<?xml version="1.0" encoding="UTF-8"?><!DOCTYPE article  PUBLIC "-//NLM//DTD Journal Publishing DTD v3.0 20080202//EN" "http://dtd.nlm.nih.gov/publishing/3.0/journalpublishing3.dtd"><article xmlns:mml="http://www.w3.org/1998/Math/MathML" xmlns:xlink="http://www.w3.org/1999/xlink" dtd-version="3.0" xml:lang="en" article-type="research article"><front><journal-meta><journal-id journal-id-type="publisher-id">OALibJ</journal-id><journal-title-group><journal-title>Open Access Library Journal</journal-title></journal-title-group><issn pub-type="epub">2333-9705</issn><publisher><publisher-name>Scientific Research Publishing</publisher-name></publisher></journal-meta><article-meta><article-id pub-id-type="doi">10.4236/oalib.1109711</article-id><article-id pub-id-type="publisher-id">OALibJ-126680</article-id><article-categories><subj-group subj-group-type="heading"><subject>Articles</subject></subj-group><subj-group subj-group-type="Discipline-v2"><subject>Biomedical&amp;Life Sciences</subject><subject> Business&amp;Economics</subject><subject> Chemistry&amp;Materials Science</subject><subject> Computer Science&amp;Communications</subject><subject> Earth&amp;Environmental Sciences</subject><subject> Engineering</subject><subject> Medicine&amp;Healthcare</subject><subject> Physics&amp;Mathematics</subject><subject> Social Sciences&amp;Humanities</subject></subj-group></article-categories><title-group><article-title>
 
 
  An Uncertain Multiple Attribute Decision Making Model for Choosing Project Delivery Methods of Power Transmission Project
 
</article-title></title-group><contrib-group><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Tianrui</surname><given-names>Fang</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Shili</surname><given-names>Liu</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Min</surname><given-names>Yin</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Si</surname><given-names>Shen</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib><contrib contrib-type="author" xlink:type="simple"><name name-style="western"><surname>Lei</surname><given-names>Shen</given-names></name><xref ref-type="aff" rid="aff1"><sup>1</sup></xref></contrib></contrib-group><aff id="aff1"><addr-line>Economic and Technological Research Institute of State Grid Anhui Electric Power Co., Ltd., Hefei, China</addr-line></aff><pub-date pub-type="epub"><day>06</day><month>07</month><year>2023</year></pub-date><volume>10</volume><issue>07</issue><fpage>1</fpage><lpage>15</lpage><history><date date-type="received"><day>5,</day>	<month>February</month>	<year>2023</year></date><date date-type="rev-recd"><day>25,</day>	<month>July</month>	<year>2023</year>	</date><date date-type="accepted"><day>28,</day>	<month>July</month>	<year>2023</year></date></history><permissions><copyright-statement>&#169; Copyright  2014 by authors and Scientific Research Publishing Inc. </copyright-statement><copyright-year>2014</copyright-year><license><license-p>This work is licensed under the Creative Commons Attribution International License (CC BY). http://creativecommons.org/licenses/by/4.0/</license-p></license></permissions><abstract><p>
 
 
  The investments of power transmission projects are steadily increasing in recent 20 years. However, it is rare to investigate the suitability of the project delivery methods for power transmission projects. In fact, it is not an easy task to select an appropriate project delivery method as a large amount of ambiguous and uncertain information exists. This paper thus aims to develop an uncertain multiple attribute decision making (MCDM) model to help owners of power transmission projects to choose a suitable project delivery method. Based on review of previous studies, several decision-making attributes were identified including capacity of owners, preference of owners, capacity of contractors, project characteristics and market factors. Decision-making rules were determined by using uncertain decision making operators. The weighting of different attributes was examined by analytic hierarchy process (AHP). The evaluation values of different alternatives were calculated by the uncertain MCDM model. The real case study was conducted to verify the feasibility of the proposed model. The practical application of the proposed uncertain MCDM model is expected to benefit the owner’s decision making in the selection of the project delivery methods of power transmission projects.
 
</p></abstract><kwd-group><kwd>Project Delivery Methods</kwd><kwd> Power Transmission Projects</kwd><kwd> Uncertain Multiple Attribute Decision Making</kwd></kwd-group></article-meta></front><body><sec id="s1"><title>1. Introduction</title><p>With the rapid urbanization development in China, the construction and transmission capacity of power grid have been greatly improved. In past 20 years, over 20 ultra-high vacuum power transmission projects have been completed in China (State Grid 2022) [<xref ref-type="bibr" rid="scirp.126680-ref1">1</xref>] . Investment in 2020 was over 473.4 billion (State Grid 2022) [<xref ref-type="bibr" rid="scirp.126680-ref1">1</xref>] . Most of power transmission projects were delivered by traditional design-bid-build (DBB) method. However, it becomes difficult for project owners to manage contractors from different power transmission projects. Problems gradually exit, for example, unprofessional construction management, weak initiative of project participants and waste of construction materials. In recent years, Engineering Procurement Construction (EPC) contract has been adopted in several pilot power transmission projects.</p><p>The power system reform was promoted until 2015. The target of power system reform sets to establish a uniform power market in the whole country. In Fourteenth Five Year Plan, the Chinese government clearly put forward to promote market-oriented reform of competitive links in energy, railway, telecommunications, public utilities and other industries (State Council, 2021) [<xref ref-type="bibr" rid="scirp.126680-ref2">2</xref>] . In 2020, the National Development and Reform Commission has proposed to complete the three year action plan of mixed-ownership reform and steadily push forward the reform on power grid and railways (National Development and Reform Commission, 2020) [<xref ref-type="bibr" rid="scirp.126680-ref3">3</xref>] . Therefore, different project delivery methods will be applied to power transmission projects, which induce competitiveness and huge changes on current project contracting methods.</p><p>In fact, there are different project delivery methods that have been applied to power transmissions projects, including DBB, Design-build (DB) and EPC. However, it is still uncertain about how to select the appropriate project delivery method for different kinds of power transmission projects. The investigation on indicators of project delivery selection for specific power transmission projects has been limited. Hence, this paper aims at investigating the uncertain multiple attribute decision making (MADM) method for project delivery selection of power transmission projects. It will provide empirical suggestions on contract methods and project delivery methods for power transmission projects under the power market-oriented reform in China.