<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article  PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd"><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article"><front><journal-meta><journal-id journal-id-type="publisher-id">EPE</journal-id><journal-title-group><journal-title>Energy and Power Engineering</journal-title></journal-title-group><issn pub-type="epub">1949-243X</issn><publisher><publisher-name>Scientific Research Publishing</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.4236/epe.2023.1510017</article-id><article-id pub-id-type="publisher-id">EPE-128183</article-id><article-categories><subj-group subj-group-type="heading"><subject>Articles</subject></subj-group><subj-group subj-group-type="Discipline-v2"><subject>Engineering</subject></subj-group></article-categories><title-group><article-title>
 
 
  Solar Photovoltaics Development in Nigeria: Drivers, Barriers, and Policies
 
</article-title></title-group><contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Abiodun</surname><given-names>Adeola Akinola</given-names></name><xref ref-type="aff" rid="aff1"><sub>1</sub></xref><xref ref-type="corresp" rid="cor1"><sup>*</sup></xref></contrib></contrib-group><aff id="aff1"><label>1</label><addr-line>Energy Policy, Science Policy Research Unit, University of Sussex, Brighton, United Kingdom</addr-line></aff><pub-date pub-type="epub"><day>08</day><month>10</month><year>2023</year></pub-date><volume>15</volume><issue>10</issue><fpage>315</fpage><lpage>328</lpage><history><date date-type="received"><day>14,</day>	<month>August</month>	<year>2023</year></date><date date-type="rev-recd"><day>6,</day>	<month>October</month>	<year>2023</year>	</date><date date-type="accepted"><day>9,</day>	<month>October</month>	<year>2023</year></date></history><permissions><copyright-statement>&#169; Copyright  2014 by authors and Scientific Research Publishing Inc. </copyright-statement><copyright-year>2014</copyright-year><license><license-p>This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/</license-p></license></permissions><abstract><p>
 
 
  Energy access is vital to a nation’s economic growth and its populace’s social well-being. Still, there is a lack of adequate energy in Nigeria, negatively affecting the country’s socio-economic development. Due to the inadequate energy supply, some manufacturing companies shut their operations, and most Nigerians now use backup generators (BUGs) with their attendant health hazards, environmental pollution, and global warming. The need for energy access and a sustainable energy supply through renewable energy (RE) resources necessitates adopting solar photovoltaics (PV) in Nigeria. Studies on Nigeria’s energy accessibility and sustainability are generally on RE development and a few on solar PV applications. This research covers the need for an in-depth analysis of the growth of solar PV in Nigeria, and the research question is: What factors promote or limit the adoption of solar photovoltaics in Nigeria? A method of Systematic Literature Review (SLR) and Thematic Analysis (TA) is employed for the analysis. The research findings are divided into drivers, barriers, and policies. Some identified factors promoting the adoption of solar PV are energy poverty and the urgency to improve electricity supply, the ease of its operation and maintenance, and the Nigerian government’s commitment to clean electricity supply with policy initiatives and increased awareness of solar PV applications. Conversely, some noticed factors mitigating the growth of solar PV are poor tariff systems, dual subsidies of electricity and petroleum, and lack of finance and economic incentives.
 
</p></abstract><kwd-group><kwd>Energy Access</kwd><kwd> Sustainable Energy</kwd><kwd> Renewable Energy</kwd><kwd> Solar Photovoltaics</kwd><kwd> Backup Generators</kwd><kwd> Energy Poverty</kwd></kwd-group></article-meta></front><body><sec id="s1"><title>1. Introduction</title><p>Energy is a bastion of economic growth and development. The lack of adequate energy for household consumption and industrial use in Nigeria is negatively affecting the country’s socio-economic development. Bridge et al. [<xref ref-type="bibr" rid="scirp.128183-ref1">1</xref>] state that energy is fundamental to developing societies, economies, and politics. Due to the inadequate energy supply, some manufacturing companies shut their operations and relocated their branches to other countries. Most Nigerians, including corporate organisations, government offices, and industries, now use backup generators (BUGs) with their attendant negative consequences, such as environmental pollution and global warming. While environmental pollution injures health, global warming leads to the existential challenge of climate change. The lack of adequate electricity slowed Nigeria’s economic growth [<xref ref-type="bibr" rid="scirp.128183-ref2">2</xref>] and led to mass unemployment [<xref ref-type="bibr" rid="scirp.128183-ref3">3</xref>] . Nigeria represents a classic paradox of abundant energy resources and widespread energy poverty, according to Halff et al. [<xref ref-type="bibr" rid="scirp.128183-ref4">4</xref>] . Amidst the abundance of natural energy resources, Nigeria continues to experience a decline in energy production with increased population and energy demand. Access to a sustainable energy supply is vital to social well-being, industrial growth, and economic prosperity. The power crisis in Nigeria will persist unless the government diversifies the energy sources and adopts new technologies [<xref ref-type="bibr" rid="scirp.128183-ref5">5</xref>] , especially renewable energy. According to Bhattacharyya [<xref ref-type="bibr" rid="scirp.128183-ref6">6</xref>] , renewable energies occupy an essential place in any strategy for sustainable energy development. Abdullahi et al. [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>] suggest that solar PV electricity is the ultimate strategy to achieve sustainable development. At the same time, Muye [<xref ref-type="bibr" rid="scirp.128183-ref8">8</xref>] describes solar energy as the most promising renewable energy source because of its limitless potential. The need for diversification to sustainable energy generation through Renewable Energy (RE) resources necessitates the adoption of solar energy by the Nigerian government. Renewable Energy (RE) resources are primary energy sources with a capacity for regeneration [<xref ref-type="bibr" rid="scirp.128183-ref1">1</xref>] . Solar energy is obtained directly from the sun’s radiation, while photovoltaics (PV) converts solar energy to electricity. Solar PV produces electricity directly from sunlight through a photocell [<xref ref-type="bibr" rid="scirp.128183-ref9">9</xref>] . Solar PV offers clean electricity, improving electricity supply and ensuring electricity generation’s sustainability.