, during the winter months of January and February, this section of the pavement deteriorated and required maintenance (callout i). After initial reactive patching and subsequent maintenance, pavement conditions improved to an acceptable level (callout ii). However, following completion of summer maintenance, subsequent pavement deterioration occurred over the winter (callout iii). In late 2023 and early 2024, conditions worsened through April 2024, when additional maintenance briefly improved conditions before they deteriorated again (callout iv).</p>
    <p>These comparisons will be valuable for agencies to tailor their decision-making at various levels. For example, the daily or monthly variations can be used to understand the performance from a project or district level, whereas the yearly variations can be used for systemwide decisions. Additionally, as monthly estimates closely align with daily estimates, agencies could potentially opt for monthly results to reduce computational complexity and data storage requirements.</p>
    <fig id="fig9" position="float">
     <label>Figure 9</label>
     <caption>
      <title>
       <xref ref-type="bibr" rid="scirp.138038-"></xref>Figure 9. Daily, monthly and yearly roughness variation on I-65 N MM 238-239 section.</title>
     </caption>
     <graphic mimetype="image" position="float" xlink:type="simple" xlink:href="https://html.scirp.org/file/3500962-rId30.jpeg?20241210113036" />
    </fig>
   </sec>
  </sec><sec id="s7">
   <title>7. Conclusions</title>
   <p>This study used crowdsourced connected vehicle data to develop spatiotemporal assessment of pavement roughness conditions for asset management planning. Over 3 billion connected vehicle records available between January 2022 and June 2024 (<xref ref-type="fig" rid="fig1">
     Figure 1
    </xref>) in the state of Indiana were linearly mapped to interstate roadways. Annual comparisons across all major interstates in Indiana showed the miles of interstates classified as “Good” decreased from 1896 to 1661 miles between 2022 and 2024. The miles of interstate classified as “Needs Maintenance” increased from 82 miles to 120 during that same period (<xref ref-type="fig" rid="fig2">
     Figure 2
    </xref> and <xref ref-type="table" rid="table1">
     Table 1
    </xref>). Annual (<xref ref-type="fig" rid="fig3">
     Figure 3
    </xref>), monthly (<xref ref-type="fig" rid="fig6">
     Figure 6
    </xref>) and daily (<xref ref-type="fig" rid="fig7">
     Figure 7
    </xref>) comparisons showing the variations in pavement conditions on I-65 were presented. Visualizations were also developed to easily identify segments along the interstate with considerable variations in pavement conditions over time (<xref ref-type="fig" rid="fig5">
     Figure 5
    </xref>). Dashcam images from commercial trucks (<xref ref-type="fig" rid="fig8">
     Figure 8
    </xref>) and Google Street View (<xref ref-type="fig" rid="fig4">
     Figure 4
    </xref>) were also used to validate the results generated using the crowdsourced data.</p>
   <p>
    <xref ref-type="bibr" rid="scirp.138038-"></xref>The methodology and framework presented in this study will help agencies understand the time and location when pavement conditions change so they can undertake a proactive approach to asset management planning. The real-time availability of this data will also provide additional opportunities for continuous pavement monitoring. Furthermore, the results from this methodology can be used for quantitative monitoring of pavement conditions and can be used to identify locations for additional targeted and enhanced data collection using advanced equipment. The visualizations and performance measures developed in this study could also aid in the systematic prioritization of pavement management strategies to ensure safety and long-term functionality of roadways.</p>
   <p>
    <xref ref-type="bibr" rid="scirp.138038-"></xref>Future research may be used to perform comprehensive assessments of pavement degradation rates. This will be particularly helpful for agencies to identify critical sections, optimize budget allocations, and prioritize maintenance tasks. By comparing daily, monthly, and yearly degradation rates, agencies can develop effective mitigation strategies at the system, network, or project level. Timely pavement maintenance can also significantly enhance user safety and reduce costs.</p>
  </sec><sec id="s8">
   <title>Acknowledgements</title>
