TITLE:
Production-Reinjection Regulation and Risk Management of a Deep Sandstone Geothermal Reservoir under Reinjection-Capacity Constraints: A Planning Analysis for the Geothermal Project of the University Student Entrepreneurship Park in Binzhou High-Tech Zone
AUTHORS:
Shaofeng Yao, Guoqiang Fu, Xiaobin Xu, Jianxin Feng, Fengrui Wu
KEYWORDS:
Deep Sandstone Geothermal Reservoir, Reinjection Capacity, Reinjection Ratio, Production-Reinjection Regulation, Hydraulic Head Response, Supervision Checkpoints
JOURNAL NAME:
Engineering,
Vol.18 No.11,
November
25,
2026
ABSTRACT: In the development of deep sandstone geothermal reservoirs, target reinjection ratios are often set without verifying the reinjection capacity, and volumetric balance is frequently taken as evidence of pressure recovery. Taking the geothermal project of the University Student Entrepreneurship Park in Binzhou High-tech Zone as an example, this paper establishes an operating window jointly constrained by the reference production rate, the target reinjection ratio and the sustainable reinjection capacity. Because the reinjection well of the project is still at the planning stage, the production-side inputs are taken from the project report, whereas the reinjection capacity is represented by assumed scenarios; the quantitative results are therefore scenario-based and illustrate the planning logic rather than predict site performance. From the production volume, the heating-season duration and the daily operating hours, the reinjection capacity required to reach different target reinjection ratios at a specified production rate is determined, and the limiting production rate that keeps the reinjection ratio unchanged when the reinjection capacity declines is also examined. An idealized analysis based on the superposition of Theis well-flow solutions shows that volumetric balance between production and reinjection alone is not sufficient to establish hydraulic head recovery at every evaluation location. A management procedure of capacity verification, plan matching and operational review is therefore proposed, centered on the reinjection capacity margin, the specific injectivity (the reinjection rate per unit increase in hydraulic head) and the separate assessment of hydraulic head, water temperature and water quality. The corresponding supervision checkpoints are also identified. The results provide a reference for reviewing operating plans and for designing reinjection tests and monitoring programs in similar projects.