</p></sec><sec id="s2"><title>2. Literature Review</title><p>Most studies on energy access and sustainability are generally concerned with renewable energy (RE) development but are not specific on solar PV development. However, there are some studies on the development of solar PV in Nigeria [<xref ref-type="bibr" rid="scirp.128183-ref3">3</xref>] [<xref ref-type="bibr" rid="scirp.128183-ref5">5</xref>] [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>] [<xref ref-type="bibr" rid="scirp.128183-ref10">10</xref>] - [<xref ref-type="bibr" rid="scirp.128183-ref17">17</xref>] . Nevertheless, these studies have yet to explain in-depth the characteristics and growth of solar PV in Nigeria. Beyond its development, it is imperative to understand the specifics of solar photovoltaics (PV), such as its classifications, limitations, advantages, and environmental pollution. And importantly, the proliferation of backup generators (BUGs) as it affects the growth of solar PV, being a readily available alternative source to grid electricity.</p><sec id="s2_1"><title>2.1. Classification of Solar Photovoltaic</title><p>Solar Photovoltaic (PV) applications are classified into three: solar lanterns, solar home systems (<xref ref-type="fig" rid="fig1">Figure 1</xref>), and solar mini-grids (<xref ref-type="fig" rid="fig2">Figure 2</xref>). Solar lantern is defined as small solar units of less than 10 Wp, while the solar home system ranges from 10 Wp to 150 Wp, and solar mini-grid is defined as an isolated grouping of electricity [<xref ref-type="bibr" rid="scirp.128183-ref4">4</xref>] . Solar mini-grid or solar grid combines multiple solar panels and associated equipment. The different classifications of solar PV offer the users the flexibility of choice depending on the applications.</p></sec><sec id="s2_2"><title>2.2. Limitations of Solar Photovoltaic</title><p>There are some limitations to solar Photovoltaic (PV) applications, notwithstanding their general adoption. Solar PV needs an energy backup due to the intermittency of solar energy; thus, battery energy storage is applied. A feature common to renewable energy resources, especially solar resources, is light energy density, as compared to the energy from fossil fuel resources, implying larger solar energy systems are needed to produce limited electricity. The cost of installation of solar energy systems is high, especially the batteries. Solar PV limitations are summarised as storage issues and high price [<xref ref-type="bibr" rid="scirp.128183-ref1">1</xref>] , low-energy capacities [<xref ref-type="bibr" rid="scirp.128183-ref11">11</xref>] , intermittency of supply [<xref ref-type="bibr" rid="scirp.128183-ref3">3</xref>] and security of the installation, i.e., the location of the solar panels.</p></sec><sec id="s2_3"><title>2.3. Advantages of Solar Photovoltaic</title><p>Notwithstanding its limitations, solar Photovoltaic (PV) has some advantages that accelerate its growth as an alternative electricity supply. It has low operational and maintenance costs [<xref ref-type="bibr" rid="scirp.128183-ref12">12</xref>] and promotes decentralisation of Nigeria’s electricity system [<xref ref-type="bibr" rid="scirp.128183-ref5">5</xref>] . A significant advantage of solar energy is its abundance and infinite nature. Solar energy is non-exhaustive and non-rivalrous. While the installation cost had been a cause of concern, Arent et al. [<xref ref-type="bibr" rid="scirp.128183-ref18">18</xref>] state that the cost of generating solar PV electricity has reduced considerably due to its increasing adoption. Still, Abdullahi et al. [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>] believe that the reduction in the cost of solar PV electricity is due to technological breakthroughs. The gradual decrease in the cost of solar PV materials is due to factors such as economies of scale, technological innovations, and financial incentives. Another advantage of solar PV is its variety and flexibility of applications across solar lanterns, solar home systems and mini-grids.</p></sec><sec id="s2_4"><title>2.4. Environmental Pollution from Solar Photovoltaic</title><p>Most studies present solar Photovoltaic (PV) as clean energy without a negative environmental impact and carbon emissions. It is of note that battery, a constituent of solar PV, poses a significant environmental challenge. The battery does not emit carbon during usage, but mining the raw material for its production causes substantial environmental degradation. In addition, the discharge of a used battery after its lifecycle is toxic to the environment. Lastly, storing arrays of batteries within a residential setting (<xref ref-type="fig" rid="fig1">Figure 1</xref>(b)) indirectly pollutes the household and leads to discomfort for solar PV users. Oghogho et al. [<xref ref-type="bibr" rid="scirp.128183-ref12">12</xref>] also argue that the by-products of manufacturing and utilising solar PV constitute environmental hazards.</p></sec><sec id="s2_5"><title>2.5. Proliferation of Backup Generators in Nigeria</title><p>Back-up generators (BUGs) have an installed capacity of 8 - 14 GW in Nigeria, serving approximately 80 per cent of Nigerians [<xref ref-type="bibr" rid="scirp.128183-ref19">19</xref>] . Okoye et al. [<xref ref-type="bibr" rid="scirp.128183-ref14">14</xref>] present data about Nigeria’s peak electricity generation and peak demand in 2013 and 2015. In comparing these data, it is evident that while the peak generation decreased during those years, the peak demand increased. To cover these shortfalls in electricity generation, people resolved to adopt BUGs (<xref ref-type="fig" rid="fig3">Figure 3</xref>). According to Adewuyi et al. [<xref ref-type="bibr" rid="scirp.128183-ref20">20</xref>] , despite the vast potential of solar energy, with an estimated generation capacity of around 43,000 MW, many Nigerians depend on inefficient and costly diesel and petrol combustion engine generators to meet