   <p>The connected vehicle roughness data was provided by NIRA Dynamics AB. Commercial truck dashcam images were provided by Vizzion. This work was supported by the Joint Transportation Research Program and the Indiana Department of Transportation. The contents of this paper reflect the views of the authors, who are responsible for the facts and the accuracy of the data presented herein, and do not necessarily reflect the official views or policies of the sponsoring organization.</p>
  </sec>
 </body><back>
  <ref-list>
   <title>References</title>
   <ref id="scirp.138038-ref1">
    <label>1</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Peraka, N.S.P. and Biligiri, K.P. (2020) Pavement Asset Management Systems and Technologies: A Review. Automation in Construction, 119, Article ID: 103336. &gt;https://doi.org/10.1016/j.autcon.2020.103336
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref2">
    <label>2</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Department of Transportation (2024) Budget of the United States Government, Fiscal Year 2023. &gt;https://www.govinfo.gov/content/pkg/BUDGET-2023-BUD/pdf/BUDGET-2023-BUD-17.pdf 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref3">
    <label>3</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Federal Highway Administration (2024) Chart VMT-421C—Highway Statistics 2022. &gt;https://www.fhwa.dot.gov/policyinformation/statistics/2022/vmt421c.cfm 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref4">
    <label>4</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Múčka, P. (2016) International Roughness Index Specifications around the World. Road Materials and Pavement Design, 18, 929-965. &gt;https://doi.org/10.1080/14680629.2016.1197144
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref5">
    <label>5</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Aleadelat, W. and Ksaibati, K. (2017) Estimation of Pavement Serviceability Index Through Android-Based Smartphone Application for Local Roads. Transportation Research Record, 2639, 129-135. &gt;https://doi.org/10.3141/2639-16 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref6">
    <label>6</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Du, Y., Liu, C., Wu, D. and Li, S. (2016) Application of Vehicle Mounted Accelerometers to Measure Pavement Roughness. International Journal of Distributed Sensor Networks, 12, Article ID: 8413146. &gt;https://doi.org/10.1155/2016/8413146
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref7">
    <label>7</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Federal Highway Administration (2024) Pavements—Inertial Profiler—Pavement (IP). &gt;https://infotechnology.fhwa.dot.gov/inertial-profiler-road-pavement/ 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref8">
    <label>8</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Loprencipe, G., de Almeida Filho, F.G.V., de Oliveira, R.H. and Bruno, S. (2021) Validation of a Low-Cost Pavement Monitoring Inertial-Based System for Urban Road Networks. Sensors, 21, Article 3127. &gt;https://doi.org/10.3390/s21093127
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref9">
    <label>9</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Bashar, M.Z. and Torres-Machi, C. (2022) Deep Learning for Estimating Pavement Roughness Using Synthetic Aperture Radar Data. Automation in Construction, 142, Article ID: 104504. &gt;https://doi.org/10.1016/j.autcon.2022.104504
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref10">
    <label>10</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Abohamer, H., Elseifi, M., Dhakal, N., Zhang, Z. and Fillastre, C.N. (2021) Development of a Deep Convolutional Neural Network for the Prediction of Pavement Roughness from 3D Images. Journal of Transportation Engineering, Part B: Pavements, 147, Article ID: 04021048. &gt;https://doi.org/10.1061/jpeodx.0000310
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref11">
    <label>11</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Cereceda, D., Medel-Vera, C., Ortiz, M. and Tramon, J. (2022) Roughness and Condition Prediction Models for Airfield Pavements Using Digital Image Processing. Automation in Construction, 139, Article ID: 104325. &gt;https://doi.org/10.1016/j.autcon.2022.104325
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref12">
    <label>12</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Alhasan, A., White, D.J. and De Brabanter, K. (2015) Spatial Pavement Roughness from Stationary Laser Scanning. International Journal of Pavement Engineering, 18, 83-96. &gt;https://doi.org/10.1080/10298436.2015.1065403
