Biography

Dr. Yoonseok Shin

Plant and Architectural Engineering

Kyonggi University

Assistant Professor


Email: [email protected]


Publications (Selected)

  1. Kim, S., Whang, S. W., Lee, Y. D., Shin, Y., & Kim, G. H. (2017). Comparison of high-strength steel pipe and H-shaped steel in the strut of a braced wall system. Journal of Asian Architecture and Building Engineering, 16(1), 179-184.
  2. Shin, Y., Kim, D., Kim, T. Y., & Kim, G. H. (2016). Daily reporting system using digital pen at construction site. Journal of the Korea Institute of Building Construction, 16(2), 177-183.
  3. Kim, D., Kim, T. Y., Shin, Y., & Kim, G. H. (2016). Digital Pen System for Inputting the Actual Amount of Labor Input at Construction Site. Journal of the Korea Institute of Building Construction, 16(2), 133-140.
  4. Yang, G., Ann, J. S., Kim, D., Kim, G. H., & Shin, Y. (2016). Analysis of Living Noise in a Multi-unit Dwelling using Acoustic Simulation. Journal of the Korea Institute of Building Construction, 16(1), 87-96.
  5. Shin, D. W., Shin, Y., & Kim, G. H. (2016). Comparison of risk assessment for a nuclear power plant construction project based on analytic hierarchy process and fuzzy analytic hierarchy process. Journal of building construction and planning research, 4(3), 157-171.
  6. Kim, D., Shin, D. W., Shin, Y., Kim, G. H., Yoo, S., & Park, W. (2015). Improvements of the bidding process through order case analysis of specialty construction. Journal of The Korea Institute of Building Construction, 15(5), 507-514.
  7. Han, I. H., Yang, G. N., Kim, S., Kim, G. H., & Shin, Y. (2015). Decision Making Method Based on Importance‐Dangerousness Analysis for the Potential Risk Behavior of Construction Laborers. Mathematical Problems in Engineering, 2015(1), 502121.
  8. Shin, D. W., Shin, Y., & Kim, G. H. (2015). Analysis on Risk Factors of Reactor Containment Building Construction using Analytic Hierarchy Process. Journal of the Korea Institute of Building Construction, 15(4), 425-431.
  9. Kim, S., Kim, J. D., Shin, Y., & Kim, G. H. (2015). Cultural differences in motivation factors influencing the management of foreign laborers in the Korean construction industry. International Journal of Project Management, 33(7), 1534-1547.
  10. Kim, S., Whang, S. W., Kim, G. H., & Shin, Y. (2015). Comparative study on the construction cost including carbon emission cost for masonry walls. Energy and Buildings, 96, 187-192.
  11. Kim, S., Kim, J. D., Cho, H., Shin, Y., & Kim, G. H. (2015). Finding cultural differences and motivation factors of foreign construction workers. Journal of Building Construction and Planning Research, 3(2), 35-46.
  12. Kim, G. H., & Shin, Y. (2014). Building construction education adopted team-based learning. Journal of the Korea Institute of Building Construction, 14(6), 597-604.
  13. Jang, Y. J., Kim, S., Shin, Y., & Kim, G. H. (2014). Economic analysis of geothermal energy facilities applied to public buildings. Journal of the Korea institute of building construction, 14(5), 423-432.
  14. Shin, D. W., Lee, Y. D., Shin, Y., Kim, G. H., Yoo, S., & Park, W. (2014). Study on improvement of cost calculation method in construction less than one day workload. Journal of the Korea Institute of Building Construction, 14(5), 477-485.


Profile Details

https://www.researchgate.net/profile/Yoonseok-Shin

SCIRP Newsletter
Copyright © 2006-2026 Scientific Research Publishing Inc. All Rights Reserved.
Top