energy. However, the broad adoption of BUGs has plenty of negative consequences, as Akin [<xref ref-type="bibr" rid="scirp.128183-ref21">21</xref>] reveals that using BUGs affects both the local and the global environment. Locally, the use of BUGs causes significant environmental and noise pollution, while globally, BUGs constitute a substantial contribution to global warming. In addition to the environmental and noise pollution, there is continuously a record of death across Nigeria resulting from inhaling the fumes</p><p>from the BUGs. Oguntoke and Adeyemi [<xref ref-type="bibr" rid="scirp.128183-ref22">22</xref>] suggest adopting a policy regulating BUGs, while Akin [<xref ref-type="bibr" rid="scirp.128183-ref21">21</xref>] recommends adopting solar PV to reduce the nation’s dependence on alternative energy solutions such as the BUGs. In terms of cost, the use of BUGs is more expensive compared to solar PV. While solar PV is costly at the point of installation, the zero operation and maintenance cost has given it an advantage over BUGs. Okoye et al. [<xref ref-type="bibr" rid="scirp.128183-ref14">14</xref>] compared the cost of electricity from BUGs and solar PV and discovered that it is more expensive to use BUGs than solar PV.</p></sec></sec><sec id="s3"><title>3. Methodology</title><p>The research uses secondary data and employs a Systematic Literature Review (SLR) method. A total of ninety-eight peer-reviewed journal articles on studies related to renewable energy development and solar photovoltaics applications in Nigeria were sourced from Google Scholar. In addition, twelve reports and policy documents were collected from relevant agencies and organisations. Lastly, eight books were obtained to complement the peer-reviewed journal articles, reports, and policy documents. A preliminary review of the entire secondary data was followed by a systematic literature review of thirty-four documents comprising twenty-three peer-reviewed journal articles, six reports and policy documents, and five books. A thematic analysis of the data reveals three trends: the elements promoting the development of solar photovoltaics, the factors mitigating its growth, and lastly, the policies accelerating its penetration. These three themes extracted from the SLR form the conceptual framework of this research, upon which the conclusions are drawn.</p></sec><sec id="s4"><title>4. Results</title><p>Solar photovoltaic (PV) applications in Nigeria date back to the 1970s, and it became remarkable in 1980 when the Solar Energy Society of Nigeria (SESN) was established [<xref ref-type="bibr" rid="scirp.128183-ref24">24</xref>] . SESN is an association of solar products importers, marketers, and solar energy producers. The acceptance of solar PV gained momentum in Nigeria following the government’s initiative to create the Council for Renewable Energy Nigeria (CREN) in 2004 [<xref ref-type="bibr" rid="scirp.128183-ref25">25</xref>] . CREN is an agency of the Federal Government of Nigeria with the mandate to promote renewable energy and reduce the consumption of fossil fuels. Despite the early momentum, four decades after the establishment of SESN and nearly two decades after the creation of CREN, the adoption of solar PV technology seems to have fallen short of expectations amidst the abundance of solar resources in Nigeria. Recently, there has been a collaborative effort between the government, private solar PV producers and consumers to accelerate the growth of solar PV in Nigeria.</p><sec id="s4_1"><title>4.1. Adoption of Solar Photovoltaic</title><p>Nigeria receives about 4909.212 kWh of energy from the sun, equivalent to about 1.082 million tons of oil [<xref ref-type="bibr" rid="scirp.128183-ref8">8</xref>] . Solar radiation is fairly distributed in Nigeria, as displayed by the map of Nigeria in <xref ref-type="fig" rid="fig4">Figure 4</xref> showing the global solar irradiation. <xref ref-type="fig" rid="fig4">Figure 4</xref> indicates the spread of solar power across Nigeria, making everywhere suitable for solar PV applications nationwide. Muye [<xref ref-type="bibr" rid="scirp.128183-ref8">8</xref>] provides a broader range of solar irradiance in Nigeria. He says the solar energy potential in Nigeria ranges between 3.5 - 7.5 kWh/m<sup>2</sup>/day, with peak radiation in the North-Eastern part of the country.</p><p>Amid the abundance of solar energy resources in Nigeria, only a few states, such as Bauchi, Delta, Enugu, Lagos, Oyo, and Sokoto, have used solar PV to reduce their electricity burdens [<xref ref-type="bibr" rid="scirp.128183-ref26">26</xref>] . Emodi and Boo [<xref ref-type="bibr" rid="scirp.128183-ref27">27</xref>] reveal that some Northern states of the country, such as Kano and Katsina, have solar PV projects. Though solar PV deployment in the Northern part of the country did not occur until 1985 for rural electrification, it was followed by water pumping and</p><p>telecommunication in the subsequent years [<xref ref-type="bibr" rid="scirp.128183-ref15">15</xref>] . Yahaya and Sambo, cited in [<xref ref-type="bibr" rid="scirp.128183-ref15">15</xref>] , identified some of the solar PV projects in the North as the 7 kWp Gotomo village solar PV lighting in 1985 and the 7.2 kWp Kwakwalawa community solar PV electrification in 1993. The Nigerian telecommunications carrier, Nigeria Telecommunications (NITEL), recognised the positive impact of solar PV and incorporated it into the NITEL system in 1991; the Federal Ministry of Water Resources and Rural Development also installed solar PV water pumping machines across Nigeria in 1998 [<xref ref-type="bibr" rid="scirp.128183-ref15">15</xref>] . Despite these seemingly progressive developments of solar PV in Nigeria, Ohunakin et al. [<xref ref-type="bibr" rid="scirp.128183-ref13">13</xref>] believe that the deployment of solar technology in Nigeria is slow, corroborated by Bamisile et al. [<xref ref-type="bibr" rid="scirp.128183-ref11">11</xref>] with their opinion that solar PV is less utilised in Nigeria.