</p></sec><sec id="s2"><title>2. Project Delivery Selection</title><p>Project delivery is defined as a process by which designers, constructors, and various consultants provide professional services for completing project to the owner (Molenaar et al. 2010) [<xref ref-type="bibr" rid="scirp.126680-ref4">4</xref>] . Project delivery facilitates the organization of project participants to interact for transforming the owner’s objectives into finished buildings (ASCE, 2000) [<xref ref-type="bibr" rid="scirp.126680-ref5">5</xref>] . It is one of critical factors of project success which significantly influences the delivery of project schedule, cost, quality and contract management (Al Khalil, 2002 [<xref ref-type="bibr" rid="scirp.126680-ref6">6</xref>] ; Kumaraswamy &amp; Dissanayaka, 2001 [<xref ref-type="bibr" rid="scirp.126680-ref7">7</xref>] ). Therefore, it has been attracted attentions from previous researchers on selecting an appropriate project delivery method for specific project types (Hong et al., 2008 [<xref ref-type="bibr" rid="scirp.126680-ref8">8</xref>] ; Ojiako et al., 2008 [<xref ref-type="bibr" rid="scirp.126680-ref9">9</xref>] ; Oyetunji &amp; Anderson, 2006 [<xref ref-type="bibr" rid="scirp.126680-ref10">10</xref>] ).</p><p>In order to meet different objectives of power transmission projects, a variety of delivery systems have been adopted including traditional DBB, DB and EPC (Chen et al., 2005) [<xref ref-type="bibr" rid="scirp.126680-ref11">11</xref>] . Different delivery systems define the sequence of events, contractual obligations, participant relationships, and specific mechanisms for overseeing project performance (Dorsey 1997) [<xref ref-type="bibr" rid="scirp.126680-ref12">12</xref>] . DBB is the most used method for power transmission projects. Under DBB, the power project owners are required to separate project design and construction contracts to different qualified companies. The design bids are early than construction bids. Normally, the contractors with the lowest bidding prices build such projects. Due to the separation of design works and construction projects, DBB has several shortcomings that result in frequent claims and disputes between the project participants and cost and time overruns.</p><p>Both DB and EPC are classified as integrated project delivery methods which integrate project design and construction. In power sector, EPC has been increasingly applied into electrical power station projects and photovoltaic power projects (Zhao et al., 2020) [<xref ref-type="bibr" rid="scirp.126680-ref13">13</xref>] . But the applications of DB and EPC in power transmission projects are still limited. Power transmission projects involve enormous investment, in which over 60% of investments are spent on electricity equipment. In consideration of high standards on electricity equipment, the procurement of equipment is directly organized by the project owner. Hence, the applications of EPC on power transmission projects are rare. In recent years, there are several pilot power transmission projects which are attempted to adopt DB and EPC as project delivery methods for improving efficiency of project investment and management (Wu et al., 2006) [<xref ref-type="bibr" rid="scirp.126680-ref14">14</xref>] .</p><p>The selection of project delivery methods is influenced by several factors, which have been investigated by previous studies (Chen et al., 2016 [<xref ref-type="bibr" rid="scirp.126680-ref15">15</xref>] [<xref ref-type="bibr" rid="scirp.126680-ref16">16</xref>] ; Qiang et al., 2015 [<xref ref-type="bibr" rid="scirp.126680-ref17">17</xref>] ). Owner’s abilities including technical ability, financing ability, project management ability and project experiences are identified as prominent factors affecting project delivery selection (Chan et al., 2004) [<xref ref-type="bibr" rid="scirp.126680-ref18">18</xref>] . Generally, more experienced clients are more skilled in construction technology and prefer more control in projects (Yang et al., 2010) [<xref ref-type="bibr" rid="scirp.126680-ref19">19</xref>] . They will prefer to apply traditional DBB method. In China, owners would evaluate their technical ability and past experience, and then make trade-off of authority with consultants and contractors (Lu et al., 2015) [<xref ref-type="bibr" rid="scirp.126680-ref20">20</xref>] .</p><p>Due to the long history of the planned economy environment, many Chinese owners’ preferences influence the selection of project delivery methods. As contractors share abundant risks under EPC method, the bid prices of EPC are often higher than DBB. If project prices are regarded as important for the owners, the owners might not choose DB nor EPC methods (Chen et al., 2016) [<xref ref-type="bibr" rid="scirp.126680-ref15">15</xref>] [<xref ref-type="bibr" rid="scirp.126680-ref16">16</xref>] . Normally, project outcome performance such as schedule, cost and quality performances are considered universally as basic factors for project delivery selection (Chen et al., 2009) [<xref ref-type="bibr" rid="scirp.126680-ref21">21</xref>] . In China, project delivery methods should be tailored for accommodation of owners’ business culture, including risk allocation and management modes (Qiang et al., 2015) [<xref ref-type="bibr" rid="scirp.126680-ref17">17</xref>] .</p><p>Project characteristics including project complexity, project size and project investment scales are the primary concern of owners when selecting project delivery methods (Azhar et al., 2014) [<xref ref-type="bibr" rid="scirp.126680-ref22">22</xref>] . Project complexity is composed of technical complexity and organizational complexity, and the organizational complexity should be tailored to the technical complexity (Baccarini, 1996) [<xref ref-type="bibr" rid="scirp.126680-ref23">23</xref>] . Project size and investment scales are other dimension reflecting how challenging the project is. Project size together with project investment scales may contribute to project risks and affect the risk allocation among participants (Chen et al., 2011) [<xref ref-type="bibr" rid="scirp.126680-ref24">24</xref>] .</p><p>Market factors are also critical for project delivery selection. As construction laws and regulations on construction projects in China are still rigorous, it should be considered firstly before making decisions on project delivery methods (Qiang et al., 2015) [<xref ref-type="bibr" rid="scirp.126680-ref17">17</xref>] . Over the years, China’s construction industry has been soaring with more and more mega projects delivered by Chinese companies. No. of suitable contractors in the market and contractors’ credibility should be put more emphasis. Clients should confirm that there are sufficient competent and credible contractors in the market before proceeding with a certain project delivery method (Chen et al., 2004) [<xref ref-type="bibr" rid="scirp.126680-ref18">18</xref>] .</p></sec><sec id="s3"><title>3. Uncertain Multiple Attribute Decision Making Model</title><sec id="s3_1"><title>3.1. Indicators of the Project Delivery Selection</title><p>Based on literature review, 19 decision-making attributes for project delivery were determined. In order to ensure the feasibility of decision-making attributes, eight professionals with over 10 years working experiences on power transmission projects were invited to review the initial attributes. Professional experts were interviewed to revise the decision-making attributes in consideration of characteristics of power transmission projects. Terrain condition and length of transmission projects were included in the attributes. One attributed named as preference on market shares was deleted due to the monopolistic characteristics of power transmission projects. There were totally 20 attributes which were classified into four categories, i.e., capacity of owners, preference of owners, capacity of contractors, project characteristics and market factors (<xref ref-type="table" rid="table1">Table 1</xref>).