Article citationsMore>>

Geng, D., et al. (2013) Optimization Study of Subway Station Underground Excavation Construction Method Based on Fuzzy Theory. In: Zhao, S., Xie, Y.M., Liu, H. and Gao, D., Eds., Civil Engineering, Architecture and Sustainable Infrastructure II, PTS 1 and 2, Applied Mechanics and Materials (Volumes 438-439), Trans Tech Publications Ltd., Stafa-Zurich, 1015-1019.
https://doi.org/10.4028/www.scientific.net/AMM.438-439.1015

has been cited by the following article:

SCIRP Newsletter
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top