</p></sec><sec id="s4_2"><title>4.2. Integration of Solar Photovoltaic into the Electricity Mix</title><p>Solar PV has not been integrated into the national grid because Nigeria lacks utility-scale solar PV plants. While the Nigerian government targets a 2785 MW installed capacity of solar PV by 2020 [<xref ref-type="bibr" rid="scirp.128183-ref28">28</xref>] , Ozoegwu et al. [<xref ref-type="bibr" rid="scirp.128183-ref3">3</xref>] confirm that grid-connected solar PV does not currently exist in Nigeria. A report obtained from the Energy Commission of Nigeria [<xref ref-type="bibr" rid="scirp.128183-ref29">29</xref>] shows that in 2016, the Federal Government (FG) signed a Power Purchase Agreement (PPA) with local and international utility-scale developers expected to add 1200 MW solar PV capacity to the grid, as shown in <xref ref-type="table" rid="table1">Table 1</xref>. However, findings reveal that as of 2018, all the</p><table-wrap id="table1" ><label><xref ref-type="table" rid="table1">Table 1</xref></label><caption><title> Power Purchase Agreement (PPA) with local and international utility-scale developers [<xref ref-type="bibr" rid="scirp.128183-ref29">29</xref>] </title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Company/Developer</th><th align="center" valign="middle" >Capacity (MW)</th><th align="center" valign="middle" >Location (State)</th></tr></thead><tr><td align="center" valign="middle" >Access Power</td><td align="center" valign="middle" >50</td><td align="center" valign="middle" >Kaduna</td></tr><tr><td align="center" valign="middle" >Afrinergia</td><td align="center" valign="middle" >50</td><td align="center" valign="middle" >Nasarawa</td></tr><tr><td align="center" valign="middle" >Anjeed Innova</td><td align="center" valign="middle" >10</td><td align="center" valign="middle" >Kaduna</td></tr><tr><td align="center" valign="middle" >CT Cosmos’s</td><td align="center" valign="middle" >70</td><td align="center" valign="middle" >Plateau</td></tr><tr><td align="center" valign="middle" >En Africa</td><td align="center" valign="middle" >50</td><td align="center" valign="middle" >Kaduna</td></tr><tr><td align="center" valign="middle" >GreenWish Partners/Motir DuSable</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Enugu</td></tr><tr><td align="center" valign="middle" >GreenWish Partners</td><td align="center" valign="middle" >50</td><td align="center" valign="middle" >Kaduna</td></tr><tr><td align="center" valign="middle" >GreenWish Partners/Oriental Renewable</td><td align="center" valign="middle" >50</td><td align="center" valign="middle" >Jigawa</td></tr><tr><td align="center" valign="middle" >Kvk Power’s</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Sokoto</td></tr><tr><td align="center" valign="middle" >LR Aaron Power</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Abuja</td></tr><tr><td align="center" valign="middle" >Nova Scotia Power Development</td><td align="center" valign="middle" >80</td><td align="center" valign="middle" >Jigawa</td></tr><tr><td align="center" valign="middle" >Pan Africa Solar &amp; JCM Power</td><td align="center" valign="middle" >75</td><td align="center" valign="middle" >Katsina</td></tr><tr><td align="center" valign="middle" >Middle Band Solar One</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Kogi</td></tr><tr><td align="center" valign="middle" >Motir Dusable</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Nasarawa</td></tr><tr><td align="center" valign="middle" >Nigerian Solar Capital Partners</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Bauchi</td></tr><tr><td align="center" valign="middle" >Nova Solar 5</td><td align="center" valign="middle" >100</td><td align="center" valign="middle" >Katsina</td></tr></tbody></table></table-wrap><p>projects have yet to commence due to bureaucratic delays from NBET [<xref ref-type="bibr" rid="scirp.128183-ref19">19</xref>] . How the 1200 MW solar capacity would be added to the grid is unclear because the Nigeria grid network is overloaded, resulting in frequent grid collapse.</p></sec><sec id="s4_3"><title>4.3. Drivers of Solar Photovoltaic in Nigeria</title><p>The main driver of solar Photovoltaic (PV) in Nigeria is energy poverty and irregular electricity supply. The consumer’s choice of solar PV over the existing systems also stems from the need for reliable electricity. Despite Nigeria being a signatory to the Paris Agreement, climate change mitigation does not form part of solar PV development drivers in Nigeria. A 2018 report from the Intergovernmental Panel on Climate Change (IPCC) cited in [<xref ref-type="bibr" rid="scirp.128183-ref30">30</xref>] states that policymakers are not cognisant of the climate impact of the existing electricity sources. Most of the policies or strategies of the Nigerian government to promote the growth of solar PV are to bridge the gap in electricity generation and demand, not for climate change mitigation (<xref ref-type="table" rid="table2">Table 2</xref>).</p></sec><sec id="s4_4"><title>4.4. Factors Mitigating the Growth of Solar Photovoltaic in Nigeria</title><p>A comprehensive list of barriers to the emergence of solar PV in Nigeria, as revealed by different authors and their recommendations, is compiled and presented in <xref ref-type="table" rid="table3">Table 3</xref>.</p></sec><sec id="s4_5"><title>4.5. Policies Aim at Promoting the Emergence of Solar Photovoltaic in Nigeria</title><p>Energy policy combines intergovernmental responsibilities and market agreements, leading to complex regulatory and action frameworks [<xref ref-type="bibr" rid="scirp.128183-ref33">33</xref>] . The Federal Government of Nigeria plans to incorporate solar PV into the electricity mix so that solar PV electricity would constitute 1.26 per cent, 6.92 per cent, and 15.27 per cent of Nigeria’s electricity mix by 2015, 2020, and 2030, respectively [<xref ref-type="bibr" rid="scirp.128183-ref11">11</xref>] . Consequently, the following policies have been formulated: Public-Private Partnership (PPP) [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>] , National Renewable Energy and Energy Efficiency Policy, and National Renewable Energy Action Plan [<xref ref-type="bibr" rid="scirp.128183-ref28">28</xref>] . <xref ref-type="table" rid="table4">Table 4</xref> reveals other policies</p><table-wrap id="table2" ><label><xref ref-type="table" rid="table2">Table 2</xref></label><caption><title> Drivers of solar photovoltaic development in Nigeria (Source: Compiled by the author)</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Paper</th><th align="center" valign="middle" >Drivers of Solar Photovoltaic in Nigeria</th></tr></thead><tr><td align="center" valign="middle" >Okoye et al. [<xref ref-type="bibr" rid="scirp.128183-ref14">14</xref>]</td><td align="center" valign="middle" >Development of a Renewable Master Plan. Establishment of a Taskforce on Power. Privatisation of the Utilities Companies.