</p><p>In order to use decision making attributes listed in <xref ref-type="table" rid="table1">Table 1</xref> for select appropriate project delivery methods, the decision making rules were further defined in consideration of construction laws and regulation and contracts of different project delivery methods (<xref ref-type="table" rid="table2">Table 2</xref>). These decision making rules of different attributes were adopted in the uncertain multiple attribute decision making (MADM) model for project delivery selection of power transmission projects.</p></sec><sec id="s3_2"><title>3.2. Project Delivery Selection Model</title><p>In order to choose appropriate project delivery methods of power transmission</p><table-wrap id="table1" ><label><xref ref-type="table" rid="table1">Table 1</xref></label><caption><title> Decision-making attributes for project delivery methods of power transmission projects</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Categories</th><th align="center" valign="middle" >Items</th><th align="center" valign="middle" >Decision-Making Attributes</th></tr></thead><tr><td align="center" valign="middle" >C1: Capacity of owners</td><td align="center" valign="middle" >A1</td><td align="center" valign="middle" >Project management capacity of owners</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A2</td><td align="center" valign="middle" >Similar project experiences of owners</td></tr><tr><td align="center" valign="middle" >C2: Preference of owners</td><td align="center" valign="middle" >A3</td><td align="center" valign="middle" >Preference on project prices</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A4</td><td align="center" valign="middle" >Preference on project progress</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A5</td><td align="center" valign="middle" >Preference on project quality</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A6</td><td align="center" valign="middle" >Preference on involvement in project design</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A7</td><td align="center" valign="middle" >Preference on involvement in procurement of materials and equipment</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A8</td><td align="center" valign="middle" >Preference on risk allocation among project participants</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A9</td><td align="center" valign="middle" >Attitude on project changes</td></tr><tr><td align="center" valign="middle" >C3: Capacity of contractors</td><td align="center" valign="middle" >A10</td><td align="center" valign="middle" >Construction management capacity of contractors</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A11</td><td align="center" valign="middle" >Project implementation ability of contractors</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A12</td><td align="center" valign="middle" >Similar project experiences of contractors</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A13</td><td align="center" valign="middle" >Reputation of contractors</td></tr><tr><td align="center" valign="middle" >C4: Project Characteristics</td><td align="center" valign="middle" >A14</td><td align="center" valign="middle" >Project investment scales</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A15</td><td align="center" valign="middle" >Project complexity</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A16</td><td align="center" valign="middle" >Terrain condition</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A17</td><td align="center" valign="middle" >Length of transmission projects</td></tr><tr><td align="center" valign="middle" >C5: Market factors</td><td align="center" valign="middle" >A18</td><td align="center" valign="middle" >Similar project in the markets</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A19</td><td align="center" valign="middle" >No. of suitable contractors in the market</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" >A20</td><td align="center" valign="middle" >Mandatory requirements of project delivery by construction laws and regulations</td></tr></tbody></table></table-wrap><table-wrap id="table2" ><label><xref ref-type="table" rid="table2">Table 2</xref></label><caption><title> Decision-making rules for each attribute for project delivery methods of power transmission projects</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Items</th><th align="center" valign="middle" >Decision-Making Attributes</th><th align="center" valign="middle" >Decision-Making Rules</th></tr></thead><tr><td align="center" valign="middle"  colspan="2"  >C1: Capacity of owners</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A1</td><td align="center" valign="middle" >Project management capacity of owners</td><td align="center" valign="middle" >The evaluation value of technical and management capacities of owners</td></tr><tr><td align="center" valign="middle" >A2</td><td align="center" valign="middle" >Similar project experiences of owners</td><td align="center" valign="middle" >No. of previous projects experienced by the owners</td></tr><tr><td align="center" valign="middle"  colspan="2"  >C2: Preference of owners</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A3</td><td align="center" valign="middle" >Preference on project prices</td><td align="center" valign="middle" >= Acturalcontractprice − normalprojectprice Normalprojectprice</td></tr><tr><td align="center" valign="middle" >A4</td><td align="center" valign="middle" >Preference on project quality</td><td align="center" valign="middle" >= Materialquality + Workmanshipquality + Designquality 3</td></tr><tr><td align="center" valign="middle" >A5</td><td align="center" valign="middle" >Preference on project progress</td><td align="center" valign="middle" >= Acturalduration − normalanticipatedduration Normalanticipatedduration</td></tr><tr><td align="center" valign="middle" >A6</td><td align="center" valign="middle" >Preference on involvement in project design</td><td align="center" valign="middle" >Working time of owners’ involvement in project design</td></tr><tr><td align="center" valign="middle" >A7</td><td align="center" valign="middle" >Preference on involvement in procurement of materials and equipment</td><td align="center" valign="middle" >No. of suppliers chosen by owners; Amounts of materials and equipment purchased by owners</td></tr><tr><td align="center" valign="middle" >A8</td><td align="center" valign="middle" >Preference on risk allocation among project participants</td><td align="center" valign="middle" >Risk preference of owners and contractors</td></tr><tr><td align="center" valign="middle" >A9</td><td align="center" valign="middle" >Attitude on project changes</td><td align="center" valign="middle" >No. of project changes</td></tr><tr><td align="center" valign="middle"  colspan="2"  >C3: Capacity of contractors</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A10</td><td align="center" valign="middle" >Construction management capacity of contractors</td><td align="center" valign="middle" >The evaluation value of technical and management capacities of contractors</td></tr><tr><td align="center" valign="middle" >A11</td><td align="center" valign="middle" >Project implementation ability of contractors</td><td align="center" valign="middle" >No. of projects completed by the contractors</td></tr><tr><td align="center" valign="middle" >A12</td><td align="center" valign="middle" >Similar project experiences of contractors</td><td align="center" valign="middle" >No. of previous projects experienced by the contractors</td></tr><tr><td align="center" valign="middle" >A13</td><td align="center" valign="middle" >Reputation of contractors</td><td