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref13">
    <label>13</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Gao, Q., Fan, L., Wei, S., Li, Y., Du, Y. and Liu, C. (2023) Differences Evaluation of Pavement Roughness Distribution Based on Light Detection and Ranging Data. Applied Sciences, 13, Article 8080. &gt;https://doi.org/10.3390/app13148080
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref14">
    <label>14</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     De Blasiis, M.R., Di Benedetto, A., Fiani, M. and Garozzo, M. (2020) Assessing of the Road Pavement Roughness by Means of Lidar Technology. Coatings, 11, Article 17. &gt;https://doi.org/10.3390/coatings11010017
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref15">
    <label>15</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Che, E. and Simpson, C. (2023) Assessing the Feasibility of Utilizing a UAS-Based Point Cloud in Pavement Smoothness/Roughness Measurement. Pacific Northwest Transportation Consortium. &gt;http://hdl.handle.net/1773/49798 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref16">
    <label>16</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Nappo, N., Mavrouli, O., Nex, F., van Westen, C., Gambillara, R. and Michetti, A.M. (2021) Use of UAV-Based Photogrammetry Products for Semi-Automatic Detection and Classification of Asphalt Road Damage in Landslide-Affected Areas. Engineering Geology, 294, Article ID: 106363. &gt;https://doi.org/10.1016/j.enggeo.2021.106363
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref17">
    <label>17</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Prosser-Contreras, M., Atencio, E., Muñoz La Rivera, F. and Herrera, R.F. (2020) Use of Unmanned Aerial Vehicles (UAVs) and Photogrammetry to Obtain the International Roughness Index (IRI) on Roads. Applied Sciences, 10, Article 8788. &gt;https://doi.org/10.3390/app10248788
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref18">
    <label>18</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Maeda, H., Sekimoto, Y., Seto, T., Kashiyama, T. and Omata, H. (2018) Road Damage Detection and Classification Using Deep Neural Networks with Smartphone Images. Computer-Aided Civil and Infrastructure Engineering, 33, 1127-1141. &gt;https://doi.org/10.1111/mice.12387
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref19">
    <label>19</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Obunguta, F., Matsushima, K. and Susaki, J. (2024) Probabilistic Management of Pavement Defects with Image Processing Techniques. Journal of Civil Engineering and Management, 30, 114-132. &gt;https://doi.org/10.3846/jcem.2024.20401
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref20">
    <label>20</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Aleadelat, W., Ksaibati, K., Wright, C.H.G. and Saha, P. (2018) Evaluation of Pavement Roughness Using an Android-Based Smartphone. Journal of Transportation Engineering, Part B: Pavements, 144, Article ID: 04018033. &gt;https://doi.org/10.1061/jpeodx.0000058
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref21">
    <label>21</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Aleadelat, W. and Ksaibati, K. (2017) Estimation of Pavement Serviceability Index through Android-Based Smartphone Application for Local Roads. Transportation Research Record: Journal of the Transportation Research Board, 2639, 129-135. &gt;https://doi.org/10.3141/2639-16
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref22">
    <label>22</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Li, X. and Goldberg, D.W. (2018) Toward a Mobile Crowdsensing System for Road Surface Assessment. Computers, Environment and Urban Systems, 69, 51-62. &gt;https://doi.org/10.1016/j.compenvurbsys.2017.12.005
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref23">
    <label>23</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Ahmed, H.U., Hu, L., Yang, X., Bridgelall, R. and Huang, Y. (2021) Effects of Smartphone Sensor Variability in Road Roughness Evaluation. International Journal of Pavement Engineering, 23, 4404-4409. &gt;https://doi.org/10.1080/10298436.2021.1946059
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref24">
    <label>24</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Jeong, J. and Jo, H. (2024) Toward Real-World Implementation of Deep Learning for Smartphone-Crowdsourced Pavement Condition Assessment. IEEE Internet of Things Journal, 11, 6328-6337. &gt;https://doi.org/10.1109/jiot.2023.3312353
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref25">