</td></tr><tr><td align="center" valign="middle" >Abdullahi et al. [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>]</td><td align="center" valign="middle" >Research Centres and Energy Institutions. Electricity production deficits. International Agencies.</td></tr><tr><td align="center" valign="middle" >Ugulu [<xref ref-type="bibr" rid="scirp.128183-ref17">17</xref>]</td><td align="center" valign="middle" >Power outages. Energy cost-savings. Access to finance.</td></tr></tbody></table></table-wrap><table-wrap-group id="3"><label><xref ref-type="table" rid="table3">Table 3</xref></label><caption><title> Barriers to solar photovoltaic development in Nigeria (Source: Compiled by the Author)</title></caption><table-wrap id="3_1"><table><tbody><thead><tr><th align="center" valign="middle" >Paper</th><th align="center" valign="middle" >Hindrances</th><th align="center" valign="middle" >Recommendation</th></tr></thead><tr><td align="center" valign="middle" >Adewuyi et al. [<xref ref-type="bibr" rid="scirp.128183-ref20">20</xref>]</td><td align="center" valign="middle" >Poor tariff system. Outdated metering. Political dynamics. High capital cost.</td><td align="center" valign="middle" >Rehabilitation of existing infrastructure. Investment in research and development. Decentralisation of the electricity market.</td></tr><tr><td align="center" valign="middle" >Oyedepo [<xref ref-type="bibr" rid="scirp.128183-ref5">5</xref>]</td><td align="center" valign="middle" >Sales of electricity to incompetent private investors. Remote and rural areas are not attractive to private investors.</td><td align="center" valign="middle" >Full exploitation and promotion of renewable energy resources. Energy efficiency practices and energy conservation measures.</td></tr><tr><td align="center" valign="middle" >Ajayi and Ajayi [<xref ref-type="bibr" rid="scirp.128183-ref10">10</xref>]</td><td align="center" valign="middle" >Weak government motivation. Lack of economic incentives. Multiple taxation. High customs and excise duty. Unfavourable land use act.</td><td align="center" valign="middle" >Provision of tax holidays and harmonisation of tax payments. Obligation of utility company to purchase RE electricity. Legal framework to connect RE to the national grid.</td></tr><tr><td align="center" valign="middle" >Ojo [<xref ref-type="bibr" rid="scirp.128183-ref31">31</xref>]</td><td align="center" valign="middle" >Overlapping regulatory roles. Finance and investment. Technology development. Limited public awareness. Poor quality control measure.</td><td align="center" valign="middle" >Viable legal and regulatory framework. Attraction of Foreign Direct Investment. Public Private Partnership. Feed-in tariffs. Financial incentives.</td></tr><tr><td align="center" valign="middle" >Osunmuyiwa et al. [<xref ref-type="bibr" rid="scirp.128183-ref26">26</xref>]</td><td align="center" valign="middle" >Rigid, complex, and centralised electricity system. Double subsidies on petroleum and electricity.</td><td align="center" valign="middle" >Cost-effective electricity tariffs. Private sector participation.</td></tr><tr><td align="center" valign="middle" >Shaaban and Petinrin [<xref ref-type="bibr" rid="scirp.128183-ref32">32</xref>]</td><td align="center" valign="middle" >Renewable Obligation. Feed-in-Tariffs. Energy efficiency.</td><td align="center" valign="middle" >Decentralised electricity generation from solar PV. Joint participation of private sector and consumer.</td></tr><tr><td align="center" valign="middle" >Bamisile et al. [<xref ref-type="bibr" rid="scirp.128183-ref11">11</xref>]</td><td align="center" valign="middle" >Politics and Poor Governance. Non-implementation of solar PV policies. Lack of private investors. Energy literacy of people.</td><td align="center" valign="middle" >VAT reduction on solar equipment. Feed-in-tariffs Capital grants, subsidies, or rebates. Biofuel obligations.</td></tr><tr><td align="center" valign="middle" >Okoye et al. [<xref ref-type="bibr" rid="scirp.128183-ref14">14</xref>]</td><td align="center" valign="middle" >Lack of solar radiation measuring device.</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >Oghogho et al. [<xref ref-type="bibr" rid="scirp.128183-ref12">12</xref>]</td><td align="center" valign="middle" >Long energy pay-back time. Ignorance of the benefits of technology. Requirement of a large expanse of land. Low efficiency of PV panels. Lack of policies and legislation.</td><td align="center" valign="middle" >The political will to formulate policies geared to promote the application of solar PV. Commitment to investment in solar PV project. Local capacity development through the manufacturing of solar components.</td></tr><tr><td align="center" valign="middle" >Oji et al. [<xref ref-type="bibr" rid="scirp.128183-ref9">9</xref>]</td><td align="center" valign="middle" >Financial constraints. Technological incapability.</td><td align="center" valign="middle" >Subsidies on the importation of solar equipment. Restriction on importation of diesel and petrol generators.</td></tr><tr><td align="center" valign="middle" >Abdullahi et al. [<xref ref-type="bibr" rid="scirp.128183-ref7">7</xref>]</td><td align="center" valign="middle" >Inadequate solar initiative research. Lack of technological know-how Short-term policies Political instability.</td><td align="center" valign="middle" >Sensitisation and awareness initiatives. Introduction of courses on handling solar equipment in higher institutions. A special fund to subsidise the production of solar equipment.</td></tr></tbody></table></table-wrap><table-wrap id="3_2"><table><tbody><thead><tr><th align="center" valign="middle" >Ugulu [<xref ref-type="bibr" rid="scirp.128183-ref17">17</xref>]</th><th align="center" valign="middle" >Use of sub-standard products Lack of government incentive Lack of protection for the infant industry.</th><th align="center" valign="middle" >Regulatory intervention Promotional strategies Financial support to facilitate uptake.</th></tr></thead><tr><td align="center" valign="middle" >Nwokocha et al. [<xref ref-type="bibr" rid="scirp.128183-ref16">16</xref>]</td><td align="center" valign="middle" >Market failure and distortions Security of installations</td><td align="center" valign="middle" >Renewable energy education Resources planning and administration.