align="center" valign="middle" >No. of awards of the contractors</td></tr><tr><td align="center" valign="middle"  colspan="2"  >C4: Project Characteristics</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A14</td><td align="center" valign="middle" >Project investment scales</td><td align="center" valign="middle" >Project investment amounts</td></tr><tr><td align="center" valign="middle" >A15</td><td align="center" valign="middle" >Project complexity</td><td align="center" valign="middle" >The evaluation value of project complexity</td></tr><tr><td align="center" valign="middle" >A16</td><td align="center" valign="middle" >Terrain condition</td><td align="center" valign="middle" >Terrain condition of transmission projects</td></tr><tr><td align="center" valign="middle" >A17</td><td align="center" valign="middle" >Length of transmission projects</td><td align="center" valign="middle" >Length of transmission projects</td></tr><tr><td align="center" valign="middle"  colspan="2"  >C5: Market factors</td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A18</td><td align="center" valign="middle" >Similar project in the markets</td><td align="center" valign="middle" >No. of similar projects</td></tr><tr><td align="center" valign="middle" >A19</td><td align="center" valign="middle" >No. of suitable contractors in the market</td><td align="center" valign="middle" >No. of suitable contractors in the market</td></tr><tr><td align="center" valign="middle" >A20</td><td align="center" valign="middle" >Mandatory requirements of project delivery by construction laws and regulations</td><td align="center" valign="middle" >No. of mandatory requirements of project delivery</td></tr></tbody></table></table-wrap><p>projects, an uncertain MADM was developed as shown in <xref ref-type="fig" rid="fig1">Figure 1</xref>. By adopting an uncertain MADM model, the proposed model is composed of several steps: Setting decision objective, Determining decision-making attributes, Developing decision-making rules, Calculating weightings, Calculating group evaluation value of each alternative, Determining ranking of each alternative, and Selecting appropriate project delivery method. The framework of the uncertain MADM model can be shown in <xref ref-type="fig" rid="fig1">Figure 1</xref>.</p><p>The uncertain MADM Model can be calculated with following steps:</p><p>1) Weighting of decision-making attributes were determined by professional experts. The weighting of different attributes was represented as ω = ( ω 1 , ω 2 , ⋯ , ω n ) , with ω j ∈ [ 0 , 1 ] , ( j = 1 , 2 , ⋯ , 20 ), ∑ j = 1 n ω j = 1 .</p><p>2) Three project delivery methods, which were DBB, DB and EPC, were commonly used in power transmission projects. Hence, it was assumed that three alternatives would be chose, which were expressed as x i ∈ X ( i = 1 , 2 , 3 ) .</p><p>3) Decision maker D k should determine uncertain language assessment value r ˜ i j ( k ) of each attribute A i . The assessment matrix was then calculated as R ˜ k = ( r ˜ i j ( k ) ) 3 &#215; 21 , r ˜ i j ( k ) ∈ S ˜ .</p><p>4) Uncertain extended weighted arithmetic average (UEWAA) operator was used to estimate the evaluation value of multiple attributes for each alternative x i . The evaluation value of multiple attributes for each alternative x i was represented as z ˜ i ( k ) ( ω ) ( i = 1 , 2 , 3 ; k = 1 , 2 , ⋯ , t ) .</p><p>The UEWAA operator was calculated with following equation.</p><p>UEWAA ω ( μ ˜ 1 , μ ˜ 2 , ⋯ , μ ˜ n ) = ω 1 μ ˜ 1 ⊕ ω 1 μ ˜ 1 ⊕ ⋯ ⊕ ω n μ ˜ n</p><p>where ω = ( ω 1 , ω 2 , ⋯ , ω n ) was weight vector of uncertain language variables ( μ ˜ 1 , μ ˜ 2 , ⋯ , μ ˜ n ) .</p><p>5) Uncertain linguistic hybrid aggregation (ULHA) operator was further used to estimate the group evaluation value of multiple attributes for each alternative. It was calculated as:</p><p>z ˜ i ( λ , w ′ ) = ULHA λ , w ′ ( r ˜ i ( 1 ) , r ˜ i ( 2 ) , ⋯ , r ˜ i ( n ) ) = ω ′ 1 ν ˜ i ( 1 ) ⊕ ω ′ 2 ν ˜ i ( 2 ) ⊕ ⋯ ⊕ ω ′ t ν ˜ i ( t ) , i = 1 , 2 , 3</p><p>where w ′ = ( w ′ 1 , w ′ 2 , ⋯ , w ′ n ) was weight vector of ULHA operator w ′ k ∈ [ 0 , 1 ] ( k = 1 , 2 , ⋯ , t ) .</p><p>6) Both UEWAA operator and ULHA operator were applied to determine the ranking of different alternatives by using following equation.</p><p>v P { ULHA λ , w ( i ) [ UEWAA ω ( k , i ) ( r ˜ i j ( k ) ) ] }</p><p>where r ˜ i j ( k ) was the uncertain language assessment value of x i ∈ X ( i = 1 , 2 , 3 ) ;</p><p>UEWAA ω ( k , i ) was the aggregated value of uncertain language assessment value of different alternatives;</p><p>ULHA λ , w ( i ) was the group evaluation value of multiple attributes for each alternative;</p><p>v<sub>p</sub> was the ranking of group evaluation value of each alternative.</p><p>(6) Value of each alternatives ( p i j = p ( z ˜ i ( λ , w ′ ) ≥ z ˜ j ( λ , w ′ ) ) ( i , j = 1 , 2 , 3 ) ) was determined by following rules. The possibility matrix was also established as P = ( P i j ) 3 &#215; 3 .</p><p>Rule 1: p ( a ˜ ≥ b ˜ ) = min { l a ˜ + l b ˜ , max ( a U − b U , 0 ) } l a ˜ + l b ˜</p><p>Rule 2: p ( a ˜ ≥ b ˜ ) = min { max ( a U − b U l a ˜ + l b ˜ , 0 ) , 1 }</p><p>7) Based on possibility matrix P, the ranking of each alternative was obtained by using the equation of v i = 1 n ( n − 1 ) ( ∑ j = 1 n p i j + n 2 − 1 ) , i = N . With the ranking of each alternative ( v = ( v 1 , v 2 , v 3 ) ), decision makers can choose the optimum alternative for project delivery methods of power transmission projects.</p></sec></sec><sec id="s4"><title>4. Case Study</title><p>The case project is a 220 kV transmission line which is build based on general design of State Grid. The length of transmission project is 178.1 kilometers. The project estimates are over RMB 70,739 million. The planned project duration is 24 months. The transmission project is designed to cross railway project. The highest power tower is over 300 meter, which significantly increases construction difficulty. 15 experts with previous transmission project experiences were invited to evaluate the weighting of 20 decision-making attributes listed in <xref ref-type="table" rid="table1">Table 1</xref>. The analytic hierarchy process (AHP) was applied to calculate the weighting of different attributes. The AHP method, which was developed by Saaty (1990) [<xref ref-type="bibr" rid="scirp.126680-ref25">25</xref>] , is a multi-criteria decision making method and helps to obtain the best decision among several vital alternatives considering the various attributes (Naziris et al., 2016 [<xref ref-type="bibr" rid="scirp.126680-ref26">26</xref>] ; Higgins and Benaroya, 2020 [<xref ref-type="bibr" rid="scirp.126680-ref27">27</xref>] ; Wang et al., 2022 [<xref ref-type="bibr" rid="scirp.126680-ref28">28</xref>] ). The key steps of the method are as follows:</p><p>Step 1: Building the AHP model. The goals, factors and objects of decision are divided into the highest level, middle level and lowest level according to their mutual relations.</p><p>Step 2: Building pairwise comparison matrix. According to Saaty (1990) [<xref ref-type="bibr" rid="scirp.126680-ref25">25</xref>] , factors should compare two factors or items with each other to improve accuracy. The matrix equation is</p><p>A = ( a i j ) n &#215; n = [ a 11 a 12 a 21 a 22 ⋯ a 1 n ⋯ a 2 n ⋮ ⋮ a n 1 a n 2 ⋱ ⋮ ⋯ a n n ]</p><p>where a<sub>ij</sub> is the importance of criterion i compared with criterion j. a<sub>ij</sub> &gt; 0, a<sub>ij</sub> &#215; a<sub>ji</sub> = 1 and the nine importance intensities given by Saaty and their assignments are listed in <xref ref-type="table" rid="table3">Table 3</xref>.