    <label>25</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Dennis, E.P., Hong, Q., Wallace, R., Tansil, W. and Smith, M. (2014) Pavement Condition Monitoring with Crowdsourced Connected Vehicle Data. Transportation Research Record: Journal of the Transportation Research Board, 2460, 31-38. &gt;https://doi.org/10.3141/2460-04
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref26">
    <label>26</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Bridgelall, R., Hough, J. and Tolliver, D. (2017) Characterising Pavement Roughness at Non-Uniform Speeds Using Connected Vehicles. International Journal of Pavement Engineering, 20, 958-964. &gt;https://doi.org/10.1080/10298436.2017.1366768
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref27">
    <label>27</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Kargah-Ostadi, N., Vasylevskyi, K., Ablets, A. and Drach, A. (2023) Reconciling Pavement Condition Data from Connected Vehicles with the International Roughness Index from Standard Monitoring Equipment Using Physics-Integrated Machine Learning. Transportation Research Record: Journal of the Transportation Research Board, 2678, 416-429. &gt;https://doi.org/10.1177/03611981231174406
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref28">
    <label>28</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Samie, M., Golroo, A., Tavakoli, D. and Fahmani, M. (2023) Potential Applications of Connected Vehicles in Pavement Condition Evaluation: A Brief Review. Road Materials and Pavement Design, 25, 889-913. &gt;https://doi.org/10.1080/14680629.2023.2237597
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref29">
    <label>29</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Mahlberg, J.A., Li, H., Zachrisson, B., Leslie, D.K. and Bullock, D.M. (2022) Pavement Quality Evaluation Using Connected Vehicle Data. Sensors, 22, Article 9109. &gt;https://doi.org/10.3390/s22239109
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref30">
    <label>30</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Mahlberg, J.A., Li, H., Zachrisson, B., Mathew, J.K. and Bullock, D.M. (2024) Applications of Using Connected Vehicle Data for Pavement Quality Analysis. Frontiers in Future Transportation, 4, Article 1239744. &gt;https://doi.org/10.3389/ffutr.2023.1239744
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref31">
    <label>31</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Zhang, Z., Sun, C., Bridgelall, R. and Sun, M. (2018) Application of a Machine Learning Method to Evaluate Road Roughness from Connected Vehicles. Journal of Transportation Engineering, Part B: Pavements, 144, Article ID: 04018043. &gt;https://doi.org/10.1061/jpeodx.0000074
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref32">
    <label>32</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Chen, C., Song, Y., Wang, Y.D., Hu, X. and Liu, J. (2023) A Machine Learning-Based Approach to Assess Impacts of Autonomous Vehicles on Pavement Roughness. Philosophical Transactions of the Royal Society A: Mathematical, Physical and Engineering Sciences, 381, Article ID: 20220176. &gt;https://doi.org/10.1098/rsta.2022.0176
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref33">
    <label>33</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Magnusson, P. and Svantesson, T. (2024) Road Condition Monitoring. US10953887B2. &gt;https://patents.google.com/patent/US10953887B2/en 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref34">
    <label>34</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Mathew, J.K., Li, H., Landvater, H. and Bullock, D.M. (2022) Using Connected Vehicle Trajectory Data to Evaluate the Impact of Automated Work Zone Speed Enforcement. Sensors, 22, Article 2885. &gt;https://doi.org/10.3390/s22082885
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref35">
    <label>35</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Kim, M.Y. and Prozzi, J.A. (2021) Segmentation of Highway Networks for Maintenance Operations. Center for Highway Pavement Preservation, CHPP Report-UTA#8-2021. &gt;https://www.chpp.egr.msu.edu/wp-content/uploads/2021/10/31.-CHPP-Report-UTA8-2021.pdf 
    </mixed-citation>
   </ref>
   <ref id="scirp.138038-ref36">
    <label>36</label>
    <mixed-citation publication-type="other" xlink:type="simple">
     Federal Highway Administration (2024) Office of Highway Policy Information.&gt;https://www.fhwa.dot.gov/policyinformation/pubs/hf/pl11028/chapter7.cfm
    </mixed-citation>
   </ref>
  </ref-list>
 </back>
</article>