has been cited by the following article(s):
|
[1]
|
A dual-risk perspective: conflict of interest between engineering and business risk management
Engineering, Construction and Architectural Management,
2026
DOI:10.1108/ECAM-12-2025-2038
|
|
|
|
|
[2]
|
Planning and Design of an Integrated Railway–Highway Infrastructure: A Review
Journal of Transportation Engineering, Part A: Systems,
2025
DOI:10.1061/JTEPBS.TEENG-8329
|
|
|
|
|
[3]
|
External Quality Assurance of the Fehmarn Belt Fixed Link Business Case—Too Little, Too Late, and Too Unreliable
Journal of Financial Risk Management,
2017
DOI:10.4236/jfrm.2017.62011
|
|
|
|