has been cited by the following article(s):
|
[1]
|
Automated Management of Time Extension Claims
|
|
Journal of Legal Affairs and Dispute …,
2024 |
|
|
|
|
[2]
|
Resource allocation capabilities of commercial project management software packages for resource leveling and resource constrained project scheduling …
|
|
Journal of Construction …,
2023 |
|
|
|
|
[3]
|
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
|
|
Materials Today: Proceedings,
2023 |
|
|
|
|
[4]
|
DAILY ProM SOFTWARE.
|
|
… of Technological & …,
2023 |
|
|
|
|
[5]
|
Melhoria das operações de um armazém interno numa empresa do setor da construção
|
|
2022 |
|
|
|
|
[6]
|
Studi Literatur: Alternatif Pengganti Microsoft Project dalam Proses Penjadwalan Proyek
|
|
Jurnal Cakrawala …,
2022 |
|
|
|
|
[7]
|
Automated Computer Vision-Based Construction Progress Monitoring: A Systematic Review
|
|
Buildings,
2022 |
|
|
|
|
[8]
|
The relevance of project management software's features in the United Arab Emirates
|
|
International Journal of …,
2021 |
|
|
|
|
[9]
|
Construction Project Planning and Scheduling: A Case of Inlet Separator Fabrication
|
|
Journal of Economics, Finance and Management Studies,
2021 |
|
|
|
|
[10]
|
An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing
|
|
2021 |
|
|
|
|
[11]
|
Application of ICT in Resource Management on Construction Projects in India
|
|
2020 |
|
|
|
|
[12]
|
Comparison and Assessment of Using Primavera and Microsoft Project in Construction Projects in Erbil City
|
|
2019 |
|
|
|
|
[13]
|
A review of methods, techniques and tools for project planning and control
|
|
International Journal of Production Research,
2018 |
|
|
|
|
[14]
|
Sistem Manajemen Pembelajaran Awan Berbasis Perangkat Lunak Sebagai Suatu Layanan Analisis Deskriptif
|
|
2018 |
|
|
|
|
[15]
|
Evaluation of Microsoft Project and Primavera P6 as Construction Project Management Software in India
|
|
… Journal of Innovations in Engineering Research …,
2018 |
|
|
|
|
[16]
|
Decision Making Towards Integration of Sustainability Into Project Management: A Multilevel Theory Building Approach
|
|
2017 |
|
|
|
|
[17]
|
A Study of Computer Application in Resource Management and Developing a Model Network Adoption in Construction Projects
|
|
2017 |
|
|
|
|
[18]
|
Decision Making Towards Integration of Sustainability Into Project Management; A Multilevel Theory Building Approach
|
|
Management and Production Engineering Review,
2017 |
|
|
|
|
[19]
|
Planning the study of public passenger transport by Microsoft Project 2010
|
|
2016 |
|
|
|
|
[20]
|
Planeación y programación del mejoramiento de la vía piñas grande pata grande de la ciudad de Piñas aplicando Microsoft Project
|
|
2016 |
|
|
|
|
[21]
|
АНАЛИЗ МЕТОДОВ И ТЕХНОЛОГИЙ ОБЕСПЕЧЕНИЯ ИНФОРМАЦИОННОГО РЕСУРСА ЭКОНОМИЧЕСКОГО ОБОСНОВАНИЯ ПРОЕКТНЫХ РЕШЕНИЙ
|
|
Современные проблемы науки и образования,
2015 |
|
|
|
|
[22]
|
THE EFFECTIVE CONTRIBUTION OF SOFTWARE APPLICATIONS IN VARIOUS DISCIPLINES OF CIVIL ENGINEERING
|
|
Journal Impact Factor,
2014 |
|
|
|
|
[1]
|
Automated Management of Time Extension Claims
Journal of Legal Affairs and Dispute Resolution in Engineering and Construction,
2024
DOI:10.1061/JLADAH.LADR-1104
|
|
|
|
|
[2]
|
Visual versus Tabular Scheduling Programs
Buildings,
2024
DOI:10.3390/buildings14103084
|
|
|
|
|
[3]
|
Automated Computer Vision-Based Construction Progress Monitoring: A Systematic Review
Buildings,
2022
DOI:10.3390/buildings12071037
|
|
|
|
|
[4]
|
Increasing the potential application of Microsoft project and Primavera P6 for project management: A comparative analysis of the residential project
Materials Today: Proceedings,
2022
DOI:10.1016/j.matpr.2022.11.485
|
|
|
|
|
[5]
|
An Approach to the Analysis of Causes of Delays in Industrial Construction Projects through Planning and Statistical Computing
Sustainability,
2021
DOI:10.3390/su13073975
|
|
|
|
|
[6]
|
A review of methods, techniques and tools for project planning and control
International Journal of Production Research,
2018
DOI:10.1080/00207543.2018.1524168
|
|
|
|