</td></tr><tr><td align="center" valign="middle" >[<xref ref-type="bibr" rid="scirp.128183-ref19">19</xref>]</td><td align="center" valign="middle" >Poor wheeling capacity of transmission line and unreliable network system. Development of standardised business models Legal and Administrative bottleneck. Natural disasters, such as heavy winds.</td><td align="center" valign="middle" >Power Purchase Agreements. Tariff regulation. Codes and Standards. Loan, leasing, and grant. Favourable import condition.</td></tr></tbody></table></table-wrap></table-wrap-group><table-wrap id="table4" ><label><xref ref-type="table" rid="table4">Table 4</xref></label><caption><title> Policy statement aims at accelerating the emergence of solar photovoltaic in Nigeria [<xref ref-type="bibr" rid="scirp.128183-ref34">34</xref>] </title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Policy</th><th align="center" valign="middle" >Statement</th></tr></thead><tr><td align="center" valign="middle" >Solar</td><td align="center" valign="middle" >The nation shall aggressively pursue integrating solar energy into the energy mix. The nation shall keep abreast of worldwide developments in solar energy technology. The nation shall utilise solar energy resources where it is more cost-effective. The nation shall support the establishment of local manufacturing industries for solar energy. The nation shall encourage individual and corporate bodies to generate solar power and feed into the grid. The nation shall encourage research and development in solar energy technology.</td></tr><tr><td align="center" valign="middle" >Electricity</td><td align="center" valign="middle" >The nation shall create an enabling environment to ensure a reliable and competitive electric supply. The nation shall continue to promote private sector participation in the electricity sector. The nation shall continue to pursue measures to ensure a strong and diversified energy mix. The nation shall pursue market competitive and sustainable power. The nation shall encourage the state and local governments to provide access to electricity to the rural areas through off-grid.</td></tr><tr><td align="center" valign="middle" >Finance</td><td align="center" valign="middle" >Investments in the nation’s energy sector shall be accorded high priority. The nation shall provide a financing policy framework for achieving sustainable development. The nation shall explore local and international financing options for exploiting its energy resources. The nation shall encourage an increase in domestic and foreign private investments. The nation shall implement an Integrated Infrastructure Master Plan for cross-sectoral harmony and a financing framework.</td></tr><tr><td align="center" valign="middle" >Local content and Manpower development</td><td align="center" valign="middle" >The nation shall encourage the use of locally available Resources in all aspects of the energy sector in Nigeria. The nation shall promote manpower development and training in the nation’s energy sector.</td></tr><tr><td align="center" valign="middle" >Research and Development (R &amp; D)</td><td align="center" valign="middle" >The nation’s energy resources shall be developed and utilised sustainably through research and development. All viable innovation generated from R&amp;D activities should be protected with Intellectual Property (IP) rights.</td></tr></tbody></table></table-wrap><p>extracted from the National Energy Policy [<xref ref-type="bibr" rid="scirp.128183-ref34">34</xref>] adopted to fast-track the emergence of solar PV in Nigeria. The slow emergence of solar PV in Nigeria is attributed to poor policy implementation Ozoegwu et al. [<xref ref-type="bibr" rid="scirp.128183-ref3">3</xref>] . Oghogho et al. [<xref ref-type="bibr" rid="scirp.128183-ref12">12</xref>] advised that the government should make a pragmatic effort to implement the adopted policies.</p></sec></sec><sec id="s5"><title>5. Conclusion</title><p>This research offers a comprehensive qualitative review of the characteristics and development of solar photovoltaics (PV) in Nigeria. It presents a broad understanding of solar PV, its technology, and the attendant adoption of Backup generators (BUGs). The research also explores and summarises the drivers, barriers, and policies of solar PV development in Nigeria. While the lack of access to electricity resulted in the general shift to alternative energy sources, specifically backup generators, the Federal Government has several policy initiatives to accelerate the development of solar PV. Currently, solar PV application in Nigeria is mainly solar home system with limited solar mini-grids and a noticeable absence of grid-connected solar power. Nevertheless, there is increasing adoption of the solar mini-grid across the country due to the collective effort of government, international agencies, and private developers.</p><sec id="s5_1"><title>5.1. Recommendation</title><p>The research makes the following critical recommendations: the removal of the double subsidies on electricity and petroleum products; the introduction of import duty tax on BUGs; the implementation of government policies or strategies to facilitate the development of solar PV in Nigeria; the introduction of incentives for solar PV applications; the creation of awareness of the policies and incentives towards the promotion of solar PV applications; and broadening the applications of solar PV across various usages such as lanterns, home systems, street lighting, grid and off-grid, as revealed in <xref ref-type="fig" rid="fig5">Figure 5</xref>. The research also recommends that the Federal Government establish an agency, Solar Photovoltaics Development Commission (SPVDC), whose sole mandate would be to FastTrack the solar PV development and the deployment of its technologies in Nigeria.</p></sec><sec id="s5_2"><title>5.2. Implication</title><p>Implementing the research recommendations offers the government of Nigeria a two-pronged solution to the challenges of energy accessibility and sustainability, alleviating energy poverty and mitigating climate change. In 2015, Nigeria joined other United Nations (UN) countries in France to sign the Paris Agreement to mitigate climate change by reducing global warming associated with carbon emissions, mainly from fossil fuel energy resources. Similarly, in the same year (2015), the United Nations (UN) Sustainable Development Goals (SDGs) advocated for sustainable energy for all by 2030 (Goal 7) and urged for climate action (Goal 13). Thus, the outcome of this research is relevant to two UN SDGs and the Paris Agreement.