</p><p>Step 3: Examining for consistency. The consistency index (CI) defined as CI = (λ<sub>max</sub> − n)/(n − 1), where λ<sub>max</sub> and n are the maximum eigenvalue and the size of the matrix, respectively. The consistency fraction (CR) is calculated as CR = CI/RI. The random index values (RI) is shown in <xref ref-type="table" rid="table4">Table 4</xref>. The acceptable upper bound of CR is 0.10. If the consistency ratio is above 0.10, then the decision maker needs to revise decisions.</p><p>Step 4: Calculating the normalized matrix of each attribute.</p><p>Step 5: Hierarchical single sorting and hierarchical global sorting. Hierarchical single sorting is the ranking of the importance weights of attributes related to the attribute in the previous level. The ranking of the relative importance weights of all attributes in a certain level to the top level is called hierarchical global sorting, which is conducted from the highest level to the lowest level in turn. The results were illustrated in <xref ref-type="table" rid="table5">Table 5</xref>.</p><p>In order to select project delivery methods for the case project, three professional experts were invited to evaluate three project delivery methods (i.e., DBB, DB and EPC) based on decision-making rules of each attribute. The evaluation results were adopted to establish decision-making judgement matrix (<xref ref-type="table" rid="table6">Table 6</xref>).</p><p>Based on the weighting and decision-making matrix listed in <xref ref-type="table" rid="table5">Table 5</xref> and <xref ref-type="table" rid="table6">Table 6</xref>, the UEWAA operator ( UEWAA ω ( μ ˜ 1 , μ ˜ 2 , ⋯ , μ ˜ n ) = ω 1 μ ˜ 1 ⊕ ω 1 μ ˜ 1 ⊕ ⋯ ⊕ ω n μ ˜ n ) was calculated in order to estimate the evaluation value of multiple attributes for each project delivery method. The evaluated value for DBB which was assessed by Expert 1 was estimated as following equation, where ω i is calculated in <xref ref-type="table" rid="table5">Table 5</xref> and μ ˜ i refers to the opinions of Expert 1 shown in <xref ref-type="table" rid="table6">Table 6</xref>. The evaluation value of different project delivery methods was illustrated in <xref ref-type="table" rid="table7">Table 7</xref>.</p><p>z ˜ 1 1 = 0.0959 &#215; [ S − 2 , S − 1 ] ⊕ 0.0320 &#215; [ S − 1 , S 0 ] ⊕ 0.0272 &#215; [ S − 1 , S 1 ] ⊕ 0.0405 &#215; [ S 2 , S 3 ]   ⊕ 0.0741 &#215; [ S − 3 , S − 1 ] ⊕ 0.0601 &#215; [ S 1 , S 2 ] ⊕ 0.0452 &#215; [ S − 2 , S − 1 ] ⊕ 0.0673 &#215; [ S 1 , S 2 ]   ⊕ 0.0580 &#215; [ S 0 , S 1 ] ⊕ 0.0355 &#215; [ S − 1 , S 0 ] ⊕ 0.0378 &#215; [ S 1 , S 2 ] ⊕ 0.0448 &#215; [ S − 1 , S − 1 ]   ⊕ 0.0397 &#215; [ S − 2 , S − 1 ] ⊕ 0.0514 &#215; [ S 1 , S 2 ] ⊕ 0.1081 &#215; [ S 2 , S 3 ] ⊕ 0.0411 &#215; [ S 2 , S 3 ]   ⊕ 0.0544 &#215; [ S − 2 , S − 1 ] ⊕ 0.0284 &#215; [ S 1 , S 2 ] ⊕ 0.0235 &#215; [ S 2 , S 3 ] = [ S 0.2819 , S 2.0139 ]</p><p>ULHA operator was further used to estimate the group evaluation value of multiple attributes for each alternative. Take DBB as an example, the group evaluation value was estimated as:</p><table-wrap id="table3" ><label><xref ref-type="table" rid="table3">Table 3</xref></label><caption><title> Saaty’s scale for pair-wise comparisons</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Importance intensity</th><th align="center" valign="middle" >Definition</th></tr></thead><tr><td align="center" valign="middle" >1</td><td align="center" valign="middle" >Equal importance</td></tr><tr><td align="center" valign="middle" >3</td><td align="center" valign="middle" >Moderate importance</td></tr><tr><td align="center" valign="middle" >5</td><td align="center" valign="middle" >Strong importance</td></tr><tr><td align="center" valign="middle" >7</td><td align="center" valign="middle" >Very strong importance</td></tr><tr><td align="center" valign="middle" >9</td><td align="center" valign="middle" >Absolute importance</td></tr><tr><td align="center" valign="middle" >2, 4, 6, 8</td><td align="center" valign="middle" >Intermediate values</td></tr></tbody></table></table-wrap><table-wrap id="table4" ><label><xref ref-type="table" rid="table4">Table 4</xref></label><caption><title> Random index value table</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >n</th><th align="center" valign="middle" >1, 2</th><th align="center" valign="middle" >3</th><th align="center" valign="middle" >4</th><th align="center" valign="middle" >5</th><th align="center" valign="middle" >6</th><th align="center" valign="middle" >7</th><th align="center" valign="middle" >8</th><th align="center" valign="middle" >9</th><th align="center" valign="middle" >10</th></tr></thead><tr><td align="center" valign="middle" >RI</td><td align="center" valign="middle" >0</td><td align="center" valign="middle" >0.58</td><td align="center" valign="middle" >0.90</td><td align="center" valign="middle" >1.12</td><td align="center" valign="middle" >1.24</td><td align="center" valign="middle" >1.32</td><td align="center" valign="middle" >1.41</td><td align="center" valign="middle" >1.45</td><td align="center" valign="middle" >1.49</td></tr></tbody></table></table-wrap><table-wrap id="table5" ><label><xref ref-type="table" rid="table5">Table 5</xref></label><caption><title> Weighing of Decision-making attributes and consistency test</title></caption><table><tbody><thead><tr><th align="center" valign="middle"  rowspan="2"  >Item</th><th align="center" valign="middle"  rowspan="2"  >ω i</th><th align="center" valign="middle"  colspan="5"  >Categories of decision-making attributes</th><th align="center" valign="middle"  rowspan="2"  >Weighting of decision-making attributes</th><th align="center" valign="middle"  rowspan="2"  >Consistency test</th><th align="center" valign="middle"  rowspan="2"  >Integrated consistency test</th></tr></thead><tr><td align="center" valign="middle" >C1</td><td align="center" valign="middle" >C2</td><td align="center" valign="middle" >C3</td><td align="center" valign="middle" >C4</td><td align="center" valign="middle" >C5</td></tr><tr><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1279</td><td align="center" valign="middle" >0.3724</td><td align="center" valign="middle" >0.1579</td><td align="center" valign="middle" >0.2358</td><td align="center" valign="middle" >0.1149</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td></tr><tr><td align="center" valign="middle" >A1</td><td align="center" valign="middle" >ω 1</td><td align="center" valign="middle" >0.7500</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0959</td><td align="center" valign="middle"  rowspan="2"  >λ<sub>max</sub> = 2 CI = 0</td><td align="center" valign="middle"  rowspan="20"  >λ<sub>max</sub> = 4.1179 CI = 0.0393 RI = 0.090 CR = 0.0437 &lt; 1</td></tr><tr><td align="center" valign="middle" >A2</td><td align="center" valign="middle" >ω 2</td><td align="center" valign="middle" >0.2500</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0320</td></tr><tr><td align="center" valign="middle" >A3</td><td align="center" valign="middle" >ω 3</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0731</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0272</td><td align="center" valign="middle"  rowspan="7"  >λ<sub>max</sub> = 9.6277 CI = 0.0785 RI = 1.45 CR = 0.0541 &lt; 1</td></tr><tr><td align="center" valign="middle" >A4</td><td align="center" valign="middle" >ω 4</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1088</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0405</td></tr><tr><td align="center" valign="middle" >A5</td><td align="center" valign="middle" >ω 5</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1989</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0741</td></tr><tr><td align="center" valign="middle" >A6</td><td align="center" valign="middle" >ω 