has been cited by the following article(s):
|
[1]
|
A perspective for the acceptance of water reuse: history of the valorization of wastewater throughout the development of society
|
|
Water Policy,
2024 |
|
|
|
|
[2]
|
SOIL-STRUCTURE INTERACTION OF CUT AND COVER TUNNEL USING TIRE-DERIVED AGGREGATES ABOVE CROWN LEVEL
|
|
2024 |
|
|
|
|
[3]
|
Prehospital medical management in Swedish road tunnel incidents
|
|
2023 |
|
|
|
|
[4]
|
Underground urbanism in Africa: Splintered subterranean space in Lagos, Nigeria
|
|
Urban Studies,
2023 |
|
|
|
|
[5]
|
Tendencias de innovación en obras subterráneas: el ejemplo del túnel de Arnotegi en Bilbao
|
|
2022 |
|
|
|
|
[6]
|
Challenges for the Implementation of BIM Methodology in the Execution of Underground Works
|
|
Paz, J Rico - Buildings,
2022 |
|
|
|
|
[7]
|
Innovation Trends in Underground Works: The Example of the Arnotegi Tunnel in Bilbao
|
|
Marcos, MB Prendes-Gero… - Designs,
2022 |
|
|
|
|
[8]
|
Innovation Trends in Underground Works: The Example of the Arnotegi Tunnel in Bilbao. Designs 2022, 6, 30
|
|
Marcos,
2022 |
|
|
|
|
[9]
|
Podzemna trasa rimskog akvedukta Biba–Jader
|
|
Diadora: glasilo Arheološkog muzeja u Zadru,
2021 |
|
|
|
|
[10]
|
Topics of Analytical and Computational Methods in Tunnel Engineering
|
|
2020 |
|
|
|
|
[11]
|
Challenging sub terra nullius: a critical underground urbanism project
|
|
2020 |
|
|
|
|
[12]
|
The Final Phase: The Turkish Security Wall
|
|
2020 |
|
|
|
|
[13]
|
Modelos hidrológicos para pequenas bacias urbanas: Um estudo teórico-experimental.
|
|
2020 |
|
|
|
|
[14]
|
Review of historic forensic geotechnical engineering
|
|
2018 |
|
|
|
|
[1]
|
Establish a reasonable assessment method using 3D simulation technology for the safety of historical tunnel
Journal of Asian Architecture and Building Engineering,
2025
DOI:10.1080/13467581.2025.2517907
|
|
|
|
|
[2]
|
A perspective for the acceptance of water reuse: history of the valorization of wastewater throughout the development of society
Water Policy,
2024
DOI:10.2166/wp.2024.196
|
|
|
|
|
[3]
|
Development of BIM‐Based Tunnel Information Modeling Prototype for Tunnel Design
Advances in Civil Engineering,
2024
DOI:10.1155/2024/8118578
|
|
|
|
|
[4]
|
Underground urbanism in Africa: Splintered subterranean space in Lagos, Nigeria
Urban Studies,
2023
DOI:10.1177/00420980231174996
|
|
|
|
|
[5]
|
Innovation Trends in Underground Works: The Example of the Arnotegi Tunnel in Bilbao
Designs,
2022
DOI:10.3390/designs6020030
|
|
|
|
|
[6]
|
Challenges for the Implementation of BIM Methodology in the Execution of Underground Works
Buildings,
2022
DOI:10.3390/buildings12030309
|
|
|
|
|
[7]
|
Tunnel Engineering - Selected Topics [Working Title]
2020
DOI:10.5772/intechopen.90849
|
|
|
|
|
[8]
|
Challenging sub terra nullius: a critical underground urbanism project
Australian Geographer,
2020
DOI:10.1080/00049182.2020.1723829
|
|
|
|
|
[9]
|
Construction in Geotechnical Engineering
Lecture Notes in Civil Engineering,
2020
DOI:10.1007/978-981-15-6090-3_55
|
|
|
|