</p></sec></sec><sec id="s6"><title>Conflicts of Interest</title><p>The author declares that there is no conflict of interest concerning this research. The research was part of the author’s MSc dissertation at the University of Sussex, Brighton, United Kingdom. The author also proclaims that no funding or scholarship was received for the MSc or this research.</p></sec><sec id="s7"><title>Cite this paper</title><p>Akinola, A.A. (2023) Solar Photovoltaics Development in Nigeria: Drivers, Barriers, and Policies. Energy and Power Engineering, 15, 315-328. https://doi.org/10.4236/epe.2023.1510017</p></sec></body><back><ref-list><title>References</title><ref id="scirp.128183-ref1"><label>1</label><mixed-citation publication-type="other" xlink:type="simple">Bridge, G., Barr, S., Bouzarovski, S., Bradshaw, M., Brown, E., Bulkeley, H. and Walker, G. (2018) Energy and Development. Routledge, New York.</mixed-citation></ref><ref id="scirp.128183-ref2"><label>2</label><mixed-citation publication-type="other" xlink:type="simple">European Union/Nigerian Energy Support Programme (2015) The Nigerian Energy Sector: An Overview with a Particular Emphasis on Renewable Energy, Energy Efficiency and Rural Electrification. 2nd Edition, GOPA-International Energy Consultants GmbH, Bad Homburg vor der Hohe.</mixed-citation></ref><ref id="scirp.128183-ref3"><label>3</label><mixed-citation publication-type="other" xlink:type="simple">Ozoegwu, C.G., Mgbemene, C.A. and Ozor, P.A. (2017) The Status of Solar Energy Integration and Policy in Nigeria. Renewable and Sustainable Energy Reviews, 70, 457-471. https://doi.org/10.1016/j.rser.2016.11.224</mixed-citation></ref><ref id="scirp.128183-ref4"><label>4</label><mixed-citation publication-type="other" xlink:type="simple">Halff, A., Sovacool, B.K. and Rozhon, J. (2014) Energy Poverty: Global Challenges and Local Solutions. Oxford University Press, Oxford. https://doi.org/10.1093/acprof:oso/9780199682362.001.0001</mixed-citation></ref><ref id="scirp.128183-ref5"><label>5</label><mixed-citation publication-type="other" xlink:type="simple">Oyedepo, S.O. (2012) Energy and Sustainable Development in Nigeria: The Way Forward. Energy, Sustainability and Society, 2, Article No. 15. https://doi.org/10.1186/2192-0567-2-15</mixed-citation></ref><ref id="scirp.128183-ref6"><label>6</label><mixed-citation publication-type="other" xlink:type="simple">Bhattacharyya, S.C. (2006) Renewable Energies and the Poor: Niche or Lexus? Energy Policy, 34, 659-663. https://doi.org/10.1016/j.enpol.2004.08.009</mixed-citation></ref><ref id="scirp.128183-ref7"><label>7</label><mixed-citation publication-type="other" xlink:type="simple">Abdullahi, D., Suresh, S., Renukappa, S. and Oloke, D. (2017) Key Barriers to Implementing Solar Energy in Nigeria: A Critical Analysis. IOP Conference Series: Earth and Environmental Science, 83, Article ID: 012015. https://iopscience.iop.org/article/10.1088/1755-1315/83/1/012015/meta https://doi.org/10.1088/1755-1315/83/1/012015</mixed-citation></ref><ref id="scirp.128183-ref8"><label>8</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Muye</surname><given-names> H.M. </given-names></name>,<etal>et al</etal>. (<year>2016</year>)<article-title>Adoption of Solar Energy Systems in Remote and Rural Communities of Nigeria</article-title><source> The International Journal of Science &amp; Technology</source><volume> 4</volume>,<fpage> 23</fpage>-<lpage>28</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.128183-ref9"><label>9</label><mixed-citation publication-type="other" xlink:type="simple">Oji, J.O., Idusuyi, N., Aliu, T.O., Pentinrin, M.O., Odejobi, O.A. and Adetunji, A.R. (2012) Utilization of Solar Energy for Power Generation in Nigeria. International Journal of Energy Engineering, 2, 54-59. https://doi.org/10.5923/j.ijee.20120202.07</mixed-citation></ref><ref id="scirp.128183-ref10"><label>10</label><mixed-citation publication-type="other" xlink:type="simple">Ajayi, O.O. and Ajayi, O.O. (2013) Nigeria’s Energy Policy: Inferences, Analysis and Legal Ethics toward RE Development. Energy Policy, 60, 61-67. https://doi.org/10.1016/j.enpol.2013.05.095</mixed-citation></ref><ref id="scirp.128183-ref11"><label>11</label><mixed-citation publication-type="other" xlink:type="simple">Bamisile, O., Dagbasi, M., Babatunde, A. and Ayodele, O. (2017) A Review of Renewable Energy Potential in Nigeria: Solar Power Development over the Years. Engineering and Applied Science Research, 44, 242-248.</mixed-citation></ref><ref id="scirp.128183-ref12"><label>12</label><mixed-citation publication-type="other" xlink:type="simple">Oghogho, I., Sulaimon, O., Adedayo, B.A., Egbune, D. and Kenechi, A.V. (2014) Solar Energy Potential and Its Development for Sustainable Energy Generation in Nigeria: A Road Map to Achieving This Feat. International Journal of Engineering and Management Sciences, 5, 61-67.</mixed-citation></ref><ref id="scirp.128183-ref13"><label>13</label><mixed-citation publication-type="other" xlink:type="simple">Ohunakin, O.S., Adaramola, M.O., Oyewola, O.M. and Fagbenle, R.O. (2014) Solar Energy Applications and Development in Nigeria: Drivers and Barriers. Renewable and Sustainable Energy Reviews, 32, 294-301. https://doi.org/10.1016/j.rser.2014.01.014</mixed-citation></ref><ref id="scirp.128183-ref14"><label>14</label><mixed-citation publication-type="other" xlink:type="simple">Okoye, C.O., Taylan, O. and Baker, D.K. (2016) Solar Energy Potentials in Strategically Located Cities in Nigeria: Review, Resource Assessment and PV System Design. Renewable and Sustainable Energy Reviews, 55, 550-566. https://doi.org/10.1016/j.rser.2015.10.154</mixed-citation></ref><ref id="scirp.128183-ref15"><label>15</label><mixed-citation publication-type="other" xlink:type="simple">Oparaku, O.U. (2002) Photovoltaic Systems for Distributed Power Supply in Nigeria. Renewable Energy, 25, 31-40.https://doi.org/10.1016/S0960-1481(00)00203-2</mixed-citation></ref><ref id="scirp.128183-ref16"><label>16</label><mixed-citation publication-type="other" xlink:type="simple">Nwokocha, C.O., Okoro, U.K. and Usoh, C.I. (2018) Photovoltaics in Nigeria: Awareness, Attitude and Expected Benefit Based on a Qualitative Survey across Regions. Renewable