6</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1613</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0601</td></tr><tr><td align="center" valign="middle" >A7</td><td align="center" valign="middle" >ω 7</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1215</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0452</td></tr><tr><td align="center" valign="middle" >A8</td><td align="center" valign="middle" >ω 8</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1807</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0673</td></tr><tr><td align="center" valign="middle" >A9</td><td align="center" valign="middle" >ω 9</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1557</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0580</td></tr><tr><td align="center" valign="middle" >A10</td><td align="center" valign="middle" >ω 10</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2250</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0355</td><td align="center" valign="middle"  rowspan="4"  >λ<sub>max</sub> = 8.1531 CI = 0.08339 RI = 1.23 CR = 0.0678 &lt; 1</td></tr><tr><td align="center" valign="middle" >A11</td><td align="center" valign="middle" >ω 11</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2396</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0378</td></tr><tr><td align="center" valign="middle" >A12</td><td align="center" valign="middle" >ω 12</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2838</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0448</td></tr><tr><td align="center" valign="middle" >A13</td><td align="center" valign="middle" >ω 13</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2516</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0397</td></tr><tr><td align="center" valign="middle" >A14</td><td align="center" valign="middle" >ω 14</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2178</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0514</td><td align="center" valign="middle"  rowspan="4"  >λ<sub>max</sub> = 7.5814 CI = 0.0685 RI = 1.81 CR = 0.0378 &lt; 1</td></tr><tr><td align="center" valign="middle" >A15</td><td align="center" valign="middle" >ω 15</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1497</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0353</td></tr><tr><td align="center" valign="middle" >A16</td><td align="center" valign="middle" >ω 16</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.4583</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1081</td></tr><tr><td align="center" valign="middle" >A17</td><td align="center" valign="middle" >ω 17</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.1742</td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.0411</td></tr><tr><td align="center" valign="middle" >A18</td><td align="center" valign="middle" >ω 18</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.4736</td><td align="center" valign="middle" >0.0544</td><td align="center" valign="middle"  rowspan="3"  >λ<sub>max</sub> = 4.2174 CI = 0.0725 RI = 0.90 CR = 0.0805 &lt; 1</td></tr><tr><td align="center" valign="middle" >A19</td><td align="center" valign="middle" >ω 19</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2473</td><td align="center" valign="middle" >0.0284</td></tr><tr><td align="center" valign="middle" >A20</td><td align="center" valign="middle" >ω 20</td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" ></td><td align="center" valign="middle" >0.2049</td><td align="center" valign="middle" >0.0235</td></tr></tbody></table></table-wrap><p>z ˜ 1 ( λ , ω ) = 0.067 &#215; [ S 0.2819 , S 2.0139 ] ⊕ 0.267 &#215; [ S − 0.3045 , S 1.2467 ]       ⊕ 0.666 &#215; [ S − 0.1055 , S 1.8221 ] = [ S − 0.1327 , S 1.6813 ]</p><p>Based on the equation of p i j = p ( z ˜ i ( λ , w ′ ) ≥ z ˜ j ( λ , w ′ ) ) ( i , j = 1 , 2 , 3 ) , the possibility matrix was developed.</p><table-wrap id="table6" ><label><xref ref-type="table" rid="table6">Table 6</xref></label><caption><title> Decision-making matrix for three project delivery methods</title></caption><table><tbody><thead><tr><th align="center" valign="middle"  rowspan="2"  >R ˜ i</th><th align="center" valign="middle"  colspan="3"  >Expert 1</th><th align="center" valign="middle"  colspan="3"  >Expert 2</th><th align="center" valign="middle"  colspan="3"  >Expert 3</th></tr></thead><tr><td align="center" valign="middle" >DBB</td><td align="center" valign="middle" >DB</td><td align="center" valign="middle" >EPC</td><td align="center" valign="middle" >DBB</td><td align="center" valign="middle" >DB</td><td align="center" valign="middle" >EPC</td><td align="center" valign="middle" >DBB</td><td align="center" valign="middle" >DB</td><td align="center" valign="middle" >EPC</td></tr><tr><td align="center" valign="middle" >A1</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S 0 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A2</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 1 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 0 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 2 ]</td></tr><tr><td align="center" valign="middle" >A3</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A4</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S − 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td></tr><tr><td align="center" valign="middle" >A5</td><td align="center" valign="middle" >[ S − 3 , S − 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A6</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td></tr><tr><td align="center" valign="middle" >A7</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 0 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 2 , S 0 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td></tr><tr><td align="center" valign="middle" >A8</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 0 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td></tr><tr><td align="center" valign="middle" >A9</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td></tr><tr><td align="center" valign="middle" >A10</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td></tr><tr><td align="center" valign="middle" >A11</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A12</td><td align="center" valign="middle" >[ S − 1 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S 0 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A13</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A14</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A15</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 2 , S 0 ]</td><td align="center" valign="middle" >[ S − 3 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td></tr><tr><td align="center" valign="middle" >A16</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S − 3 , S − 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td></tr><tr><td align="center" valign="middle" >A17</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 1 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S 3 , S − 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td></tr><tr><td align="center" valign="middle" >A18</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A19</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S − 1 , S 0 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td></tr><tr><td align="center" valign="middle" >A20</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 2 , S 3 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S 1 , S 3 ]</td><td align="center" valign="middle" >[ S 0 , S 1 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S 1 , S 2 ]</td><td align="center" valign="middle" >[ S − 2 , S − 1 ]</td><td align="center" valign="middle" >[ S − 3 , S − 2 ]</td></tr></tbody></table></table-wrap><table-wrap