Article citationsMore>>

Yu, M., Li, T., & Ma, J. (2022). Joint Optimization Method of Production Scheduling for Prefabricated Components Based on Preventive Maintenance. In 2022 41st Chinese Control Conference (CCC) (pp. 1940-1944). IEEE.
https://doi.org/10.23919/CCC55666.2022.9901757

has been cited by the following article:

SCIRP Newsletter
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top