Energy, 116, 176-182. https://doi.org/10.1016/j.renene.2017.09.070</mixed-citation></ref><ref id="scirp.128183-ref17"><label>17</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Ugulu</surname><given-names> A.I. </given-names></name>,<etal>et al</etal>. (<year>2019</year>)<article-title>Barriers and Motivations for Solar Photovoltaic (PV) Adoption in Urban Nigeria</article-title><source> International Journal of Sustainable Energy Planning and Management</source><volume> 21</volume>,<fpage> 19</fpage>-<lpage>34</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.128183-ref18"><label>18</label><mixed-citation publication-type="other" xlink:type="simple">Arent, D., Arndt, C., Miller, M., Tarp, F. and Zinaman, O. (2017) The Political Economy of Clean Energy Transition. Oxford University Press, Oxford. https://doi.org/10.1093/oso/9780198802242.001.0001</mixed-citation></ref><ref id="scirp.128183-ref19"><label>19</label><mixed-citation publication-type="other" xlink:type="simple">Nigeria-German Business Association (2018) Enabling Solar PV in Nigeria. German Solar Association (BSW-Solar), Berlin.</mixed-citation></ref><ref id="scirp.128183-ref20"><label>20</label><mixed-citation publication-type="other" xlink:type="simple">Adewuyi, O.B., Kipngetich, K., Afolayan, A.F., Amara, T., Alawode, O.I. and Senjyu, T. (2020) Challenges and Prospects of Nigeria’s Sustainable Energy Transition with Lessons from Other Countries’ Experience. Energy Reports, 6, 993-1009. https://doi.org/10.1016/j.egyr.2020.04.022</mixed-citation></ref><ref id="scirp.128183-ref21"><label>21</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Akin</surname><given-names> A.O. </given-names></name>,<etal>et al</etal>. (<year>2016</year>)<article-title>False Adaptive Resilience: The Environmental Brutality of Electric Power Generator Uses in Ogbomoso, Nigeria</article-title><source> World Environment</source><volume> 6</volume>,<fpage> 71</fpage>-<lpage>78</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.128183-ref22"><label>22</label><mixed-citation publication-type="other" xlink:type="simple">Oguntoke, O. and Adeyemi, A. (2017) Degradation of the Urban Environment and Human Health by Emissions from Fossil-Fuel Combusting Electricity Generators in Abeokuta Metropolis, Nigeria. Indoor and Built Environment, 26, 538-550. https://doi.org/10.1177/1420326X16629818</mixed-citation></ref><ref id="scirp.128183-ref23"><label>23</label><mixed-citation publication-type="other" xlink:type="simple">World Bank (2014) Diesel Power Generation: Inventories and Black Carbon Emissions in Nigeria. http://hdl.handle.net/10986/28419</mixed-citation></ref><ref id="scirp.128183-ref24"><label>24</label><mixed-citation publication-type="other" xlink:type="simple">Solar Energy Society of Nigeria (SESN) (2020). https://sesn-ng.pagaloo.com/d/org</mixed-citation></ref><ref id="scirp.128183-ref25"><label>25</label><mixed-citation publication-type="other" xlink:type="simple">The Federal Government (FG) and Enabling PV Nigeria (2018) German Solar Association—BSW-Solar.</mixed-citation></ref><ref id="scirp.128183-ref26"><label>26</label><mixed-citation publication-type="other" xlink:type="simple">Osunmuyiwa, O. and Kalfagianni, A. (2017) Transitions in Unlikely Places: Exploring the Conditions for Renewable Energy Adoption in Nigeria. Environmental Innovation and Societal Transitions, 22, 26-40. https://doi.org/10.1016/j.eist.2016.07.002</mixed-citation></ref><ref id="scirp.128183-ref27"><label>27</label><mixed-citation publication-type="other" xlink:type="simple">Emodi, N.M. and Boo, K.J. (2015) Sustainable Energy Development in Nigeria: Current Status and Policy Options. Renewable and Sustainable Energy Review, 51, 356-381. https://doi.org/10.1016/j.rser.2015.06.016</mixed-citation></ref><ref id="scirp.128183-ref28"><label>28</label><mixed-citation publication-type="other" xlink:type="simple">The Inter-Ministerial Committee on Renewable Energy and Energy Efficiency (ICREEE) (2016) NREAP: National Renewable Energy Action Plan.</mixed-citation></ref><ref id="scirp.128183-ref29"><label>29</label><mixed-citation publication-type="other" xlink:type="simple">Energy Commission of Nigeria (2019) Integration of Solar Photovoltaic into the Grid. Abuja.</mixed-citation></ref><ref id="scirp.128183-ref30"><label>30</label><mixed-citation publication-type="other" xlink:type="simple">Kohler, J., Geels, F., Kern, F., Markard, J., Wieczorek, A., Alkemade, F., Avelino, F., Bergek, A., Boons, F., Fünfschilling, L., Hess, D., Holtz, G., Hyysalo, S., Jenkins, K., Kivimaa, P., Martiskainen, M., McMeekin, A., Mühlemeier, M.S., Nykvist, B., Onsongo, E., Pel, B., Raven, R., Rohracher, H., Sandén, B., Schot, J., Sovacool, B., Turnheim, B., Welch, D. and Well, P. (2019) An Agenda for Sustainability Transitions Research: State of the Art and Future Directions. Environmental Innovation and Societal Transitions, 31, 1-32. https://doi.org/10.1016/j.eist.2019.01.004</mixed-citation></ref><ref id="scirp.128183-ref31"><label>31</label><mixed-citation publication-type="journal" xlink:type="simple"><name name-style="western"><surname>Ojo</surname><given-names> O.V. </given-names></name>,<etal>et al</etal>. (<year>2017</year>)<article-title>An Overview of the Legal and Regulatory Framework for Renewable Energy Projects in Nigeria: Challenges and Prospects</article-title><source> Unilag Law Review I</source><volume> 1</volume>,<fpage> 22</fpage>-<lpage>47</lpage>.<pub-id pub-id-type="doi"></pub-id></mixed-citation></ref><ref id="scirp.128183-ref32"><label>32</label><mixed-citation publication-type="other" xlink:type="simple">Shaaban, M. and Petinrin, J.O. (2014) Renewable Energy Potentials in Nigeria: Meeting Rural Energy Needs. Renewable and Sustainable Energy Reviews, 29, 72-84. https://doi.org/10.1016/j.rser.2013.08.078</mixed-citation></ref><ref id="scirp.128183-ref33"><label>33</label><mixed-citation publication-type="other" xlink:type="simple">Byrnes, L., Brown, C., Foster, J. and Wagner, D.L. (2013) Australian Renewable Energy Policy: Barriers and Challenges. Renewable Energy, 60, 711-721. https://doi.org/10.1016/j.renene.2013.06.024</mixed-citation></ref><ref id="scirp.128183-ref34"><label>34</label><mixed-citation publication-type="other" xlink:type="simple">Energy Commission of Nigeria and Federal Ministry of Science and Technology (2018) National Energy Policy. Abuja.</mixed-citation></ref></ref-list></back></article>