id="table7" ><label><xref ref-type="table" rid="table7">Table 7</xref></label><caption><title> Evaluated value of each project delivery method</title></caption><table><tbody><thead><tr><th align="center" valign="middle" >Alternatives Experts</th><th align="center" valign="middle" >Expert 1</th><th align="center" valign="middle" >Expert 2</th><th align="center" valign="middle" >Expert 3</th></tr></thead><tr><td align="center" valign="middle" >DBB</td><td align="center" valign="middle" >[ S 0.2819 , S 2.0139 ]</td><td align="center" valign="middle" >[ S − 0.3045 , S 1.2467 ]</td><td align="center" valign="middle" >[ S − 0.1055 , S 1.8221 ]</td></tr><tr><td align="center" valign="middle" >DB</td><td align="center" valign="middle" >[ S 1.5755 , S 4.0278 ]</td><td align="center" valign="middle" >[ S 0.4074 , S 2.6852 ]</td><td align="center" valign="middle" >[ S − 0.0978 , S 1.918 ]</td></tr><tr><td align="center" valign="middle" >EPC</td><td align="center" valign="middle" >[ S 0.9942 , S 3.5493 ]</td><td align="center" valign="middle" >[ S − 0.2006 , S 1.8221 ]</td><td align="center" valign="middle" >[ S − 0.1104 , S 1.5344 ]</td></tr></tbody></table></table-wrap><p>P = [ 0.5 0.3299 0.4811 0.6701 0.5 0.6534 0.5189 0.3466 0.5 ]</p><p>The ranking of each alternative was obtained as ν = ( 0.3018 , 0.3873 , 0.3109 ) . Then the ranking of different project delivery methods is DB &gt; EPC &gt; DBB (Liu et al., 2020) [<xref ref-type="bibr" rid="scirp.126680-ref29">29</xref>] . Therefore, DB is the appropriate project delivery method for the case transmission project.</p></sec><sec id="s5"><title>5. Discussion</title><p>In case project, three decision-making attributes (i.e., A1, A5 and A16) were evaluated as important for selecting project delivery methods for power transmission projects. Project management capacity of owners influences owners’ decisions on project delivery methods. Normally, the State Grid company is the owner of transmission projects in China. The State Grid has extensive experiences on similar projects and fosters high technical ability for managing transmission projects. They tend to control project and share little authority with consultants. Hence, traditional transmission projects were delivered by DBB method.</p><p>Owner’s preference on project progress achieved a relatively high weighting among all decision-making attributes. As DB method allows design-builders to have total control over design, scope, and budget, it is more likely that DB projects will be completed within schedule (Chen et al., 2016) [<xref ref-type="bibr" rid="scirp.126680-ref15">15</xref>] [<xref ref-type="bibr" rid="scirp.126680-ref16">16</xref>] . DBB methods are required to conduct design and building tender respectively, which induce long project periods. The case project has tight project schedule, which is more appropriate to use DB method.</p><p>Terrain condition was evaluated as the most important decision-making attribute for project delivery method of power transmission projects. Project investment, complexity and schedule of power transmission projects are heavily influenced by terrain condition. The terrain conditions of the case project involve almost mountainous regions with significant altitude difference, which increase the complexity of the project. DB method which combined design and construction was proved to appropriate for complex infrastructure projects (Chen et al., 2016) [<xref ref-type="bibr" rid="scirp.126680-ref15">15</xref>] [<xref ref-type="bibr" rid="scirp.126680-ref16">16</xref>] . Thus, DB was selected as better project delivery project for the case transmission project with complex terrain conditions.</p></sec><sec id="s6"><title>6. Conclusions</title><p>In order to select appropriate project delivery methods for power transmission projects, this paper aims at developing the uncertain MADM model. Based on literature review, several decision-making attributes were identified including capacity of owners, preference of owners, capacity of contractors, project characteristics and market factors. The uncertain MADM model is composed of several steps including Setting decision objective, Determining decision-making attributes, Developing decision-making rules, Calculating weightings, Calculating group evaluation value of each alternative, Determining ranking of each alternative, and Selecting appropriate project delivery method. The real case study was conducted to verify the feasibility of the proposed model.</p><p>The results indicated that capacity of owners, preference on project progress and terrain conditions were the major attributes influencing the decision on project delivery methods for power transmission projects. Based on the calculation of the uncertain MADM model, DB method was finally chosen as appropriate project delivery method for the case transmission project. The results were expected to be further applied in the case project and provide empirical evidence on the project delivery methods of power transmission projects.</p></sec><sec id="s7"><title>Conflicts of Interest</title><p>The authors declare no conflicts of interest.</p></sec><sec id="s8"><title>Cite this paper</title><p>Fang, T.R., Liu, S.L., Yin, M., Shen, S. and Shen, L. (2023) An Uncertain Multiple Attribute Decision Making Model for Choosing Project Delivery Methods of Power Transmission Project. Open Access Library Journal, 10: e9711. https://doi.org/10.4236/oalib.1109711</p></sec></body><back><ref-list><title>References</title><ref id="scirp.126680-ref1"><label>1</label><mixed-citation publication-type="other" xlink:type="simple">State Grid Corporation of China (2022) Power Grid of Investment.  
http://www.sgcc.com.cn/html/sgcc/col2022121208/column_2022121208_1.shtml</mixed-citation></ref><ref id="scirp.126680-ref2"><label>2</label><mixed-citation publication-type="other" xlink:type="simple">State Council (2021) Outline of the Fourteenth Five-Year Plan for National Economic and Social Development of the People’s Republic of China and the Vision for 2035. http://www.gov.cn/xinwen/2021-03/13/content_5592681.htm</mixed-citation></ref><ref id="scirp.126680-ref3"><label>3</label><mixed-citation publication-type="other" xlink:type="simple">National Development and Reform Commission (2020) Three-Year Action Plan for Reform of State-Owned Enterprises.  
http://gzw.panjin.gov.cn/2021_01/25_12/content-307105.html</mixed-citation></ref><ref id="scirp.126680-ref4"><label>4</label><mixed-citation publication-type="other" xlink:type="simple">Molenaar, K.R., Sobin, N. and Antillon, E.I. (2010) A Synthesis of Best Value Procurement Practices for Sustainable Design-Build Projects in the Public Sector. Journal of Green Building, 5, 148-157. https://doi.org/10.3992/jgb.5.4.148</mixed-citation></ref><ref id="scirp.126680-ref5"><label>5</label><mixed-citation publication-type="other" xlink:type="simple">American Society of Civil Engineers (2000) Quality in the Constructed Project: A Guide for Owners, Designers and Constructors. 2nd edition, American Society of Civil Engineers, Reston.</mixed-citation></ref><ref id="scirp.126680-ref6"><label>6</label><mixed-citation publication-type="other" xlink:type="simple">Al Khalil, M.I. (2002) Selecting the Appropriate Project Delivery Method Using AHP. International Journal of Project Management, 20, 469-474.  
https://doi.org/10.1016/S0263-7863(01)00032-1</mixed-citation></ref><ref id="scirp.126680-ref7"><label>7</label><mixed-citation publication-type="other" xlink:type="simple">Kumaraswamy, M.M. and Dissanayaka, S.M. (2001) Developing a Decision Support System for Building Project Procurement. Building and Environment, 36, 337-349.  
