Article citationsMore>>

Tahir, M.M., Haron, N.A., Alias, A.H. and Diugwu, I.A. (2019) Causes of Delay and Cost Overrun in the Malaysian Construction Industry. In: Pradhan, B., Ed., GCEC 2017: Proceedings of the 1st Global Civil Engineering Conference, Springer, Singapore.
https://doi.org/10.1007/978-981-10-8016-6

has been cited by the following article:

SCIRP Newsletter
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top