Biography

Prof. Sangyong Kim

Yeungnam University, South Krorea


Email: [email protected], [email protected]


Qualifications

Ph. D., University of Reading, Construction Management and Engineering

M. Sc.,  Korea University, Construction Management and Material

B. S.,  Korea University, Civil and Environmental Engineering

B. S.,  Korea University, Physics


Publications (Selected)

  1. Kang, S., Kim, S., & Kim, S. (2025). Improvement of the defect inspection process of deteriorated buildings with scan to BIM and image-based automatic defect classification. Journal of Building Engineering, 99, 111601.
  2. Kang, S., Kim, S., & Kim, S. (2025). Automatic detection and classification process for concrete defects in deteriorating buildings based on image data. Journal of Asian Architecture and Building Engineering, 24(4), 2773-2787.
  3. Whang, S. W., Donyavi, S., Flanagan, R., & Kim, S. (2023). Contractor-led design risk management in international large project: Korean contractor’s perspective. Journal of Asian Architecture and Building Engineering, 22(3), 1387-1398.
  4. Whang, S. W., Donyavi, S., Flanagan, R., & Kim, S. (2022). Balanced approach for tendering practice at the pre-contract stage: The UK practitioner’s perspective. Journal of Civil Engineering and Management, 28(5), 338-348.
  5. Kang, S., Kim, S., Lee, D., & Kim, S. (2020). Inter-Floor Noise Monitoring System for Multi-Dwelling Houses Using Smartphones. Sustainability, 12(12), 5065.
  6. Kang, S., Kim, S., Kim, S., & Lee, D. (2020). System dynamics model for the improvement planning of school building conditions. Sustainability, 12(10), 4235.
  7. Kim, S., Kim, S., & Lee, D. E. (2020). Sustainable application of hybrid point cloud and BIM method for tracking construction progress. Sustainability, 12(10), 4106.
  8. Kim, S., Kim, S., & Lee, D. E. (2020). 3D point cloud and BIM-based reconstruction for evaluation of project by as-planned and as-built. Remote Sensing, 12(9), 1457.
  9. Kim, S., Lee, D. E., Kim, Y., & Kim, S. (2020). Development and application of precast concrete double wall system to improve productivity of retaining wall construction. Sustainability, 12(8), 3454.
  10. Kim, S., Kim, S., & Lee, D. (2018). Sequential dependency structure matrix based framework for leveling of a tower crane lifting plan. Canadian Journal of Civil Engineering, 45(6), 516-525.
  11. Kim, S., & Kim, S. (2018). Opportunities for construction site monitoring by adopting first personal view (FPV) of a drone. Smart Struct. Syst, 21, 139-149.
  12. Kim, S., Whang, S. W., & Kim, S. (2017). Pile foundation design through the increased bearing capacity of extended end pile. Journal of Asian Architecture and Building Engineering, 16(2), 395-402.
  13. Kim, S., Whang, S. W., Kim, S., & Hyung, W. G. (2017). Application of extended end composite pile design in pile foundation work. Proceedings of the Institution of Civil Engineers-Geotechnical Engineering, 170(5), 455-465.
  14. Kim, S., Whang, S. W., Lee, Y. D., Shin, Y., & Kim, G. H. (2017). Comparison of high-strength steel pipe and H-shaped steel in the strut of a braced wall system. Journal of Asian Architecture and Building Engineering, 16(1), 179-184.
  15. Whang, S. W., Flanagan, R., Kim, S., & Kim, S. (2017). Contractor-led critical design management factors in high-rise building projects involving multinational design teams. Journal of Construction Engineering and Management, 143(5), 06016009.
  16. Lee, D., Kim, S., & Kim, S. (2016). Development of hybrid model for estimating construction waste for multifamily residential buildings using artificial neural networks and ant colony optimization. Sustainability, 8(9), 870.


Profile Details

https://www.yu.ac.kr/english/academics/graduate-engineering.do

https://www.researchgate.net/profile/Sangyong-Kim-2

SCIRP Newsletter
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top