https://doi.org/10.1016/S0360-1323(00)00011-1</mixed-citation></ref><ref id="scirp.126680-ref8"><label>8</label><mixed-citation publication-type="other" xlink:type="simple">Hong, H.K., Kim, J.S., Kim, T. and Leem, B.H. (2008) The Effect of Knowledge on System Integration Project Performance. Industrial Management &amp; Data Systems, 108, 385-404. https://doi.org/10.1108/02635570810858787</mixed-citation></ref><ref id="scirp.126680-ref9"><label>9</label><mixed-citation publication-type="other" xlink:type="simple">Ojiako, U., Johansen, E. and Greenwood, D. (2008) A Qualitative Re-Construction of Project Measurement Criteria. Industrial Management &amp; Data Systems, 108, 405-417. https://doi.org/10.1108/02635570810858796</mixed-citation></ref><ref id="scirp.126680-ref10"><label>10</label><mixed-citation publication-type="other" xlink:type="simple">Oyetunji, A.A. and Anderson, S.D. (2006) Relative Effectiveness of Project Delivery and Contract Strategies. Journal of Construction Engineering and Management, 132, 3-13. https://doi.org/10.1061/(ASCE)0733-9364(2006)132:1(3)</mixed-citation></ref><ref id="scirp.126680-ref11"><label>11</label><mixed-citation publication-type="other" xlink:type="simple">Chen, Y.Q., Lu, W.X. and Zhang, S.B. (2005) Developing an Integrated Management System of Engineering Projects. China Civil Engineering Journal, 38, 111-115.</mixed-citation></ref><ref id="scirp.126680-ref12"><label>12</label><mixed-citation publication-type="other" xlink:type="simple">Dorsey, R. (1997) Project Delivery Systems for Building Construction. Associated General Contractors of America Publishing, Arlington.</mixed-citation></ref><ref id="scirp.126680-ref13"><label>13</label><mixed-citation publication-type="other" xlink:type="simple">Zhao, Z.Z., Meng, Q.C. and Pang, N.S. (2020) Research on Construction Risk Evaluation of EPC Project of Transmission and Distribution Engineering Based on Design Enterprise. 2020 International Conference on Energy, Environment and Bioengineering, Xi’an, 7-9 August 2020, Vol. 185, 01011.</mixed-citation></ref><ref id="scirp.126680-ref14"><label>14</label><mixed-citation publication-type="other" xlink:type="simple">Wu, X., Wan, B. and Lu, Y. (2006) Study on Electromagnetic Environment for 1000 kV AC Transmission Line. High Voltage Engineering, 32, 55-58.</mixed-citation></ref><ref id="scirp.126680-ref15"><label>15</label><mixed-citation publication-type="other" xlink:type="simple">Chen, Q., Jin, Z., Xia, B., Wu, P. and Skitmore, M. (2016) Time and Cost Performance of Design-Build Projects. Journal of Construction Engineering and Management, 142, Article ID: 04015074.  
https://doi.org/10.1061/(ASCE)CO.1943-7862.0001056</mixed-citation></ref><ref id="scirp.126680-ref16"><label>16</label><mixed-citation publication-type="other" xlink:type="simple">Chen, Q., Xia, B., Jin, Z., Wu, P. and Hu Y. (2016) Choosing Appropriate Contract Methods for Design-Build Projects. Journal of Management in Engineering, 32, Article ID: 04015029. https://doi.org/10.1061/(ASCE)ME.1943-5479.0000393</mixed-citation></ref><ref id="scirp.126680-ref17"><label>17</label><mixed-citation publication-type="other" xlink:type="simple">Qiang, M., Wen, Q., Jiang, H. and Yuan S. (2015) Factors Governing Construction Project Delivery Selection: A Content Analysis. International Journal of Project Management, 33, 1780-1794. https://doi.org/10.1016/j.ijproman.2015.07.001</mixed-citation></ref><ref id="scirp.126680-ref18"><label>18</label><mixed-citation publication-type="other" xlink:type="simple">Chan, A.P.C., Scott, D. and Chan, A.P.L. (2004) Factors Affecting the Success of a Construction Project. Journal of Construction Engineering and Management, 130, 153-155. https://doi.org/10.1061/(ASCE)0733-9364(2004)130:1(153)</mixed-citation></ref><ref id="scirp.126680-ref19"><label>19</label><mixed-citation publication-type="other" xlink:type="simple">Yang, B., Qiang, M. and Lin, Z. (2010) Study on Classification of Owner-Consultant Structure for Engineering Projects. Journal of Hydroelectric Engineering, 29, 19-23.</mixed-citation></ref><ref id="scirp.126680-ref20"><label>20</label><mixed-citation publication-type="other" xlink:type="simple">Lu, P., Guo, S., Qian, L., He, P. and Xu, X. (2015) The Effectiveness of Contractual and Relational Governances in Construction Projects in China. International Journal of Project Management, 33, 212-222.  
https://doi.org/10.1016/j.ijproman.2014.03.004</mixed-citation></ref><ref id="scirp.126680-ref21"><label>21</label><mixed-citation publication-type="other" xlink:type="simple">Chen, P., Qiang, M. and Wang, J.N. (2009) Project Management in the Chinese Construction Industry: Six-Case Study. Journal of Construction Engineering and Management, 135, 1016-1026.  
https://doi.org/10.1061/(ASCE)CO.1943-7862.0000067</mixed-citation></ref><ref id="scirp.126680-ref22"><label>22</label><mixed-citation publication-type="other" xlink:type="simple">Azhar, N., Kang, Y. and Ahmad, I.U. (2014) Factors Influencing Integrated Project Delivery in Publicly Owned Construction Projects: An Information Modelling Perspective. Procedia Engineering, 77, 213-221.  
https://doi.org/10.1016/j.proeng.2014.07.019</mixed-citation></ref><ref id="scirp.126680-ref23"><label>23</label><mixed-citation publication-type="other" xlink:type="simple">Baccarini, D. (1996) The Concept of Project Complexity—A Review. International Journal of Project Management, 14, 201-204.  
https://doi.org/10.1016/0263-7863(95)00093-3</mixed-citation></ref><ref id="scirp.126680-ref24"><label>24</label><mixed-citation publication-type="other" xlink:type="simple">Chen, Y.Q., Liu, J.Y., Li, B. and Lin, B. (2011) Project Delivery System Selection of Construction Projects in China. Expert Systems with Applications, 38, 5456-5462.  
https://doi.org/10.1016/j.eswa.2010.10.008</mixed-citation></ref><ref id="scirp.126680-ref25"><label>25</label><mixed-citation publication-type="other" xlink:type="simple">Saaty, T.L. (1990) How to Make a Decision: The Analytic Hierarchy Process. European Journal of Operational Research, 48, 9-26.  
https://doi.org/10.1016/0377-2217(90)90057-I</mixed-citation></ref><ref id="scirp.126680-ref26"><label>26</label><mixed-citation publication-type="other" xlink:type="simple">Naziris, I.A., Lagaros, N.D. and Papaioannou, K. (2016) Optimized Fire Protection of Cultural Heritage Structures Based on the Analytic Hierarchy Process. Journal of Building Engineering, 8, 292-304. https://doi.org/10.1016/j.jobe.2016.08.007</mixed-citation></ref><ref id="scirp.126680-ref27"><label>27</label><mixed-citation publication-type="other" xlink:type="simple">Higgins, M. and Benaroya, H. (2020) Utilizing the Analytical Hierarchy Process to Determine the Optimal Lunar Habitat Configuration. Acta Astronautica, 173, 145-154. https://doi.org/10.1016/j.actaastro.2020.04.012</mixed-citation></ref><ref id="scirp.126680-ref28"><label>28</label><mixed-citation publication-type="other" xlink:type="simple">Wang, H., Xu, C., Di, R. and Xu, Z. (2022) Analytic Hierarchical Process with Stochastic Uncertainty: A Case Study of Governmental Audits in China. Information Sciences, 608, 1072-1092. https://doi.org/10.1016/j.ins.2022.07.020</mixed-citation></ref><ref id="scirp.126680-ref29"><label>29</label><mixed-citation publication-type="other" xlink:type="simple">Liu, P., Diao, H., Zou, L. and Deng, A. (2020) Uncertain Multi-Attribute Group Decision Making Based on Linguistic-Valued Intuitionistic Fuzzy Preference Relations. Information Science, 508, 293-308. https://doi.org/10.1016/j.ins.2019.08.076</mixed-citation></ref></ref-list></back></article>